Decision 91-08
https://had.aer.ca/link/decision51
- Applicant
- Home Oil Company Limited
- Scurry-Rainbow Oil Limited
- Application Number
- 901851
- 901852
- 901853
- 910048
- 910049
- Title
- Decision 91-08 : Home Oil Company Limited and Scurry-Rainbow Oil Limited : Application for a Hamburg area, common processor, rateable take, special two-section gas drilling spacing unit, sweet natural gas pipeline, fuel gas pipeline
- Date
- 1991
- Title
- Decision 91-08 : Home Oil Company Limited and Scurry-Rainbow Oil Limited : Application for a Hamburg area, common processor, rateable take, special two-section gas drilling spacing unit, sweet natural gas pipeline, fuel gas pipeline
- Date
- 1991
- Application Number
- 901851
- 901852
- 901853
- 910048
- 910049
- Hearing Panel
- Prince JP
- Bietz BF
- Langlo CA
- Hearing Type
- Board
- Category
- Common processor
- Pipelines
- Rateable take
- Spacing
- Descriptors
- Common processor
- Drilling spacing unit
- Fuel gas pipeline
- Gas pipeline
- Hamburg area
- Pipeline construction permit
- Rateable take of gas
- Slave Point Fm
- Capacity
- Drainage
- Economic analysis
- Equity
- Gas processing
- Gas processing plant
- Gas producing
- Gas reserve
- Liquefied natural gas
- NTS 84E
- Target area
- Unitization
- Legal References
- Oil and Gas Conservation Act S23
- Oil and Gas Conservation Act S37
- Oil and Gas Conservation Act S42
- Oil and Gas Conservation Act S45
- Oil and Gas Conservation Regulations S4.040
- Notes
- Decision D91-8 on application No. 901851 for an Order declaring Shell to be a common processor of natural gas and NGL produced from the Hamburg Slave Point A pool; on application No. 901852 for an Order distributing production among certain wells in the A pool; on application No. 901853 for an Order establishing sections 8-9 of TP.97, R.11, W6M as a special DSU with the target area being within the DSU and having sides 300 metres from the sides of the DSU, for the production of gas from the Slave point FM; on application No. 910048 and No. 910049 for the aforementioned orders to be effective as of the date of these applications for approval to construct 4.5 MMKM of 168.3 MM OD natural gas pipeline from an existing well in Lsd 4 Sec 9 Twp 97 Rge 11 W6M to the existing Shell gas processing plant in Lsd 11 Sec 29 Twp 96 Rge 11 W6M and for an associated 60.3 MM of fuel gas pipeline from the gas plant to the well; ERCB hearing held 1991-02-26
- Interveners
- Columbia Gas Development of Canada Ltd.
- Encor Energy Corporation Inc.
- Gulf Canada Resources Limited
- Husky Oil Operations Ltd.
- Shell Canada Limited
- Voyager Energy Inc.
- Location
- 04-09-097-11W6
- 11-29-096-11W6