Decision 2002-17
https://had.aer.ca/link/decision3502
- Applicant
- ESBI Alberta Ltd.
- Application Number
- 1248859
- File No. 1804-4
- Title
- Decision 2002-17: ESBI Alberta Ltd. transmission congestion management principles application Part A: scope of proceeding
- Date
- 2002
- Title
- Decision 2002-17: ESBI Alberta Ltd. transmission congestion management principles application Part A: scope of proceeding
- Date
- 2002
- Applicant
- ESBI Alberta Ltd.
- Application Number
- 1248859
- File No. 1804-4
- Hearing Panel
- MacDonald NW
- McManus BT
- Lock RG
- Hearing Type
- Utilities
- Category
- Electric power
- Descriptors
- Cost of service
- General tariff application
- Electric power distribution
- Electric power rate
- Electric power transmission
- Load control
- Management system
- Planning
- Production rate
- Transmission administrator
- Notes
- EUB's decision on an application by ESBI seeking approval of the principles and recommendations respecting the role of the Transmission administrator in its obligation to expand the AIES to remedy congestion, the principles that form the basis of future congestion management policy, and how expansion costs will be allocated among customers. Interested parties were subsequently directed to adhere to the scope of the EAL Congestion Management Principles Application Proceeding as set out in this Decision.
- Interveners
- AltaLink Management Ltd.
- ATCO Electric Ltd.
- ATCO Power Ltd.
- City of Calgary
- Canadian Natural Resources Limited
- Engage Energy
- ENMAX Power Corporation
- EPCOR Utilities Inc.
- City of Lethbridge
- City of Red Deer
- PanCanadian Energy
- Suncor
- Independent Power Producers Society of Alberta
- Powerex Corp.
- Alberta Federation of REA's Ltd.
- Alberta Association of Municipal Districts & Counties
- Alberta Irrigation Projects Association
- Alberta Urban Municipalities Association
- Consumer's Coalition of Alberta
- Public Institutional Consumers of Alberta
- Senior Petroleum Producers Association