287 records – page 1 of 15.

Decision 84-12

https://had.aer.ca/link/decision1959
Applicant
TransAlta Utilities Corporation
Application Number
840007
Title
Decision on application by Sinnott (A.E.), 1984 (wind-powered electric generator of A.E. Sinnott near Pincher Creek)
Date
1984
Title
Decision on application by Sinnott (A.E.), 1984 (wind-powered electric generator of A.E. Sinnott near Pincher Creek)
Date
1984
Applicant
TransAlta Utilities Corporation
Application Number
840007
Hearing Panel
Goodman CJ
Mink FJ
Paterson RG
Hearing Type
Board
Utilities
Category
Electric power
Descriptors
Electric power project
Power system interconnection
Wind power generation
Cost
Electric power rate
Legal References
Hydro and Electric Energy Act S14
Hydro and Electric Energy Act S15
Hydro and Electric Energy Act S17
Notes
Decision D84-12 on application No. 840007 to operate wind- powered electric generator in section 2-7-30 W4M and to connect this generator to the electric distribution system of TransAlta Utilities (allocation of costs and other terms and conditions associated with the interconnection) (Board hearing 84-03-20/21)
Interveners
TransAlta Utilites Corporation
Alberta Power Limited
Nor'wester Energy System Ltd.
Bennett, R.M.
Arsene, W.
Cousins, D.M.
Less detail

Decision 84-14|84-14 Addendum

https://had.aer.ca/link/decision1849
Applicant
ESSO Petroleum Canada, a Division of Imperial Oil Limited
Application Number
840136
Title
Decision on application by ESSO Petroleum Canada, a Division of Imperial Oil Limited, 1984 (to amend ERCB approval HE 8208) (and addendum)
Date
1984
Title
Decision on application by ESSO Petroleum Canada, a Division of Imperial Oil Limited, 1984 (to amend ERCB approval HE 8208) (and addendum)
Date
1984
Applicant
ESSO Petroleum Canada, a Division of Imperial Oil Limited
Application Number
840136
Hearing Panel
DeSorcy GJ
Bohme VE
Goodman CJ
Hearing Type
Board
Utilities
Category
Electric power
Descriptors
Edmonton area
Electric power distribution
Service area
Boundary
Electric power rate
Expansion
Industrial plant
NTS 83H
Oil refinery
Revision
Legal References
Energy Resources Conservation Act S42
Hydro and Electric Energy Act S1
Hydro and Electric Energy Act S4
Hydro and Electric Energy Act S5
Hydro and Electric Energy Act S17
Hydro and Electric Energy Act S26
Notes
Decision D84-14 and addendum (dated Jan. 11, 1985) on application No. 840136 to amend Board approval No. HE 8208 by altering the boundary of the electric distribution system and service area of the City of Edmonton by excluding the ESSO south tank farm.
Interveners
The City of Edmonton
TransAlta Utilities Corporation
Fiberglas Canada Inc.
Industrial Power Consumers Association of Alberta
Less detail

Decision 88-02

https://had.aer.ca/link/decision192
Applicant
Southview Fibre Tech Ltd.
Application Number
871411
Title
Decision on application by Southview Fibre Tech Ltd., 1988 (wood waste power plant Calling Lake area)
Date
1988
Title
Decision on application by Southview Fibre Tech Ltd., 1988 (wood waste power plant Calling Lake area)
Date
1988
Applicant
Southview Fibre Tech Ltd.
Application Number
871411
Hearing Panel
Goodman CJ
Mink FJ
MacDonald NW
Hearing Type
Board
Utilities
Category
Electric power
Descriptors
Calling Lake area
Electric power generation
Industrial plant
Non-utility generation
Wood waste
Cost analysis
Electric power demand
Electric power rate
Forecasting
NTS 83I
Power system interconnection
Legal References
Hydro and Electric Energy Act S17
Notes
Decision D88-02 on application No. 871411 for approval to connect a 30-MW wood burning power plant with the electric system of TransAlta Utilities and to establish the basis for determining the price of power and energy to be sold to TransAlta Utilities.
Interveners
County of Athabasca # 12
TransAlta Utilities Corporation
Alberta Power Limited
Industrial Power Consumers Association
City of Edmonton
City of Calgary
City of Red Deer
City of Lloydminister
Less detail

Decision 88-A

https://had.aer.ca/link/decision193
Applicant
Energy Resources Conservation Board
Public Utilities Board
Application Number
870621
Title
Small power inquiry
Date
1988
Title
Small power inquiry
Date
1988
Applicant
Energy Resources Conservation Board
Public Utilities Board
Application Number
870621
Hearing Panel
Goodman CJ
Mink FJ
Hetherington TD
Dunstan JR
Hearing Type
Board
Utilities
Category
Inquiry
Electric power
Descriptors
Electric power distribution
Electric power generation
Electric power rate
Non-utility generation
Power system interconnection
Renewable energy source
Wind power
Wind power generation
Electric utility
Energy policy
Rate (cost)
Regulation
Notes
ERCB report 88-A (PUB report E88001) on proceeding No. 870621 at the direction of the Lieutenant Governor in Council; inquiry held 1987-10-05 through 1987-10-16
Less detail

Decision 94-04

https://had.aer.ca/link/decision2519
Applicant
Baloil Resources Ltd.
Application Number
931409
Title
Examiner report on application by Baloil Resources Ltd., 1994 (Zama Lake power plant)
Date
1994
Title
Examiner report on application by Baloil Resources Ltd., 1994 (Zama Lake power plant)
Date
1994
Applicant
Baloil Resources Ltd.
Application Number
931409
Hearing Panel
Prince JP
Evans RG
Barfett AC
Dunstan NJR
Hearing Type
Examiners
Utilities
Category
Electric power
Descriptors
Electric power generation
Electric power rate
Non-utility generation
Power system interconnection
Zama Virgo basin
Compensation
Legal References
Hydro and Electric Energy Act S17
Notes
ERCB decision D94-7 and examiners report E94-4 on application no. 931409 to order Alberta Power to connect with and take the electric energy generated by Baloil's proposed power plant at Zama Lake; to establish terms and conditions for determining the basis for payment of compensation by APL for the electric power that would be generated; and adopt the views and recommendations in the ERCB/PUB Small Power Inquiry Report as the basis for setting compensation; and to determine the amount of compensation payable for the electric power that would be generated and set the price for that energy at 4.7 cents per kWh; Concurrent ERCB/PUB hearing 1994-02-08
Interveners
Alberta Power Limited
The City of Lethbridge
The Town of Fort MacLeod
TransAlta Utilities Corporation
Industrial Power Consumers Association
Municipal Intervenors
City of Calgary
Edmonton Power
Alberta Cogenerators Council
Less detail

Decision 94-07

https://had.aer.ca/link/decision2520
Applicant
Baloil Resources Ltd.
Application Number
931409
Title
Decision 94-07 : Baloil Resources Ltd.: Application for a Zama Lake power plant
Date
1994
Title
Decision 94-07 : Baloil Resources Ltd.: Application for a Zama Lake power plant
Date
1994
Applicant
Baloil Resources Ltd.
Application Number
931409
Hearing Panel
Prince JP
Evans RG
Barfett AC
Dunstan NJR
Hearing Type
Examiners
Utilities
Category
Electric power
Descriptors
Electric power generation
Electric power rate
Non-utility generation
Power system interconnection
Zama Virgo basin
Compensation
Legal References
Hydro and Electric Energy Act S17
Notes
ERCB decision D94-7 and examiners report E94-4 on application no. 931409 to order Alberta Power to connect with and take the electric energy generated by Baloil's proposed power plant at Zama Lake; to establish terms and conditions for determining the basis for payment of compensation by APL for the electric power that would be generated; and adopt the views and recommendations in the ERCB/PUB Small Power Inquiry Report as the basis for setting compensation; and to determine the amount of compensation payable for the electric power that would be generated and set the price for that energy at 4.7 cents per kWh; Concurrent ERCB/PUB hearing 1994-02-08
Interveners
Alberta Power Limited
The City of Lethbridge
The Town of Fort Macleod
TransAlta Utilities Corporation
Industrial Power Consumers Association of Alberta
Municipal Intervenors
City of Calgary
Edmonton Power
Alberta Cogenerators Council
Independent Power Producers Society of Alberta
Less detail

Decision 2000-01

https://had.aer.ca/link/decision3141
Applicant
ESBI Alberta Ltd.
Application Number
990005
Title
Decision 2000-01: ESBI Alberta Ltd. 1999/2000 general rate application phase I and phase II
Date
2000
Title
Decision 2000-01: ESBI Alberta Ltd. 1999/2000 general rate application phase I and phase II
Date
2000
Applicant
ESBI Alberta Ltd.
Application Number
990005
Hearing Panel
McManus BT
Berg AJ
MacDonald NW
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Public utility
Electric power rate
Electric power transmission
Rate (cost)
General rate application
Price regulation
Order U99018
Management fee
Legal References
Electric Utilities Act S49
Electric Utilities Act S67
Electric Utilities Deficiency Correction Regulation
Notes
Decision on a general tariff application for approval of revenue requirements for 1999 and 2000 (phase 1) and revised rate design (phase 2)
Decision orders that company refile proposed rates and options, rate riders, and including implementation dates for certain tariffs
Both phases must be refiled after circulation to all affected parties for comments
Board hearing 1999-09-15 & 16 / 2000-09-20 through 24
Approval
Deferred
Less detail

Decision 2000-02

https://had.aer.ca/link/decision3144
Applicant
ATCO Electric Limited
Application Number
980545
Title
Decision 2000-02: ATCO Electric Ltd. 1999/2000 electric tariff application refiling
Date
2000
Title
Decision 2000-02: ATCO Electric Ltd. 1999/2000 electric tariff application refiling
Date
2000
Applicant
ATCO Electric Limited
Application Number
980545
Hearing Panel
MacDonald NW
McManus BT
Berg AJ
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Electric power rate
General rate application
Decision U99099
Decision U99046
Negotiation
Rate (cost)
Notes
General rate application refiling pursuant to decision U99099, based on negotiated settlement agreement reached with its customers (decision U99046).
No Board hearing
Approval
Approved
Less detail

Decision 2000-03

https://had.aer.ca/link/decision3145
Applicant
TransAlta Utilities Corporation
Application Number
980546
Title
Decision 2000-03: TransAlta Utilities Corporation 1999/2000 electric tariff application refiling
Date
2000
Title
Decision 2000-03: TransAlta Utilities Corporation 1999/2000 electric tariff application refiling
Date
2000
Applicant
TransAlta Utilities Corporation
Application Number
980546
Hearing Panel
MacDonald NW
McManus BT
Berg AJ
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Electric power rate
General rate application
Decision U99099
Rate (cost)
Notes
TransAlta Utilities Corporation general rate application refiling pursuant to decision U99099. Corrections made to refilings based on submissions of the intervenors, incorporated into transmission terms and conditions
No Board hearing
Approval
Approved
Less detail

Decision 2000-04

https://had.aer.ca/link/decision3146
Applicant
EPCOR Transmission Inc.
Application Number
980547
Title
Decision 2000-04: EPCOR Transmission Inc. 1999/2000 electric tariff application refiling
Date
2000
Title
Decision 2000-04: EPCOR Transmission Inc. 1999/2000 electric tariff application refiling
Date
2000
Applicant
EPCOR Transmission Inc.
Application Number
980547
Hearing Panel
MacDonald NW
McManus BT
Berg AJ
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Electric power rate
General rate application
Decision U99099
Rate (cost)
Notes
EPCOR Transmission Inc. general rate application refiling pursuant to decision U99099. No intervenor submissions.
No Board hearing
Approval
Approved
Less detail

Decision 2000-05

https://had.aer.ca/link/decision3147
Applicant
EPCOR Transmission Inc.
Application Number
980550
Title
Decision 2000-05: EPCOR Generation Inc. 1999/2000 electric tariff application refiling
Date
2000
Title
Decision 2000-05: EPCOR Generation Inc. 1999/2000 electric tariff application refiling
Date
2000
Applicant
EPCOR Transmission Inc.
Application Number
980550
Hearing Panel
MacDonald NW
McManus BT
Berg AJ
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Electric power rate
General rate application
Decision U99099
Deferral accounting
Rate (cost)
Notes
EPCOR Generation Inc. general rate application refiling pursuant to decision U99099.
No Board hearing
Approval
Approved
Less detail

Decision 2000-11

https://had.aer.ca/link/decision3148
Applicant
TransAlta Utilities Corporation
Application Number
RE95081
Title
Decision 2000-11: TransAlta Utilities Corporation 1996 general rate application phase II refiling
Date
2000
Title
Decision 2000-11: TransAlta Utilities Corporation 1996 general rate application phase II refiling
Date
2000
Applicant
TransAlta Utilities Corporation
Application Number
RE95081
Hearing Panel
Prince JP
McManus BT
Jainarine H
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Electric power rate
Cost of service
Rate (cost)
Decision U99035
Decision U99105
General rate application
Notes
Decision on a general rate application phase 2 refiling pursuant to decision U99035 where the Board considers new rates reflecting cost characteristics os the restructured industry
Board will review applications for review and variance after refiling decision made
Board orders second refiling
Approval
Deferred upon refiling
Less detail

Decision 2000-12

https://had.aer.ca/link/decision3154
Applicant
TransAlta Utilities Corporation
Application Number
RE95081
Title
Decision 2000-12: TransAlta Utilities Corporation 1996 general rate application phase II - second refiling
Date
2000
Title
Decision 2000-12: TransAlta Utilities Corporation 1996 general rate application phase II - second refiling
Date
2000
Applicant
TransAlta Utilities Corporation
Application Number
RE95081
Hearing Panel
Prince JP
McManus BT
Jainarine H
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Electric power rate
Cost of service
Rate (cost)
Decision D2000-11
Decision U99035
Decision U99105
General rate application
Notes
Decision on a general rate application phase 2 second refiling pursuant to decision D2000-11; rates effective March 1, 2000
Approval
Approved
Less detail

Decision 2000-13

https://had.aer.ca/link/decision3153
Applicant
ATCO Electric Limited
Application Number
RE95080
Title
Decision 2000-13: ATCO Electric Ltd. 1996 electric tariff application refiling - phase II refiling
Date
2000
Title
Decision 2000-13: ATCO Electric Ltd. 1996 electric tariff application refiling - phase II refiling
Date
2000
Applicant
ATCO Electric Limited
Application Number
RE95080
Hearing Panel
McManus BT
Berg AJ
Jainarine H
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Electric power rate
Cost of service
Refiling
Decision U99034
Rate (cost)
Notes
General rate application phase 2 refiling pursuant to decision U99034
No Board hearing
Approval
Deferred upon refiling
Less detail

Decision 2000-14

https://had.aer.ca/link/decision3156
Applicant
TransAlta Utilities Corporation
Application Number
990616
file 5601-15
Title
Decision 2000-14 : TransAlta Utilities Corporation temporary suspension regulation
Date
2000
Title
Decision 2000-14 : TransAlta Utilities Corporation temporary suspension regulation
Date
2000
Applicant
TransAlta Utilities Corporation
Application Number
990616
file 5601-15
Hearing Panel
McManus BT
Miller GJ
Asgar-Deen ML
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Electric power generation
Legal References
Electric Utilities Act S34
Electric Utilities Temporary Suspension Regulation S4
Notes
EUB Decision D2000-14 on application by TransAlta requesting interim relief from unit obligation value payments to Keephills 1 & 2 generating unitsas per Temporary Suspension Regulation Alberta Regulation 284/95
Approval
Approved
Less detail

Decision 2000-15

https://had.aer.ca/link/decision3165
Applicant
ATCO Electric Limited
Application Number
RE95080
Title
Decision 2000-15: ATCO Electric Ltd. 1996 electric tariff application refiling - phase II second refiling
Date
2000
Title
Decision 2000-15: ATCO Electric Ltd. 1996 electric tariff application refiling - phase II second refiling
Date
2000
Applicant
ATCO Electric Limited
Application Number
RE95080
Hearing Panel
McManus BT
Berg AJ
Jainarine H
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Electric power rate
Cost of service
Refiling
Decision U99034
Decision U97065
Decision D2000-13
Rate (cost)
General rate application phase II
Notes
General rate application phase 2 refiling pursuant to decision 2000-13 directions 2 and 4
Includes attached rate schedules and terms and conditions
No Board hearing
Approval
Approved
Less detail

Decision 2000-19

https://had.aer.ca/link/decision3166
Applicant
ATCO Electric Limited
Application Number
980545
file no. 1108-5
Title
Decision 2000-19: ATCO Electric Ltd. 1999/2000 electric tariff application 2000 rate rider application
Date
2000
Title
Decision 2000-19: ATCO Electric Ltd. 1999/2000 electric tariff application 2000 rate rider application
Date
2000
Applicant
ATCO Electric Limited
Application Number
980545
file no. 1108-5
Hearing Panel
MacDonald NW
McManus BT
Berg AJ
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Electric power rate
Decision D2000-02
Rate (cost)
Notes
General rate application rate riders to adjust its rates effective April 1, 2000
No Board hearing
Approval
Approved
Less detail

Decision 2000-24

https://had.aer.ca/link/decision3199
Applicant
ESBI Alberta Ltd.
Application Number
990005
Title
Decision 2000-24: ESBI Alberta Ltd. 1999/2000 tariff application refiling - part A : invitation to bid on credits (IBOC)
Date
2000
Title
Decision 2000-24: ESBI Alberta Ltd. 1999/2000 tariff application refiling - part A : invitation to bid on credits (IBOC)
Date
2000
Applicant
ESBI Alberta Ltd.
Application Number
990005
Hearing Panel
McManus BT
Berg AJ
MacDonald NW
Hearing Type
Utilities
Category
Electric power rate
Descriptors
Public utility
Electric power rate
Electric power transmission
Rate (cost)
General rate application
Refiling
Decision D2000-01
Notes
Decision on tariff application refiling with respect to its proposed Invitation to Bid on Credits process
Approval
Deferred upon refiling
Less detail

Decision 2000-25

https://had.aer.ca/link/decision3200
Applicant
ESBI Alberta Ltd.
Application Number
990005
Title
Decision 2000-25: ESBI Alberta Ltd. 1999/2000 tariff application refiling - part B : tariff and terms and conditions of service
Date
2000
Title
Decision 2000-25: ESBI Alberta Ltd. 1999/2000 tariff application refiling - part B : tariff and terms and conditions of service
Date
2000
Applicant
ESBI Alberta Ltd.
Application Number
990005
Hearing Panel
McManus BT
Berg AJ
MacDonald NW
Hearing Type
Utilities
Category
Electric power rate
Descriptors
Cost of service
Public utility
Electric power rate
Electric power transmission
General rate application
Refiling
Decision D2000-01
Notes
Decision on tariff application refiling respecting tariff and terms and conditions
Approval
Deferred
Less detail

Decision 2000-26

https://had.aer.ca/link/decision3202
Applicant
ATCO Electric Limited
Application Number
980545
file no. 1108-5-1
Title
Decision 2000-26: ATCO Electric Ltd. 1999/2000 electric tariff application 2000 rider G and rider J adjustment application
Date
2000
Title
Decision 2000-26: ATCO Electric Ltd. 1999/2000 electric tariff application 2000 rider G and rider J adjustment application
Date
2000
Applicant
ATCO Electric Limited
Application Number
980545
file no. 1108-5-1
Hearing Panel
MacDonald NW
McManus BT
Berg AJ
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Electric power rate
Decision D2000-19
Rate (cost)
Notes
Rate rider adjustments for billings on and after May 1, 2000
No Board hearing
Approval
Approved
Less detail

287 records – page 1 of 15.