62 records – page 1 of 4.

Decision 74-I

https://had.aer.ca/link/decision2454
Applicant
Energy Resources Conservation Board
Application Number
N/A
Title
Possible interconnection of the Alberta interconnected electric system with nearby systems: a brief preliminary report
Date
1974
Title
Possible interconnection of the Alberta interconnected electric system with nearby systems: a brief preliminary report
Date
1974
Applicant
Energy Resources Conservation Board
Application Number
N/A
Hearing Panel
N/A
Hearing Type
N/A
Utilities
Category
Electric power
Descriptors
Electric power transmission
Power system interconnection
Alberta
Feasibility
Notes
ERCB report 74-I
Less detail

Decision 75-P

https://had.aer.ca/link/decision2352
Applicant
Energy Resources Conservation Board
Application Number
8379
Title
Generation and supply of electric energy in the south-east area of Alberta
Date
1975
Title
Generation and supply of electric energy in the south-east area of Alberta
Date
1975
Applicant
Energy Resources Conservation Board
Application Number
8379
Hearing Panel
Govier GW
DeSorcy GJ
Goodman CJ
Hearing Type
Board
Utilities
Category
Electric power
Descriptors
Electric power demand
Electric power distribution
Electric power generation
Electric power supply
Electric power transmission
Transmission line
Economic forecasting
Forecasting
NTS 72E
NTS 72L
NTS 82H
NTS 82I
Planning
Southern Alberta
Notes
ERCB report 75-P on proceeding No. 8379 to consider the development and operation of facilities for the area of Alberta for a 15-YR period starting in January 1975; Board hearing 1975-06-03/04
Less detail

Decision 84-01

https://had.aer.ca/link/decision2267
Applicant
Energy Resources Conservation Board
Application Number
821051
Title
Decision 84-01: Requirements for major electric transmission lines in the Edmonton area: Inquiry
Date
1984
Title
Decision 84-01: Requirements for major electric transmission lines in the Edmonton area: Inquiry
Date
1984
Applicant
Energy Resources Conservation Board
Application Number
821051
Hearing Panel
Millard V
Bohme VE
Goodman CJ
Hearing Type
Board
Utilities
Category
Inquiry
Transmission line
Descriptors
Edmonton area
Electric power transmission
Transmission line
Electric power demand
Land use
NTS 83H
Planning
Regional planning
Route selection
Transmission corridor
Transportation corridor
Notes
Decision D84-1 on Board inquiry (proceeding No. 821051) for transmission lines in the Edmonton area (covering TP.50-56, R.20-26, W4M); Board hearing 1983-07-05/06
Interveners
Electric Utility Planning Council
Edmonton Metropolitan Regional Planning Commission
Stewart, Weir & Co.
Transport Canada
City of Edmonton
City of St. Albert
TransAlta Utilities Corporation
Alberta Government Telephones
Less detail

Decision 95-03

https://had.aer.ca/link/decision2545
Applicant
City of Calgary Electric System
Application Number
930711
Title
Decision 95-03 : The City of Calgary Electric System : Application to construct and operate a 138-kV transmission line (36.82L)
Date
1995
Title
Decision 95-03 : The City of Calgary Electric System : Application to construct and operate a 138-kV transmission line (36.82L)
Date
1995
Applicant
City of Calgary Electric System
Application Number
930711
Hearing Panel
Prince JP
Purvis RA
Sharp KG
Hearing Type
Board
Utilities
Category
Transmission line
Descriptors
Electric power transmission
Route selection
Transmission line
Power system interconnection
Electric power supply
Legal References
Hydro and Electric Energy Act S12
Hydro and Electric Energy Act S14
Hydro and Electric Energy Act S17
Notes
Decision on application to construct and operate a 138-kV single-circuit wood-pole transmission line designated as 36.82L. The line would extend about 15 km and would go from TransAlta Utilities existing Sarcee substation 42S to the city's No. 36 substation in west Calgary.
Interveners
Philco Farms Ltd.
Phillips, A.Sr.
Discovery Ridge Development Corporation
Power Farms Ltd.
Lowry, C.
Amden Investments Ltd.
Wardco Development Corporation
Bobenic, B. Jr.
Metro Development Corp. Ltd.
Paskapoo Slopes Preservation Society
Chinook Winds Adventist Acadamey
Edworthy, J.
Frank, J.
Gimbel, H.
Gimbel, J.
Carl Management Ltd.
Colpitts Ranches
Heimbecker, P.L.
Lennon, G.
Mardborough Properties Inc.
Carburn Aggregates
Tsuu Tina Nation
Less detail

Decision 99-04

https://had.aer.ca/link/decision3041
Applicant
Imperial Oil Resources Limited
Application Number
970488
Title
Decision 99-04: Imperial Oil Resources Limited industrial system designation Cold Lake Expansion Project
Date
1999
Title
Decision 99-04: Imperial Oil Resources Limited industrial system designation Cold Lake Expansion Project
Date
1999
Applicant
Imperial Oil Resources Limited
Application Number
970488
Hearing Panel
Belanger C
Miller GJ
Mink FJ
Hearing Type
Board
Utilities
Category
Electric power
Descriptors
Cogeneration
Cold Lake heavy oil project
Electric power generation
Electric power transmission
Industrial plant
Power system interconnection
Legal References
Electric Utilities Act S2
Electric Utilities Act S73
Hydro and Electric Energy Act S1
Hydro and Electric Energy Act S2
Hydro and Electric Energy Act S12
Hydro and Electric Energy Act S14
Hydro and Electric Energy Act S17
Notes
EUB Decision D99-04 on application 970488 to designate Imperial's new electrical generation, transmission, and distribution systems serving its Cold Lake operations as an "industrial system"; and make rules exempting from the operation of the Electric Utilities Act, electric energy produced from and consumed by the proposed "industrial system", pursuant to section 73(4) of the Electric Utilities Act;
Interveners
Alberta Power Limited
ENMAX Corporation
Industrial Power Consumers Association of Alberta
TransAlta Energy
TransAlta Utilities
Independent Power Producers Society of Alberta And Senior Petroleum Producers Association of Alberta
NOVA Chemicals Limited
ESBI Alberta Limited
Alberta Federation of REAs Limited
Alberta Association of Municipal Districts and Counties And Public Institutional Consumers Association
Less detail

Decision 2000-01

https://had.aer.ca/link/decision3141
Applicant
ESBI Alberta Ltd.
Application Number
990005
Title
Decision 2000-01: ESBI Alberta Ltd. 1999/2000 general rate application phase I and phase II
Date
2000
Title
Decision 2000-01: ESBI Alberta Ltd. 1999/2000 general rate application phase I and phase II
Date
2000
Applicant
ESBI Alberta Ltd.
Application Number
990005
Hearing Panel
McManus BT
Berg AJ
MacDonald NW
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Public utility
Electric power rate
Electric power transmission
Rate (cost)
General rate application
Price regulation
Order U99018
Management fee
Legal References
Electric Utilities Act S49
Electric Utilities Act S67
Electric Utilities Deficiency Correction Regulation
Notes
Decision on a general tariff application for approval of revenue requirements for 1999 and 2000 (phase 1) and revised rate design (phase 2)
Decision orders that company refile proposed rates and options, rate riders, and including implementation dates for certain tariffs
Both phases must be refiled after circulation to all affected parties for comments
Board hearing 1999-09-15 & 16 / 2000-09-20 through 24
Approval
Deferred
Less detail

Decision 2000-24

https://had.aer.ca/link/decision3199
Applicant
ESBI Alberta Ltd.
Application Number
990005
Title
Decision 2000-24: ESBI Alberta Ltd. 1999/2000 tariff application refiling - part A : invitation to bid on credits (IBOC)
Date
2000
Title
Decision 2000-24: ESBI Alberta Ltd. 1999/2000 tariff application refiling - part A : invitation to bid on credits (IBOC)
Date
2000
Applicant
ESBI Alberta Ltd.
Application Number
990005
Hearing Panel
McManus BT
Berg AJ
MacDonald NW
Hearing Type
Utilities
Category
Electric power rate
Descriptors
Public utility
Electric power rate
Electric power transmission
Rate (cost)
General rate application
Refiling
Decision D2000-01
Notes
Decision on tariff application refiling with respect to its proposed Invitation to Bid on Credits process
Approval
Deferred upon refiling
Less detail

Decision 2000-25

https://had.aer.ca/link/decision3200
Applicant
ESBI Alberta Ltd.
Application Number
990005
Title
Decision 2000-25: ESBI Alberta Ltd. 1999/2000 tariff application refiling - part B : tariff and terms and conditions of service
Date
2000
Title
Decision 2000-25: ESBI Alberta Ltd. 1999/2000 tariff application refiling - part B : tariff and terms and conditions of service
Date
2000
Applicant
ESBI Alberta Ltd.
Application Number
990005
Hearing Panel
McManus BT
Berg AJ
MacDonald NW
Hearing Type
Utilities
Category
Electric power rate
Descriptors
Cost of service
Public utility
Electric power rate
Electric power transmission
General rate application
Refiling
Decision D2000-01
Notes
Decision on tariff application refiling respecting tariff and terms and conditions
Approval
Deferred
Less detail

Decision 2000-37

https://had.aer.ca/link/decision3226
Applicant
ESBI Alberta Ltd.
Application Number
2000135
Title
Decision 2000-37: ESBI Alberta Ltd. 2001 general tariff application phase I and II, pre-hearing conference
Date
2000
Title
Decision 2000-37: ESBI Alberta Ltd. 2001 general tariff application phase I and II, pre-hearing conference
Date
2000
Applicant
ESBI Alberta Ltd.
Application Number
2000135
Hearing Panel
Berg AJ
MacDonald NW
Lock RG
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Interim rate
Electric power rate
Electric power transmission
General rate application phase I
General rate application phase II
Notes
Decision on a general tariff application by ESBI Alberta Ltd. to cancel interim hearing
Approval
Approved
Less detail

Decision 2000-40

https://had.aer.ca/link/decision3235
Applicant
TransAlta Utilities Corporation
Application Number
2000134
file no. 1208-1
Title
Decision 2000-40: TransAlta Utilities Corporation 2001 interim transmission facility owner tariff
Date
2000
Title
Decision 2000-40: TransAlta Utilities Corporation 2001 interim transmission facility owner tariff
Date
2000
Applicant
TransAlta Utilities Corporation
Application Number
2000134
file no. 1208-1
Hearing Panel
MacDonald NW
Berg AJ
Lock RG
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Electric power transmission
Transmission facility owner
Decision D2000-03
Approval
Approved
Less detail

Decision 2000-46

https://had.aer.ca/link/decision3245
Applicant
ESBI Alberta Ltd.
Application Number
2000135
file 1804-1
Title
Decision 2000-46: ESBI Alberta Ltd. 20001 general tariff application phase I and II, part A: system support services - thermal power purchase arrangements (appendix E)
Date
2000
Title
Decision 2000-46: ESBI Alberta Ltd. 20001 general tariff application phase I and II, part A: system support services - thermal power purchase arrangements (appendix E)
Date
2000
Applicant
ESBI Alberta Ltd.
Application Number
2000135
file 1804-1
Hearing Panel
Berg AJ
MacDonald NW
Lock RG
Hearing Type
Utilities
Category
Electric power rate
Descriptors
Decision D2000-25
Decision D2000-35
Electric power rate
Electric power transmission
Legal References
Electric Utilities Act S58
Electric Utilities Act S22
Electric Utilities Act S23
Electric Utilities Act S24
Electric Utilities Act S27
Electric Utilities Act S49
Electric Utilities Market Surveillance Regulation
Notes
Decision on a general tariff application part A regarding the provision of system support services (SSS) from the regulated thermal generating units (Appendix E) that are subject to power purchase arrangements; Board decided that it had no jurisdiction and subsequently rescinds approval of Appendix E in Decision D2000-25 and D2000-34; obligation to ensure SSS development and implementation rests with the Transmission Administrator
No Board hearing
Approval
Approved
Less detail

Decision 2000-47

https://had.aer.ca/link/decision3243
Applicant
ESBI Alberta Ltd.
Application Number
2000186
1805-1
Title
Decision 2000-47: ESBI Alberta Ltd. IBOC contract approval
Date
2000
Title
Decision 2000-47: ESBI Alberta Ltd. IBOC contract approval
Date
2000
Applicant
ESBI Alberta Ltd.
Application Number
2000186
1805-1
Hearing Panel
McManus BT
Berg AJ
MacDonald NW
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Electric power rate
Electric power transmission
Rate (cost)
Decision U99024
Legal References
Electric Utilities Transmission Administrator Deficiency Correction Regulation
Notes
Decision on application by ESBI Alberta Ltd. (EAL) respecting three contracts pursuant to the Invitation to Bid on Credits process for 20-year location based credit entitlement agreements with PanCanadian Cavalier, TransCanada Carseland, and PanCanadian and Canadian Occidental Balzac
Approval
Approved
Less detail

Decision 2000-48

https://had.aer.ca/link/decision3244
Applicant
TransAlta Utilities Corporation
Application Number
2000134
file no. 1208-1
Title
Decision 2000-48: TransAlta Utilities Corporation DFO 2001 general tariff application part A interim decision; Farm transmission costs and unused investment credits (option B costs) for direct connect customers
Date
2000
Title
Decision 2000-48: TransAlta Utilities Corporation DFO 2001 general tariff application part A interim decision; Farm transmission costs and unused investment credits (option B costs) for direct connect customers
Date
2000
Applicant
TransAlta Utilities Corporation
Application Number
2000134
file no. 1208-1
Hearing Panel
MacDonald NW
Berg AJ
Lock RG
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Electric power transmission
Rate (cost)
Notes
Decision on application to include farm transmisison costs and "unused investment credits for direct connect customers" to be charged by TransAlta distribution to the Transmission Administrator
Approval
Approved
Less detail

Decision 2000-57

https://had.aer.ca/link/decision3280
Applicant
ESBI Alberta Ltd.
Application Number
2000135
Title
Decision 2000-57: ESBI Alberta Ltd. 2001 general tariff application, part B: interim tariff decision
Date
2000
Title
Decision 2000-57: ESBI Alberta Ltd. 2001 general tariff application, part B: interim tariff decision
Date
2000
Applicant
ESBI Alberta Ltd.
Application Number
2000135
Hearing Panel
MacDonald NW
Berg AJ
Lock RG
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Interim rate
Electric power rate
Electric power transmission
General rate application phase I
General rate application phase II
Terms and conditions
Decision D2000-37
Decision D2000-46
Notes
Decision on a interim general rate application and interim terms and conditions
No Board hearing
Approval
Approved
Less detail

Decision 2000-65

https://had.aer.ca/link/decision3291
Applicant
TransAlta Utilities Corporation
Application Number
2000132
file no. 1109-4
Title
Decision 2000-65: TransAlta Utilities Corporation 2001-2002 transmission facility owner tariff and negotiated settlement
Date
2000
Title
Decision 2000-65: TransAlta Utilities Corporation 2001-2002 transmission facility owner tariff and negotiated settlement
Date
2000
Applicant
TransAlta Utilities Corporation
Application Number
2000132
file no. 1109-4
Hearing Panel
MacDonald NW
Berg AJ
Lock RG
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Electric power transmission
Negotiated settlement
Transmission facility owner
Legal References
Electric Utilities Act S29
Electric Utilities Act S49
Electric Utilities Distribution Tariff Regulation S15
Notes
EUB application 2000132 and 2000279 by ATCO Electric Ltd. for transmission facility owner tarrif as agreed with customers through negotiated settlement process
Subject to Board directions of accounting for difference of actual and forecast depreciation rates in a deferral account, and to provide for audit services as per terms of settlement in this decision
Approval
Approved
Less detail

Decision 2000-70

https://had.aer.ca/link/decision3294
Applicant
ESBI Alberta Ltd.
Application Number
2000205
Title
Decision 2000-70: ESBI Alberta Ltd. duplication avoidance tariff application Nova Joffre industrial site
Date
2000
Title
Decision 2000-70: ESBI Alberta Ltd. duplication avoidance tariff application Nova Joffre industrial site
Date
2000
Applicant
ESBI Alberta Ltd.
Application Number
2000205
Hearing Panel
MacDonald NW
Berg AJ
Lock RG
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Duplication avoidance tariff
Electric power generation
Electric power transmission
Industrial plant
Power system interconnection
Legal References
Electric Utilities Act S49
Notes
EUB Decision D2000-70 on application 2000205 for a 40-year term commencing January 1, 2001 for a portion of the electric power generated and consumed at the Joffre industrial system site be exempted from tariff as per negotiated settlement with the Transmission Administator
Approval
Approved
Less detail

Decision 2000-76

https://had.aer.ca/link/decision3318
Applicant
ESBI Alberta Ltd.
Application Number
990005
Title
Decision 2000-76: ESBI Alberta Ltd. Part C : 1999/2000 phase I & II tariff application - location based credits - standing offer
Date
2000
Title
Decision 2000-76: ESBI Alberta Ltd. Part C : 1999/2000 phase I & II tariff application - location based credits - standing offer
Date
2000
Applicant
ESBI Alberta Ltd.
Application Number
990005
Hearing Panel
MacDonald NW
Berg AJ
Lock RG
Hearing Type
Utilities
Category
Electric power rate
Descriptors
Public utility
Electric power generation
Electric power transmission
Incentive
Regulation
Notes
Decision on tariff application refiling with respect to the degree of regulatory scrutiny required regarding electric generation and transmission administration
Approval
Deferred upon refiling
Less detail

Decision 2000-86

https://had.aer.ca/link/decision3303
Applicant
TransAlta Utilities Corporation
Application Number
RE95081
File no. 1204-5
Title
Decision 2000-86: TransAlta Utilities Corporation : 1996 Phase 11 - constitutional question
Date
2000
Title
Decision 2000-86: TransAlta Utilities Corporation : 1996 Phase 11 - constitutional question
Date
2000
Applicant
TransAlta Utilities Corporation
Application Number
RE95081
File no. 1204-5
Hearing Panel
McCrank MN
McManus BT
Bruni MJ
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Decision D2000-41
Decision U99035
Electric power transmission
Electric utility
General tariff application
Transmission line
Legal References
Electric Utilities Act
Judicature Act S25
Public Utilities Board Act
Notes
Decision on application for approval of Rate 9100 (Shared Use of Overhead Facilities) in the context of its 1996 GTA (General Tariff Application) because it has been unable to agree on a rate with cable operators and Telus with whom TransAlta shares transmission facilities.
Interveners
Telus Communications Inc.
Shaw Communications Inc.
Approval
Approved
Less detail

Decision 2001-05

https://had.aer.ca/link/decision3324
Applicant
EPCOR Transmission Inc.
Application Number
2000133
2000302
file no. 1704-1
file no. 1704-2
Title
Decision 2001-05: EPCOR Transmission Inc.2001-2002 transmission facility owner tariff and negotiated settlement
Date
2001
Title
Decision 2001-05: EPCOR Transmission Inc.2001-2002 transmission facility owner tariff and negotiated settlement
Date
2001
Applicant
EPCOR Transmission Inc.
Application Number
2000133
2000302
file no. 1704-1
file no. 1704-2
Hearing Panel
MacDonald NW
Berg AJ
Lock RG
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Electric power transmission
Negotiated settlement
Transmission facility owner
Legal References
Electric Utilities Act S29
Electric Utilities Act S49
Electric Utilities Distribution Tariff Regulation S15
Notes
EUB application 2000133 and 2000302 by ATCO Electric Ltd. for transmission facility owner tarrif as agreed with customers through negotiated settlement process
Subject to Board directions to provide for audit services as per terms of settlement in this decision
Approval
Approved
Less detail

Decision 2001-13

https://had.aer.ca/link/decision3338
Applicant
ESBI Alberta Ltd.
Application Number
990005
file no. 1803-6
Title
Decision 2000-13: ESBI Alberta Ltd. Part D : Location based credits - standing offer - first refiling pursuant to Decision 2000-76
Date
2001
Title
Decision 2000-13: ESBI Alberta Ltd. Part D : Location based credits - standing offer - first refiling pursuant to Decision 2000-76
Date
2001
Applicant
ESBI Alberta Ltd.
Application Number
990005
file no. 1803-6
Hearing Panel
MacDonald NW
Berg AJ
Lock RG
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Public utility
Electric power generation
Electric power transmission
Incentive
Regulation
Notes
Decision on refiling of Location Based Credits Standing Offer process to provide incentive for generation of electric power and to determine the degree of regulatory scrutiny required regarding electric generation and transmission administration
Approval
Deferred upon refiling
Less detail

62 records – page 1 of 4.