Decision 73-14
https://had.aer.ca/link/decision2197
- Applicant
- Imperial Oil Limited
- Application Number
- 6823
- Title
- Decision on application by Imperial Oil Limited, 1973 (increase in the maximum permitted hydrogen sulphide inlet rate at the Golden Spike gas processing plant)
- Date
- 1973
- Title
- Decision on application by Imperial Oil Limited, 1973 (increase in the maximum permitted hydrogen sulphide inlet rate at the Golden Spike gas processing plant)
- Date
- 1973
- Applicant
- Imperial Oil Limited
- Application Number
- 6823
- Hearing Panel
- Govier GW
- Craig DR
- DeSorcy GJ
- Hearing Type
- Board
- Category
- Gas processing
- Notes
- Decision 73-14 and addendum on application No. 6823 to amend approval No. 1531 to authorize increase in maximum hydrogen sulphide inlet rate and maximum permitted sulphur dioxide emission rate at Golden Spike gas processing plant; approval No. 1531D
- Interveners
- Goebel, I.
- Adolph, J.
- McDonald, M.
- Sinclair, K.V.
- Sinclair, R.
- Miller, A.K.
- Unifarm
- Hage, K.D.
- Ironside, R.G.
- Wilson, D.J.
- Jappsen, W.
- Secord, R.
- Michna, F.W.
- Morin, R.D.
- Vanthoff, J.
- Howell, L.
- Boje, J.