Decision 80-14|80-14 Addendum
https://had.aer.ca/link/decision2025
- Applicant
- Edmonton Power
- Application Number
- 800049
- Title
- Decision on application by Edmonton Power, 1980 (240 KV transmission line Jasper terminal-north Calder) (and addendum)
- Date
- 1980
- Title
- Decision on application by Edmonton Power, 1980 (240 KV transmission line Jasper terminal-north Calder) (and addendum)
- Date
- 1980
- Applicant
- Edmonton Power
- Application Number
- 800049
- Hearing Panel
- Berkowitz N
- Goodman CJ
- Bray JA
- Hearing Type
- Board
- Utilities
- Category
- Transmission line
- Descriptors
- Edmonton area
- Transmission line
- Reliability
- Right of way
- Route selection
- Transmission corridor
- Legal References
- Hydro and Electric Energy Act
- Notes
- Decision and addendum on application to construct and operate a 240 KV transmission line designated as EP 930L from Edmonton Power's Jasper terminal to Calgary Power's north Calder substation (TP.53, R.25, W4M)
- Interveners
- Duke, M.