Decision E59-(p.056)
https://had.aer.ca/link/decision536
- Applicant
- Malmo Engineering Committee
- Title
- Examiners report on application by Malmo Engineering Committee, 1959 (amend the water-oil ratio penalty formula as applied to the production allowables in the Malmo Blairmore and D-2 pools to include the water drive index (WDI) fraction)
- Date
- 1959
- Title
- Examiners report on application by Malmo Engineering Committee, 1959 (amend the water-oil ratio penalty formula as applied to the production allowables in the Malmo Blairmore and D-2 pools to include the water drive index (WDI) fraction)
- Date
- 1959
- Applicant
- Malmo Engineering Committee
- Hearing Panel
- Craig DR
- Manyluk AF
- Hearing Type
- Examiners
- Category
- Water disposal
- Descriptors
- Malmo field
- Water oil ratio
- WOR penalty
- Blairmore Fm
- Allowable production
- Enhanced recovery scheme
- Water disposal
- Notes
- Examiners concluded that the proposed amendments may enhance recovery and recommended several things to accompany the changes