Decision 87-14|87-14 Addendum
https://had.aer.ca/link/decision201
- Applicant
- Alberta Power Limited
- Application Number
- 870308
- Title
- Decision on application by Alberta Power Ltd., 1987 (Alberta- Saskatchewan interconnection Empress area) (and addendum)
- Date
- 1987
- Title
- Decision on application by Alberta Power Ltd., 1987 (Alberta- Saskatchewan interconnection Empress area) (and addendum)
- Date
- 1987
- Applicant
- Alberta Power Limited
- Application Number
- 870308
- Hearing Panel
- Goodman CJ
- Mink FJ
- Prince JP
- Hearing Type
- Board
- Utilities
- Category
- Transmission line
- Descriptors
- Empress area
- Power system interconnection
- Transmission line
- Alberta
- Benefit cost analysis
- Electric power demand
- Forecasting
- NTS 72L
- Saskatchewan
- Legal References
- Hydro and Electric Energy Act S12
- Hydro and Electric Energy Act S13
- Hydro and Electric Energy Act S14
- Hydro and Electric Energy Act S15
- Hydro and Electric Energy Act S16
- Hydro and Electric Energy Act S17
- Notes
- Decision D87-14 on application No. 870308 to construct and operate a DC back-to-back converter station near Empress AB, to be called McNeill DC converter station 840S; to construct and operate a 138-KV single circuit transmission line, 830L, from the existing Dome Empress substation 163S to the McNeill station; to construct and operate a 230-KV single circuit transmission line, S1M from the McNeill station to the Alberta-Saskatchewan border; to connect the 138-KV line and McNeill station to TAU Empress substation; to interconnect the 230-KV line and McNeill station with the electric system of Saskatchewan power; to make alterations to the Dome Empress substation 163S and transmission line 760L; addendum dated 1987-11-20 approving the amendment for the construction and operation of a 150 -MW interconnection and the 230-KV line route between the McNeill station and the border
- Interveners
- Industrial Power Consumers Association of Alberta
- TransAlta Utilities Planning Council