63 records – page 1 of 4.

Decision 2000-55

https://had.aer.ca/link/decision3246
Applicant
ATCO Electric Limited
Application Number
2000136
file no. 1109-2
Title
Decision 2000-55: ATCO Electric Ltd. 2001-2002 distribution tariff application : Part A: Interim distribution tariff decision
Date
2000
Title
Decision 2000-55: ATCO Electric Ltd. 2001-2002 distribution tariff application : Part A: Interim distribution tariff decision
Date
2000
Applicant
ATCO Electric Limited
Application Number
2000136
file no. 1109-2
Hearing Panel
MacDonald NW
Berg AJ
Lock RG
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Electric power distribution
Terms and conditions
Rate (cost)
Approval
Approved
Less detail

Decision 2000-56

https://had.aer.ca/link/decision3247
Applicant
Transalta Utilities Corporation
Application Number
2000137
file no. 1208-2
Title
Decision 2000-56: Transalta Utilities Corporation distribution tariff application : Part A: Interim distribution tariff decision
Date
2000
Title
Decision 2000-56: Transalta Utilities Corporation distribution tariff application : Part A: Interim distribution tariff decision
Date
2000
Applicant
Transalta Utilities Corporation
Application Number
2000137
file no. 1208-2
Hearing Panel
MacDonald NW
Berg AJ
Lock RG
Hearing Type
Board
Utilities
Descriptors
Electric power distribution
Rate (cost)
Terms and conditions
Approval
Approved
Less detail

Decision 2000-57

https://had.aer.ca/link/decision3280
Applicant
ESBI Alberta Ltd.
Application Number
2000135
Title
Decision 2000-57: ESBI Alberta Ltd. 2001 general tariff application, part B: interim tariff decision
Date
2000
Title
Decision 2000-57: ESBI Alberta Ltd. 2001 general tariff application, part B: interim tariff decision
Date
2000
Applicant
ESBI Alberta Ltd.
Application Number
2000135
Hearing Panel
MacDonald NW
Berg AJ
Lock RG
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Interim rate
Electric power rate
Electric power transmission
General rate application phase I
General rate application phase II
Terms and conditions
Decision D2000-37
Decision D2000-46
Notes
Decision on a interim general rate application and interim terms and conditions
No Board hearing
Approval
Approved
Less detail

Decision 2000-85

https://had.aer.ca/link/decision3311
Applicant
Northwestern Utilities Limited
ATCO Gas North
Application Number
200085
file no. 1505-3
Title
Decision 2000-85 : Northwestern Utilities Limited approval of rates, tolls, charges, and terms and conditions of service for core customers and approval of amendments to the North Core Agreement
Date
2000
Title
Decision 2000-85 : Northwestern Utilities Limited approval of rates, tolls, charges, and terms and conditions of service for core customers and approval of amendments to the North Core Agreement
Date
2000
Applicant
Northwestern Utilities Limited
ATCO Gas North
Application Number
200085
file no. 1505-3
Hearing Panel
McManus BT
Miller GJ
Heggie RD
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Decision U98060
Distribution tariff
General rate application
General tariff application
Electric power rate
Negotiated settlement
Operating condition
Return on investment
Revenue requirement method
Terms and conditions
Services
Legal References
Gas Utilities Act S36
Notes
EUB decision D2000-85 on application by Northwestern for approval of rates, tolls, charges, and terms and conditions of service affecting residential, commercial and small industrial customers (Core customers) for the years 2001 and 2002. The application was the result of a negotiated settlement initiated by NUL and the North Core Committee to address a Re-opener to the initial agreement.
Approval
Approved
Less detail

Decision 2000-87

https://had.aer.ca/link/decision3322
Applicant
ESBI Alberta Ltd.
Application Number
2000135
file no. 1804-1
Title
Decision 2000-87: ESBI Alberta Ltd. 2001 general rate application : Part C - terms and conditions of service - emergency provision of system support services - article 24
Date
2000
Title
Decision 2000-87: ESBI Alberta Ltd. 2001 general rate application : Part C - terms and conditions of service - emergency provision of system support services - article 24
Date
2000
Applicant
ESBI Alberta Ltd.
Application Number
2000135
file no. 1804-1
Hearing Panel
Berg AJ
MacDonald NW
Lock RG
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
General rate application
Terms and conditions
Decision D2000-46
Notes
EUB Decision 2000-87 on application by ESBI Alberta Ltd. seeking approval for an amendment to the terms and conditions to provider system support services during an emergency; Board approval of an interim refundable basis until all evidence and submissions can be fully reviewed
Approval
Deferred
Less detail

Decision 2001-04

https://had.aer.ca/link/decision3312
Applicant
TransAlta Utilities Corporation
ATCO Electric Limited
EPCOR Transmission Inc.
Application Number
2000134
2000266
file no. 1208-4
file no. 1208-1
Title
Decision 2001-04 : TransAlta Utilities Corporation 2001 transmission facility owner tariff and negotiated settlement
Date
2001
Title
Decision 2001-04 : TransAlta Utilities Corporation 2001 transmission facility owner tariff and negotiated settlement
Date
2001
Applicant
TransAlta Utilities Corporation
ATCO Electric Limited
EPCOR Transmission Inc.
Application Number
2000134
2000266
file no. 1208-4
file no. 1208-1
Hearing Panel
MacDonald NW
Berg AJ
Lock RG
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Administration fee
Electric power rate
General tariff application
Negotiated settlement
Payout
Rate of return
Return on investment
Services
Terms and conditions
Transmission facility owner
Legal References
Electric Utilities Distribution Tariff Regulation S15
Electric Utilities Act S29
Electric Utilities Act S49
Notes
EUB Decision on the application by ATCO, EPCOR and TranAlta requesting Board approval of Transmission Facility Owners Tariffs each of which sets out the charges the TFO seeks to recover from the Transmission Administration and the Terms and Conditions of Service .
Interveners
Dalgleish TD
Finley S
Taylor W
Way R
Millar N
Thorn S
Keough LG
Munro SM
Young S
Liteplo J
Wright DR
British Columbia Power and Hydro Authority
Low CA
Bomhof KJ
Industrial Power Consumers & Cogenerators Association
Crowther DE
City of Calgary
Brander RB
Quinton-Campbell P
MacNamara D
Johnson H
Matwichuk G
Carruthers N
Alberta Federation of REAs Ltd.
Sisson KL
Alberta Association of Municipal Districts and Counties
Burgess LJ
Conditions
The Board will refrain from making an Order approving a tariff effective July 1, 2001 until the depreciation expense component of the revenue requirement is finalized pursuant to Clause 9 of the Settlement.
Less detail

Decision 2001-06

https://had.aer.ca/link/decision3323
Applicant
ESBI Alberta Ltd.
Application Number
2000135
file no. 1804-1
Title
Decision 2001-06: ESBI Alberta Ltd. 2001 general rate application part D : Customer contribution policy
Date
2001
Title
Decision 2001-06: ESBI Alberta Ltd. 2001 general rate application part D : Customer contribution policy
Date
2001
Applicant
ESBI Alberta Ltd.
Application Number
2000135
file no. 1804-1
Hearing Panel
Berg AJ
MacDonald NW
Lock RG
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
General rate application
Terms and conditions
Decision D2000-46
Notes
EUB Decision 2000-87 on application by ESBI Alberta Ltd. seeking approval for an amendment to the terms and conditions to provider system support services during an emergency; Board approval of an interim refundable basis until all evidence and submissions can be fully reviewed
Approval
Deferred
Less detail

Decision 2001-14

https://had.aer.ca/link/decision3339
Applicant
ATCO Electric Limited
Application Number
2000136
file no. 1109-2
Title
Decision 2001-14: ATCO Electric Ltd. 2001-2002 distribution tariff application : Part B : Phase I distribution tariff revenue requirement
Date
2001
Title
Decision 2001-14: ATCO Electric Ltd. 2001-2002 distribution tariff application : Part B : Phase I distribution tariff revenue requirement
Date
2001
Applicant
ATCO Electric Limited
Application Number
2000136
file no. 1109-2
Hearing Panel
MacDonald NW
Berg AJ
Lock RG
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Electric power distribution
Terms and conditions
Interim rate
Negotiated settlement
Decision D2000-85
Rate (cost)
Regulation
Approval
Approved
Less detail

Decision 2001-15

https://had.aer.ca/link/decision3340
Applicant
ESBI Alberta Ltd.
Application Number
2000135
file no. 1804-1-1
Title
Decision 2001-15: ESBI Alberta Ltd. 2001 general rate application : Part E - terms and conditions of service - emergency provision of system support services - article 24
Date
2001
Title
Decision 2001-15: ESBI Alberta Ltd. 2001 general rate application : Part E - terms and conditions of service - emergency provision of system support services - article 24
Date
2001
Applicant
ESBI Alberta Ltd.
Application Number
2000135
file no. 1804-1-1
Hearing Panel
Berg AJ
MacDonald NW
Lock RG
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
General rate application
Terms and conditions
Decision D2000-46
Decision D2000-86
Notes
EUB Decision 2000-87 on application by ESBI Alberta Ltd. seeking approval for an amendment to the terms and conditions to provider system support services during an emergency
Printed decision mislabeled as Part C and should be Part E
Approval
Deferred
Less detail

Decision 2001-25

https://had.aer.ca/link/decision3349
Applicant
ESBI Alberta Ltd.
Application Number
2000135
file no. 1804-1
Title
Decision 2001-25: ESBI Alberta Ltd. 2001 general rate application part G : refiling customer contribution policy
Date
2001
Title
Decision 2001-25: ESBI Alberta Ltd. 2001 general rate application part G : refiling customer contribution policy
Date
2001
Applicant
ESBI Alberta Ltd.
Application Number
2000135
file no. 1804-1
Hearing Panel
Berg AJ
MacDonald NW
Lock RG
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
General rate application
Terms and conditions
Decision D2001-06
Notes
EUB Decision 2001-25 on application by ESBI Alberta Ltd. seeking approval for the terms and conditions refiled pursuant to Decision 2001-06
Approval
Deferred
Less detail

Decision 2001-28

https://had.aer.ca/link/decision3352
Applicant
TransAlta Utilities Corporation
Application Number
2000134
2000266
file no. 1208-4
file no. 1208-1
Title
Decision 2001-28 : TransAlta Utilities Corporation 2001 transmission facility owner tariff application : terms and conditions of service and code of conduct
Date
2001
Title
Decision 2001-28 : TransAlta Utilities Corporation 2001 transmission facility owner tariff application : terms and conditions of service and code of conduct
Date
2001
Applicant
TransAlta Utilities Corporation
Application Number
2000134
2000266
file no. 1208-4
file no. 1208-1
Hearing Panel
MacDonald NW
Berg AJ
Lock RG
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Code of conduct
Electric power rate
General tariff application
Investment
Negotiated settlement
Terms and conditions
Transmission facility owner
Regulation
Public utility
Deregulation
Legal References
Electric Utilities Code of Conduct Regulation
Notes
EUB Decision on the application by ATCO, EPCOR and TranAlta requesting Board approval of Transmission Facility Owners Tariffs each of which sets out the charges the TFO seeks to recover from the Transmission Administration and the Terms and Conditions of Service .
Interveners
Dalgleish TD
Finley S
Taylor W
Way R
Millar N
Thorn S
Keough LG
Munro SM
Young S
Liteplo J
Wright DR
British Columbia Power and Hydro Authority
Low CA
Bomhof KJ
Industrial Power Consumers & Cogenerators Association
Crowther DE
City of Calgary
Brander RB
Quinton-Campbell P
MacNamara D
Johnson H
Matwichuk G
Carruthers N
Alberta Federation of REAs Ltd.
Sisson KL
Alberta Association of Municipal Districts and Counties
Burgess LJ
Conditions
The Board will refrain from making an Order approving a tariff effective July 1, 2001 until the depreciation expense component of the revenue requirement is finalized pursuant to Clause 9 of the Settlement.
Less detail

Decision 2001-29

https://had.aer.ca/link/decision3353
Applicant
EPCOR Transmission Inc.
Application Number
2000133
2000302
file no. 1704-1
file no. 1704-2
Title
Decision 2001-29 : EPCOR Transmission Inc. 2001-2001 transmission facility owner tariff application : terms and conditions of service
Date
2001
Title
Decision 2001-29 : EPCOR Transmission Inc. 2001-2001 transmission facility owner tariff application : terms and conditions of service
Date
2001
Applicant
EPCOR Transmission Inc.
Application Number
2000133
2000302
file no. 1704-1
file no. 1704-2
Hearing Panel
MacDonald NW
Berg AJ
Lock RG
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Electric power rate
General tariff application
Investment
Negotiated settlement
Terms and conditions
Transmission facility owner
Regulation
Public utility
Deregulation
Legal References
Electric Utilities Act S54
Notes
EUB Decision on the application by ATCO, EPCOR and TranAlta requesting Board approval of Transmission Facility Owners Tariffs each of which sets out the charges the TFO seeks to recover from the Transmission Administration and the Terms and Conditions of Service .
Less detail

Decision 2001-32

https://had.aer.ca/link/decision3358
Applicant
ESBI Alberta Ltd.
Application Number
200135
Title
Decision 2001-32 : ESBI Alberta Ltd. 2001 general rate application Part H : phase II matters
Date
2001
Title
Decision 2001-32 : ESBI Alberta Ltd. 2001 general rate application Part H : phase II matters
Date
2001
Applicant
ESBI Alberta Ltd.
Application Number
200135
Hearing Panel
MacDonald NW
Berg AJ
Lock RG
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Public utility
Electric power rate
Electric power transmission
Rate (cost)
General rate application
Price regulation
Terms and conditions
Legal References
Electric Utilities Act S49
Electric Utilities Act S27
Notes
Decision on application respecting a general tariff application for the 2001 test year requesting approval of a rate design and a revised customer contribution policy (phase 2)
Decision does not include discussion on power purchase arrangement aiisues (PPAs)
Approval
Deferred upon refiling
Less detail

Decision 2001-37

https://had.aer.ca/link/decision3367
Applicant
Utilicorp Network Canada (Alberta) Ltd.
Application Number
2000258
file no. 1900-3
Title
Decision 2001-37 : Utilicorp Network Canada (Alberta) Ltd. 2001 distribution tariff application, Part B : Phase I distribution tariff revenue requirement, Phase II rate design and terms and conditions of service
Date
2001
Title
Decision 2001-37 : Utilicorp Network Canada (Alberta) Ltd. 2001 distribution tariff application, Part B : Phase I distribution tariff revenue requirement, Phase II rate design and terms and conditions of service
Date
2001
Applicant
Utilicorp Network Canada (Alberta) Ltd.
Application Number
2000258
file no. 1900-3
Hearing Panel
MacDonald NW
Berg AJ
Lock RG
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Distribution tariff
Electric power rate
Electric power transmission
General rate application phase I
Negotiated settlement
Tariff
Terms and conditions
Legal References
Electric Utilities Act
Electric Utilities Distribution Tariff Regulation S6
Notes
Decision on application for a Distribution Tariff to take effect in the UNCA's service territory effective January 1, 2001. Approval of refiled rates and terms and conditions of service as proposed in the settlement.
Interveners
ATCO Electric Limited
Consumers Coalition of Alberta
Alberta Urban Municipalities Association
Public Institutional Consumers of Alberta
Enron Canada Corp.
Independent Powers Producers Society of Alberta
Senior Power Producers Association
Alberta Federation of REAs Ltd.
Alberta Association of Municipal Districts and Counties
Alberta Irrigation Projects Association
Aboriginal Communities (First Nations)
Approval
Approved
Less detail

Decision 2001-49

https://had.aer.ca/link/decision3381
Applicant
ESBI Alberta Ltd.
Application Number
2000135
File no. 1804-1
Title
Decision 2001-49: ESBI Alberta Ltd. 2001 general tariff application, part K: final rates and tariffs and second refiling
Date
2001
Title
Decision 2001-49: ESBI Alberta Ltd. 2001 general tariff application, part K: final rates and tariffs and second refiling
Date
2001
Applicant
ESBI Alberta Ltd.
Application Number
2000135
File no. 1804-1
Hearing Panel
MacDonald NW
Berg AJ
Lock RG
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Decision D2000-37
Decision D2000-46
Decision D2000-57
Decision D2000-87
Decision D2001-06
Decision D2001-15
Decision D2001-21
Decision D2001-25
Decision D2001-32
Decision D2001-40
Decision D2001-41
Electric power rate
General rate application phase I
General rate application phase II
Revenue requirement method
Terms and conditions
Legal References
Electric Utilities Act S27
Electric Utilities Act S49
Notes
EUB Decision D2001-49 on application by EAL re revenue requirement, refiled tariffs and final rate schedules as well as refiled terms and conditions of service.
Approval
Approved
Less detail

Decision 2001-50

https://had.aer.ca/link/decision3369
Applicant
ATCO Electric Limited
Application Number
2000136
file no. 1109-2
Title
Decision 2001-50 : ATCO Electric Ltd. 2001-2002 general tariff application : Part D : Approval of final distribution tariff and refiling
Date
2001
Title
Decision 2001-50 : ATCO Electric Ltd. 2001-2002 general tariff application : Part D : Approval of final distribution tariff and refiling
Date
2001
Applicant
ATCO Electric Limited
Application Number
2000136
file no. 1109-2
Hearing Panel
MacDonald NW
Berg AJ
Lock RG
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Distribution tariff
Electric power distribution
Electric power rate
Revenue requirement method
Terms and conditions
Legal References
Electric Utilities Act S31
Electric Utilities Act S49
Electric Utilities Act S51
Electric Utilities Act S54
Electric Utilities Distribution Tariff Regulation S6
Notes
EUB's decision on application by ATCO requesting approval of an interim Distribution Tariff to take effect in AE's service territory Jan.1, 2001 and a final DT to take effect July 1, 2001
Approval
Approved
Less detail

Decision 2001-69

https://had.aer.ca/link/decision3396
Applicant
ESBI Alberta Ltd.
Application Number
2000135
File No. 1804-1
Title
Decision 2001-69 : ESBI Alberta Ltd. 2001 general rate application Part L : third refiling - stretch objective and tariff related issues
Date
2001
Title
Decision 2001-69 : ESBI Alberta Ltd. 2001 general rate application Part L : third refiling - stretch objective and tariff related issues
Date
2001
Applicant
ESBI Alberta Ltd.
Application Number
2000135
File No. 1804-1
Hearing Panel
MacDonald NW
Berg AJ
Lock RG
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Public utility
Electric power rate
Electric power transmission
Rate (cost)
General rate application
Price regulation
Terms and conditions
Legal References
Electric Utilities Act S49
Electric Utilities Act S27
Notes
Decision on application respecting a general tariff application for the 2001 test year requesting approval of a rate design and a revised customer contribution policy (phase 2)
Decision does not include discussion on power purchase arrangement aiisues (PPAs)
Approval
Approved
Less detail

Decision 2002-48

https://had.aer.ca/link/decision3508
Applicant
ESBI Alberta Ltd.
Application Number
2000135
file no. 1804-1-2
Title
Decision 2002-48: ESBI Alberta Ltd. 2001 general tariff application, part M: PPA module
Date
2002
Title
Decision 2002-48: ESBI Alberta Ltd. 2001 general tariff application, part M: PPA module
Date
2002
Applicant
ESBI Alberta Ltd.
Application Number
2000135
file no. 1804-1-2
Hearing Panel
MacDonald NW
Berg AJ
Lock RG
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Cost of service
Distribution tariff
Electric power rate
Electric power transmission
General rate application
Ownership
Revenue requirement method
Terms and conditions
Transmission administrator tariff
Legal References
Electric Utilities Act S27
Electric Utilities Act S49
Notes
EUB's decision on an application by ESBI for approval of its Transmission administrator tariff for the 2001 test year and for approval of a revenue requirement and a rate design, including a revised customer contribution policy for the same period. This decision deals specifically with the power purchase agreement (PPA) module. Rates and T&C set out in Appendix 1 of the decision are final and effective as of January 1, 2001 subject only to changes that may arise from the Article 24 Module.
Interveners
Alberta Association of Municipal Districts and Counties
Alberta Cogenerators Council
Alberta Federation of REAs Ltd.
Alberta Irrigation Projects Association
Alberta Urban Municipalities Association
ATCO Power
Buyers Coalition
Balancing Pool
Engage Energy
Canada L.P.
ENMAX Energy Corporation
ASTC Power Partnership
TransCanada Energy Ltd.
Buyers Group
Encore Energy
Dow Chemical Canada Inc.
Millar Western Forest Products Limited
Slave Lake Pulp Partnership
ANC Power Company
Consumer's Coalition of Alberta
EPCOR Generation Inc.
Public Institutional Consumers of Alberta
TransAlta Utilities
Burgess LJ
Secord RC
Sisson KL
Unryn JH
McCreary CR
Lowe JEE
Crozier T
Post V
Luco I
Forster MS
Miller K
Manning LL
Heath D
Kostesky V
Willis K
Johannson K
Levson D
McLarty AL
Morisset VK
Mikkelsen R
Wachowich JA
Wrght D
Liteplo M
Topping D
Wagner G
Approval
Approved
Less detail

Decision 2002-69

https://had.aer.ca/link/decision3531
Applicant
ATCO Electric Limited
ATCO Gas and Pipelines Limited
Northwestern Utilities Limited
ATCO Gas North
Application Number
1237673
2000233 previously
2000234 previously
Title
Decision 2002-69: ATCO Group affiliate transactions and code of conduct proceeding A: Asset transfer, outsourcing arrangements, and GRA issues
Date
2002
Title
Decision 2002-69: ATCO Group affiliate transactions and code of conduct proceeding A: Asset transfer, outsourcing arrangements, and GRA issues
Date
2002
Applicant
ATCO Electric Limited
ATCO Gas and Pipelines Limited
Northwestern Utilities Limited
ATCO Gas North
Application Number
1237673
2000233 previously
2000234 previously
Hearing Panel
McManus BT
Berg AJ
Bruni MJ
Hearing Type
Utilities
Category
Interveners costs
Common processor
Electric power rate
Gas rate
Descriptors
Code of conduct
Distribution tariff
Gas rate
General rate application
Rate of return
Regulated rate option
Revenue requirement method
Services
Terms and conditions
Transmission facility owner
Management fee
Legal References
Electric Utilities Code of Conduct Regulation
Notes
ATCO Group of companies filed in July 2002 two applications for requesting that the Board rule on relationships and transactions between regulated and non-regulated affiliates within the ATCO Group and on the company's requested approval of the inclusion of revenues and costs arising from those transactions in its revenue requirements, as well approval of the costs arising from affiliate transactions in the revenue requirement requested in its Regulated Rate Option Tariff..
Interveners
Aboriginal Communities
Alberta Association of Municipal Districts and Counties
Alberta Federation of REAs Ltd.
Alberta Irrigation Projects Association
Alberta Urban Municipalities Association and Municipal Intervenors
Canadian Association of Petroleum Producers
Canadian Forest Products Limited
City of Calgary
City of Edmonton
Consumers Coalition of Alberta
ENMAX Energy Corporation
ENMAX Power Corporation
Enron Canada Corp.
EPCOR Energy Services (Alberta) Inc.
Federation of Alberta Gas Co-ops Ltd and Gas Alberta Ltd.
Independent Powe Producers Society of Alberta
Industrial Power Consumers and Co-generators Association of Alberta
Public Institutional Consumers of Alberta
Senior Petroleum Producers Association
Brander RB
Bryan JA
Bruggeman RL
Burgess B
Corrigan DJ
Crowther D
Cusano LA
Follett W
Graves J
Horte JT
Huber H
Johnson HW
Kennedy LE
Liddle RT
Liteplo J
Macnamara D
MacWilliam AG
Manning L
Marriott TD
Marx R
McKenzie NJ
Newcombe G
Quinton-Campbell PL
Sherk M
Sisson KL
Stephens J
Unryn JH
Vander Veen HJ
Vander Veen T
Wachowich JA
Wood D
Approval
Approved
Conditions
The transfer of computer asset to I-Tek is approved provided the Applicants adjust the transfer price as directed by the Board. If the applicants do not, the transaction is considered void pursuant to section 26 of the PUB Act.
The Applicants shall submit a Compliance Filing before Sept. 2, 2002
This filing shall include all supporting info necessary for the Board to make its final determination respecting the 2001 and 2002 GRA amounts.
Less detail

Decision 2002-79

https://had.aer.ca/link/decision3539
Applicant
ATCO Electric Limited
Application Number
1252145
file no. 1109-10
Title
Decision 2002-79: ATCO Electric Ltd. Application to adjust 2001/2002 transmission and distribution revenue requirements for changes in the booked deferred income taxes
Date
2002
Title
Decision 2002-79: ATCO Electric Ltd. Application to adjust 2001/2002 transmission and distribution revenue requirements for changes in the booked deferred income taxes
Date
2002
Applicant
ATCO Electric Limited
Application Number
1252145
file no. 1109-10
Hearing Panel
Berg AJ
Miller GJ
Douglas JI
Hearing Type
Utilities
Category
Electric power rate
Descriptors
Electric power distribution
Terms and conditions
Interim rate
Negotiated settlement
Decision D2000-54
Rate (cost)
Regulation
Less detail

63 records – page 1 of 4.