Narrow Results By
Decision 79-AA
https://had.aer.ca/link/decision2391
- Applicant
- Alberta. Dept. of the Environment
- Alberta Power Limited
- Forestburg Collieries Limited
- Manalta Coal Ltd.
- Edmonton Power
- Application Number
- 9759
- 770364
- 780041
- 780024
- Title
- Decision on application by Alberta Power Ltd., Forestburg Collieries Limited and Manalta Coal Ltd., 1979 (Sheerness mine and the construction and operation of proposed Sheerness thermal power plant) and on application by Edmonton Power Ltd., 1979 (Genesee thermal power plant and Genesee mine)
- Date
- 1979
- Title
- Decision on application by Alberta Power Ltd., Forestburg Collieries Limited and Manalta Coal Ltd., 1979 (Sheerness mine and the construction and operation of proposed Sheerness thermal power plant) and on application by Edmonton Power Ltd., 1979 (Genesee thermal power plant and Genesee mine)
- Date
- 1979
- Applicant
- Alberta. Dept. of the Environment
- Alberta Power Limited
- Forestburg Collieries Limited
- Manalta Coal Ltd.
- Edmonton Power
- Application Number
- 9759
- 770364
- 780041
- 780024
- Hearing Panel
- Berkowitz N
- DeSorcy GJ
- Goodman CJ
- Thiessen HW
- Hearing Type
- Board
- Utilities
- Category
- Coal
- Descriptors
- Coal mine
- Coal project
- Electric power project
- Genesee mine
- Genesee power plant
- Roselyn mine
- Sheerness mine
- Sheerness power plant
- Thermal power plant
- Alberta
- Benefit cost analysis
- Capacity
- Coal - fuel
- Comparison
- Cooling system
- Cost analysis
- Electric power demand
- Environmental impact
- Locating
- Mine design
- NTS 72M
- NTS 83G
- Planning
- Plant design
- Socio-economic effect
- Legal References
- Coal Conservation Act S10
- Coal Conservation Act S21
- Hydro and Electric Energy Act S7
- Hydro and Electric Energy Act S14
- Notes
- ERCB Report 79-AA (with separate addendum) on application No. 9759 by Alberta Power for plant near Sheerness and connection to its electric system, application No. 770364 by Forestburg to develop a mine site near Sheerness to supply proposed Power Plant, application No, 780041 by Manalta to extend Roselyn mine (Mine No. 443) at Sheerness to supply part of coal for proposed Sheerness power plant (Sheerness in TP.24-31, R.11-16, W4M) and on application No. 780024 by Edmonton Power thermal power plant at Genesee and mine site at Genesee to supply coal to fuel the plant (TP.48-51, R.1-4, W5M); See also ERCB Report 82-C for decision on later application by Edmonton Power to advance the commissioning dates for Genesee plant; Board hearing on Sheerness 1978-05-16/17/18/19; Board hearing on Genesee 1978-07-25/26/27/28 & 1978-08-02/03/04
- Interveners
- Alberta Power Limited
- McDermid, N
- Provost, K
- Frey, JR
- Leahy, DM
- Griffing, TC
- Kolisnyk, Z
- Manalta Coal Ltd.
- Forsyth, GR
- McKinnon, S
- Chapel, GD
- Shaneman, M
- Portigal, L
- Eeglon, T
- Morgan, JR
- Forestburg Collieries Limited
- Parr, R
- Morris, JE
- Engler, RF
- Robbins, GH
- Haddock, JK
- Bowman, PM
- McAllister, RE
- Electric Utilities Planning Council (EUPC)
- Ferguson, T
- Chorel, MJ
- Reed, WA
- Beckett, WJ
- Fleury, D
- Shinyei, F
- Hosie, W
- Desarkar, A
- Calgary Power Ltd.
- Sabey, DO
- Kay, HM
- Fraser, WL
- Barry, EJ
- Scheaffer, HG
- Crowe, TW
- Friend, A
- Williams, MM
- City of Edmonton
- Smith, P
- Kyte, EF
- Department of Municipal Affairs Special Areas Board
- Duff, AR
- Unifarm Region Eleven
- Gordon, H
- Williams, CK
- Price, RH
- Anderson, D
- Brown, V
- Cambell, C
- Hutton, LC
- Bull Pound Breeders' Co-operative Ltd.
- Lenfesty, Ma
- McEwen, MO
- Hartzler, C
- T.G. Cattle Company Limited
- Gateman, J
- Cattle, TG
- Department of Environment staff
- Defir, J
- Harrington, DG
- Lupul, S
- Deagle, C
- Edmonton Power
- Patterson, M
- Pettican, A
- Sadesky, A
- Keller, A
- Warren, K
- Pelletier, D
- Prostebby, J
- Clark, D
- De, M
- Visman, J
- Gilchrist, G
- Majury, A
- Stutz, C
- Croft, B
- Lamb, A
- Gill, D
- Stewart, R
- MacDougall, T
- Dusel, F
- Brocke, L
- Reeves, B
- Warburg and District Chamber of Commerce
- Siega, L
- Village of Warburg
- Zotzman, E
- Town of Drayton Valley
- Welsh, MC
- McKay, A
- McKay, R
- Osbak, E
- Save-Tomorrow-Oppose Pollution (S.T.O.P.)
- Poulin, J
- Paschen, J
- Royen, L
- McGaffey, P
- Wighton, D
- Town of Hanna
- Dookie, SS
- Sierra Club of Alberta
- Kariel, P
- Genesee Agricultural Protection Society (G.A.P.S.)
- Skermer, R
- Liba, Z
- Koebernick, W
- Mertz, W
- Koebernick, E
- Liba, L
- Group of Concerned Genesee and Area Citizens
- Lorincz, S
- Fritz, C
- Lawrence, KC
- Unifarm
- Falconberg, H
- Bell, S
- Smith, R
- County of Leduc
- Warburg Coal Company
- Christian Farmers Federation
- Vanderschaaf, Mr
Decision 83-H
https://had.aer.ca/link/decision2272
- Applicant
- Alberta Power Limited
- Application Number
- 830799
- Title
- Decision on application by Alberta Power Ltd., 1983 (to amend approvals to defer unit commissioning dates - Sheerness and Genesee power plants); electric generation expansion 1985-1990 Sheerness and Genesee power plants
- Date
- 1983
- Title
- Decision on application by Alberta Power Ltd., 1983 (to amend approvals to defer unit commissioning dates - Sheerness and Genesee power plants); electric generation expansion 1985-1990 Sheerness and Genesee power plants
- Date
- 1983
- Applicant
- Alberta Power Limited
- Application Number
- 830799
- Hearing Panel
- Goodman CJ
- Strom NA
- Mink FJ
- Hearing Type
- Board
- Utilities
- Category
- Electric power
- Descriptors
- Electric power project
- Genesee power plant
- Sheerness power plant
- Benefit cost analysis
- Capacity
- Electric power demand
- Electric power supply
- Forecasting
- NTS 72M
- NTS 82P
- NTS 83G
- Planning
- Power system interconnection
- Revision
- Legal References
- Energy Resources Conservation Act S42
- Hydro and Electric Energy Act S9
- Notes
- Decision D83-H on application No. 830799 by Alberta Power requesting amendments to the Sheerness and Genesee power plant approvals to defer the unit commissioning dates of Sheerness generating units 1 and 2 and Genesee generating units 2 and 1; errata dated Jan. 10, 1984 included; Board hearing 1983-09-28/29; see related reports 79-AA (& addendum), 80-B and 82-C
Decision 85-21
https://had.aer.ca/link/decision1274
- Applicant
- Alberta Power Limited
- City of Edmonton
- Transalta Utilities Corporation
- Application Number
- 840837
- Title
- Decision on proceeding to amend approval HE 8312 held by Alberta Power Ltd. electric generation expansion 1986-1991 Sheerness and Genesee power plants
- Date
- 1985
- Title
- Decision on proceeding to amend approval HE 8312 held by Alberta Power Ltd. electric generation expansion 1986-1991 Sheerness and Genesee power plants
- Date
- 1985
- Application Number
- 840837
- Hearing Panel
- Millard V
- Goodman CJ
- Mink FJ
- Hearing Type
- Board
- Utilities
- Category
- Electric power
- Descriptors
- Electric power generation
- Electric power project
- Genesee power plant
- Sheerness power plant
- Capacity
- Coal - fuel
- Cost analysis
- Electric power demand
- Expansion
- Forecasting
- Planning
- Power system interconnection
- Socio-economic effect
- Notes
- ERCB Decision D85-21 on proceeding No. 840837 to review commissioning dates of the Sheerness and Genessee generating units in the 1986-1991 period in light of events which occurred after issuance of Decision D83-H; Board Hearing 1985-01-22/23/24/25/30
- Interveners
- Electric Utility Planning Council (EUPC)
- McAvity, EO
- Hanslip, G
- Gunn, J
- Taylor, W
- Valiant, R
- Alberta Power Limited
- Major, JC
- Provost, K
- Frey, JR
- Lake, G
- TransAlta Utilities Corporation
- Patterson, MH
- Hopkins, WJ
- Fraser, WL
- Crowe, T
- The City of Edmonton (Edmonton Power)
- Beames, JW
- Sherk, M
- Kyte, EF
- Pettican, A
- Wright, R
- Wright Mansell Research Ltd.
- The City of Calgary
- Goss, RF
- Larder, DA
- The City of Lethbridge
- Martin, E
- Industrial Power Consumers Association of Alberta (IPCAA)
- Curtis, R
- Clark, BW
- Fording Coal Limited
- Smith, JR
- Manalta Coal Limited
- Holgate, DA
- Portigal, L
- Decker, J
- Shaneman, R
- Luscar Limited
- MacDonald, M
- Smith, D
- Haddock, K
- Electrical Contractors Association of Alberta (ECAA)
- Soucy, GA
- Energy Chemical Workers Union
- Nielsen, R
- Coe, E
- Southern Alberta Building and Construction Trades (Southern Alberta)
- Pittman, PRJ
- Briegel, J
- Alberta and N.W.T. (Distirct of Mackenzie) Building and Construction Trades Council
- Garby, R
- INTEG - Intercontinental Engineering Ltd.
- Smith, MJ
- Cana Construction Co. Ltd.
- Dunlop, JD
- The County of Leduc No. 25
- Walter, EJ
- Pinkowski, K
- The Town of Hanna and District
- McLarty, AL
- Dookie, S
- Grover, A
- The Town of Calmar
- McCartney, G
- The Village of Warburg
- Haggerty, D
- The Village of Thorsby
- Bacsik, L
- Senio, B
- The Village of Breton
- Hilker, JD
- Edmonton Economic Development Authority
- Bleiken, AG
- Battle River Regional Planning Commission
- Scerbak, G
- Fenwick, PD
- Alberta Wind Power Associates
- Otis, J
Decision E80-(p.001)
https://had.aer.ca/link/decision1728
- Applicant
- Alberta Power Limited
- Calgary Power Ltd.
- Application Number
- 790403
- 790406
- 790407
- 790544
- Title
- Examiners report on application by Alberta Power Ltd. and Calgary Power Ltd., 1980 (240 KV transmission lines Cordel-Sheerness-west Brooks-Milo)
- Date
- 1980
- Title
- Examiners report on application by Alberta Power Ltd. and Calgary Power Ltd., 1980 (240 KV transmission lines Cordel-Sheerness-west Brooks-Milo)
- Date
- 1980
- Applicant
- Alberta Power Limited
- Calgary Power Ltd.
- Application Number
- 790403
- 790406
- 790407
- 790544
- Hearing Panel
- Webber HJ
- Homeniuk TF
- Fox EG
- Hearing Type
- Examiners
- Utilities
- Category
- Transmission line
- Descriptors
- Brooks area
- Electric substation
- Red Deer area
- Transmission line
- Alberta
- Battle River power plant
- Electric power supply
- Power system interconnection
- Right of way
- Sheerness power plant
- Southern Alberta
- NTS 82I
- NTS 82P
- NTS 83A
- Route selection
- Legal References
- Hydro and Electric Energy Act S9
- Hydro and Electric Energy Act S11
- Hydro and Electric Energy Act S13
- Hydro and Electric Energy Act S14
- Notes
- ERCB Examiners report on application No. 790407 by Alberta Power to construct and operate a 240 KV single circuit transmission line (AP 259L) from Cordel substation (AP 755S) near the Battle River power plant to the Sheerness power plant and on application No. 790406 to construct and operate 240 KV double circuit transmission line (AP 933L/934L) from Sheerness power plant south to the Red Deer River, and on application No. 790403 by Calgary power to construct and operate 240 KV double circuit transmission line (CP 933L/934L) from Red Deer River to proposed west Brooks substation (CP 28S) and application No. 790544 for 240 KV double circuit transmission line (CP 923L/935L) from west Brooks substation to connect with transmission line CP 924L near Milo; Examiners' hearing 1979-11-27 & 1979-12-04
- Interveners
- Coulthard, C.H.
- Coulthard, G.E.
- Group of Nine
- Paintearth Protective Society
- Palliser Regional Planning Commission
- Griffith, G.
- Griffith, R.
- Hart, W.
- Hart, D.
Decision Memorandum of Decision 1984-09-17
https://had.aer.ca/link/decision129
- Applicant
- Energy Resources Conservation Board
- Application Number
- 840837
- Title
- Memorandum of Decision on Board initiated proceeding to review the commissioning dates of the Genesee and Sheerness generating units, 1984
- Date
- 1984
- Title
- Memorandum of Decision on Board initiated proceeding to review the commissioning dates of the Genesee and Sheerness generating units, 1984
- Date
- 1984
- Applicant
- Energy Resources Conservation Board
- Application Number
- 840837
- Hearing Panel
- Millard, V
- Hearing Type
- Prehearing
- Utilities
- Category
- Electric power
- Descriptors
- Electric power generation
- Electric power project
- Genesee power plant
- Sheerness power plant
- Capacity
- Coal - fuel
- Cost analysis
- Electric power demand
- Expansion
- Forecasting
- Planning
- Power system interconnection
- Socio-economic effect
- Notes
- Memorandum of Decision on proceeding No. 840837 to hear comments and views for the need for a public hearing to determine the currently approved commissioning dates for the Genesee and Sheerness generating units should be changed, the timing and place of such a hearing, the information required and terms of reference
- Interveners
- Alberta Power Limited
- Major, JC
- Provost, K
- Frey, D
- The City of Edmonton (Edmonton Power)
- McDermid, QC
- Kyte, EF
- Pettican, A
- TransAlta Utilities Corporation
- Patterson, MH
- Hopkins, WG
- Fraser, WL
- Chorel, MJ
- Crowe, TW
- The City of Calgary
- Goss, RF
- Steven, WG
- Chymko, NJ
- Kell, BF
- Arsene, W
- Konduc, G
- Babcook, A
- Mallon, DP
- Fording Coal Limited
- Smith, JR
- Shyluk, DJ
- The Industrial Power Consumers Association of Alberta
- McDermott, D
- Garritsen, H
- Alberta Union of Rural Electrification Associations (AUREA)
- Foster, JL
- McGhan, A