Application 000039 (HEARING)
https://had.aer.ca/link/application16121
- Applicant
- Gordon M. Plotke
- Summary
- For an extension of the permit authorizing the transmission of natural gas
- Decision/Order/Approval
- Not available
- Date Registered
- May 18, 1955
- Applicant
- Gordon M. Plotke
- Summary
- For an extension of the permit authorizing the transmission of natural gas
- Category
- Gas
- Descriptors
- Service area
- Transmission line
- Area
- Coutts
- Sweetgrass
- Date Registered
- May 18, 1955
- Decision/Order/Approval
- Not available
- Hearing Location
- Court House, Calgary
- Exhibits
- 4
- Notes
- DECISION NOT AVAILABLE
Application 900087
https://had.aer.ca/link/application6851
- Applicant
- PanCanadian Petroleum Limited
- Summary
- Expansion of project area
- Decision/Order/Approval
- Deregistered by letter dated 900208
- Date Registered
- Jan 10, 1990
- Applicant
- PanCanadian Petroleum Limited
- Summary
- Expansion of project area
- Category
- Oil
- Descriptors
- Service area
- Alteration
- Area
- Alderson
- Date Registered
- Jan 10, 1990
- Decision/Order/Approval
- Deregistered by letter dated 900208
Application 980622
https://had.aer.ca/link/application41859
- Applicant
- Suncor Energy Inc.
- Summary
- Requesting for an Industrial System Designation and Exemption.
- Decision/Order/Approval
- HE 9908
- Date Registered
- Dec 09, 1998
- Applicant
- Suncor Energy Inc.
- Summary
- Requesting for an Industrial System Designation and Exemption.
- Category
- Reservoir Development
- Area
- Fort McMurray
- Date Registered
- Dec 09, 1998
- Decision/Order/Approval
- HE 9908
Decision 75-04
https://had.aer.ca/link/decision2174
- Applicant
- Alberta Power Limited
- Calgary Power Ltd.
- Application Number
- 7759
- 7966
- 7992
- 7996
- Title
- Decision on application by Alberta Power Ltd. and Calgary Power Ltd. , 1975 (Conklin power plant and electric distribution system)
- Date
- 1975
- Title
- Decision on application by Alberta Power Ltd. and Calgary Power Ltd. , 1975 (Conklin power plant and electric distribution system)
- Date
- 1975
- Applicant
- Alberta Power Limited
- Calgary Power Ltd.
- Application Number
- 7759
- 7966
- 7992
- 7996
- Hearing Panel
- Millard V
- Strong JI
- DeSorcy GJ
- Hearing Type
- Board
- Utilities
- Category
- Electric power
- Descriptors
- Electric power distribution
- Electric power project
- Service area
- Thermal power plant
- Transmission line
- Cost analysis
- Diesel fuel
- Economic analysis
- NTS 73M
- Legal References
- Hydro and Electric Energy Act S7
- Hydro and Electric Energy Act S20
- Hydro and Electric Energy Act S23
- Notes
- Decision 75-4 on application No. 7759 and 7966 by Alberta Power and on application No. 7992 and 7996 by Calgary power both to construct & operate a small diesel power plant and an electric distribution system in the settlement of Conklin and for an alteration to their service areas to include the Conklin area.
Decision 76-05
https://had.aer.ca/link/decision2159
- Applicant
- Town of Blairmore
- Application Number
- 8964
- Title
- Decision on application by Town of Blairmore, 1976 (alteration of electrical distribution system)
- Date
- 1976
- Title
- Decision on application by Town of Blairmore, 1976 (alteration of electrical distribution system)
- Date
- 1976
- Applicant
- Town of Blairmore
- Application Number
- 8964
- Hearing Panel
- Craig DR
- DeSorcy GJ
- Goodman CJ
- Hearing Type
- Board
- Utilities
- Category
- Electric power
- Descriptors
- Blairmore area
- Electric power distribution
- Service area
- Boundary
- Cost of service
- Expansion
- NTS 82G
- Revision
- Legal References
- Hydro and Electric Energy Act S22
- Hydro and Electric Energy Act S23
- Notes
- Decision 76-5 (and addendum) on application No. 8964 to enlarge the boundaries of service area to include the Town of Blairmore water pumphouse.
- Interveners
- Calgary Power Ltd.
- Nine Residential Customers
Decision 76-07
https://had.aer.ca/link/decision2157
- Applicant
- Rochfort Rural Electrification Association
- Application Number
- 9389
- Title
- Decision on application by Rochfort Rural Electrification Association, 1976 (to cease operations of its electric distribution system)
- Date
- 1976
- Title
- Decision on application by Rochfort Rural Electrification Association, 1976 (to cease operations of its electric distribution system)
- Date
- 1976
- Application Number
- 9389
- Hearing Panel
- Millard V
- Hearing Type
- Board
- Utilities
- Category
- Electric power
- Legal References
- Hydro and Electric Energy Act S23
- Hydro and Electric Energy Act S24
- Notes
- Decision 76-7 on application No. 9389 to cease operations of its electric distribution system located in TP.55-58, R.7-8 W5M.
- Interveners
- Farm Electric Services Ltd.
- Calgary Power Ltd.
- Union of rural Electrification Associations Limited
- Colinton Paxson Rural Electrification Association
- Group of 9 Members of the Rochfort REA
- Rural Power and Gas Co-op Branch of the Alberta Department of Consumer and Corporate Affairs
Decision 80-C
https://had.aer.ca/link/decision2326
- Applicant
- Calgary Power Ltd.
- Alberta Power Limited
- Application Number
- 790181
- 790343
- Title
- Decision on application by Calgary Power Ltd. and Alberta Power Ltd., 1980 electric service area, Cold Lake area
- Date
- 1980
- Title
- Decision on application by Calgary Power Ltd. and Alberta Power Ltd., 1980 electric service area, Cold Lake area
- Date
- 1980
- Applicant
- Calgary Power Ltd.
- Alberta Power Limited
- Application Number
- 790181
- 790343
- Hearing Type
- Utilities
- Category
- Electric power
- Descriptors
- Cold Lake area
- Electric power distribution
- Service area
- Boundary
- Cold Lake heavy oil project
- Electric power demand
- Heavy oil project
- NTS 73L
- Revision
- Legal References
- Hydro and Electric Energy Act S9
- Hydro and Electric Energy Act S14
- Hydro and Electric Energy Act S20
- Hydro and Electric Energy Act S23
- Notes
- ERCB report 80-C on application No. 790181 by Calgary power to supply purchased power requirements for Cold Lake project and on application No. 790343 by Alberta Power to alter the boundaries of its existing service area to include the Cold Lake project (TP.63-66, R.1-10, W4M).
Decision 81-08
https://had.aer.ca/link/decision2000
- Applicant
- City of Medicine Hat
- Application Number
- 810047
- Title
- Decision on application by City of Medicine Hat, 1981 (extension of service area)
- Date
- 1981
- Title
- Decision on application by City of Medicine Hat, 1981 (extension of service area)
- Date
- 1981
- Applicant
- City of Medicine Hat
- Application Number
- 810047
- Hearing Panel
- Goodman CJ
- Homeniuk TF
- Pow JR
- Hearing Type
- Board
- Utilities
- Category
- Electric power
- Legal References
- Hydro and Electric Energy Act S20
- Notes
- Decision on application to extend service area into area (section 11-12-6 W4M) that is currently within the service area assigned to Calgary Power
- Interveners
- Calgary Power Ltd.
- Felesky, H.
Decision 81-30
https://had.aer.ca/link/decision1978
- Applicant
- TransAlta Utilities Corporation
- Alberta Power Limited
- Application Number
- 810258
- 810425
- Title
- Decision on application by TransAlta Utilities Corporation and Alberta Power Ltd., 1981 (extension to service areas to serve Winefred Lake area)
- Date
- 1981
- Title
- Decision on application by TransAlta Utilities Corporation and Alberta Power Ltd., 1981 (extension to service areas to serve Winefred Lake area)
- Date
- 1981
- Application Number
- 810258
- 810425
- Hearing Panel
- Millard V
- DeSorcy GJ
- Goodman CJ
- Hearing Type
- Board
- Utilities
- Category
- Electric power
- Descriptors
- Electric power distribution
- Northeast Alberta
- Service area
- Conflict
- Expansion
- NTS 73L
- NTS 73M
- NTS 74D
- NTS 83I
- NTS 83P
- NTS 84A
- Planning
- Legal References
- Hydro and Electric Energy Act S23
- Hydro and Electric Energy Act S26
- Notes
- Decision 81-30 on application No. 810258 by TransAlta Utilities and 810425 by Alberta Power for extensions to their respective service areas (TP.59-90, R.1-18, W4M); Board hearing 1981-08-18/19/20/26/27 & 1981-11-13 see related ERCB report 82-B
Decision 82-16
https://had.aer.ca/link/decision2062
- Applicant
- City of Edmonton
- Edmonton Power
- Application Number
- 810819
- Title
- Decision on application by Edmonton Power, 1982 (to expand the boundaries of its electric distribution system service area)
- Date
- 1982
- Title
- Decision on application by Edmonton Power, 1982 (to expand the boundaries of its electric distribution system service area)
- Date
- 1982
- Applicant
- City of Edmonton
- Edmonton Power
- Application Number
- 810819
- Hearing Panel
- Millard V
- DeSorcy GJ
- Goodman CJ
- Hearing Type
- Board
- Utilities
- Category
- Electric power
- Descriptors
- Edmonton area
- Electric power distribution
- Service area
- Boundary
- Compensation
- Expansion
- NTS 83H
- Revision
- Legal References
- Hydro and Electric Energy Act S26
- Notes
- Decision 82-16 on application No. 810819 to expand the limits of its electric distribution service area to coincide with the City of Edmonton corporate limits and to reduce the limits of TransAlta's service area correspondingly (TP.51-54, R.23-26, W4M).
- Interveners
- TransAlta Utilities Corporation
- Genstar Cement Limited
- Fiberglass Canada Inc.
Decision 82-B
https://had.aer.ca/link/decision2311
- Applicant
- TransAlta Utilities Corporation
- Alberta Power Limited
- Application Number
- 810258
- 810425
- Title
- Decision on application by TransAlta Utilities Corporation and on application by Alberta Power Ltd., 1982 (electric service area, Winefred Lake)
- Date
- 1982
- Title
- Decision on application by TransAlta Utilities Corporation and on application by Alberta Power Ltd., 1982 (electric service area, Winefred Lake)
- Date
- 1982
- Application Number
- 810258
- 810425
- Hearing Panel
- Millard V
- DeSorcy GJ
- Goodman CJ
- Hearing Type
- Board
- Utilities
- Category
- Electric power
- Descriptors
- Electric power distribution
- Northeast Alberta
- Service area
- Conflict
- Electric power demand
- Electric power supply
- Energy development
- Expansion
- NTS 73L
- NTS 73M
- NTS 74D
- NTS 83I
- NTS 83P
- NTS 84A
- Planning
- Reliability
- Legal References
- Hydro and Electric Energy Act S23
- Hydro and Electric Energy Act S26
- Notes
- ERCB report 82-B on application No. 810258 by TransAlta to extend electric service to Winefred Lake area and application No. 810425 by Alberta Power to extend electric service to Anzac, Janvier and Winefred Lake area (TP.59-90, R.1-18, W4M); Board hearing 1981-08-18/19/20/26/27
Decision 84-14|84-14 Addendum
https://had.aer.ca/link/decision1849
- Applicant
- ESSO Petroleum Canada, a Division of Imperial Oil Limited
- Application Number
- 840136
- Title
- Decision on application by ESSO Petroleum Canada, a Division of Imperial Oil Limited, 1984 (to amend ERCB approval HE 8208) (and addendum)
- Date
- 1984
- Title
- Decision on application by ESSO Petroleum Canada, a Division of Imperial Oil Limited, 1984 (to amend ERCB approval HE 8208) (and addendum)
- Date
- 1984
- Application Number
- 840136
- Hearing Panel
- DeSorcy GJ
- Bohme VE
- Goodman CJ
- Hearing Type
- Board
- Utilities
- Category
- Electric power
- Descriptors
- Edmonton area
- Electric power distribution
- Service area
- Boundary
- Electric power rate
- Expansion
- Industrial plant
- NTS 83H
- Oil refinery
- Revision
- Legal References
- Energy Resources Conservation Act S42
- Hydro and Electric Energy Act S1
- Hydro and Electric Energy Act S4
- Hydro and Electric Energy Act S5
- Hydro and Electric Energy Act S17
- Hydro and Electric Energy Act S26
- Notes
- Decision D84-14 and addendum (dated Jan. 11, 1985) on application No. 840136 to amend Board approval No. HE 8208 by altering the boundary of the electric distribution system and service area of the City of Edmonton by excluding the ESSO south tank farm.
- Interveners
- The City of Edmonton
- TransAlta Utilities Corporation
- Fiberglas Canada Inc.
- Industrial Power Consumers Association of Alberta
Decision 99-06
https://had.aer.ca/link/decision3031
- Applicant
- South Alta Rural Electrification Association
- Application Number
- 980580
- Title
- Decision 99-06: South Alta REA service area boundary extension to serve SE 20-11-15 W4M
- Date
- 1999
- Title
- Decision 99-06: South Alta REA service area boundary extension to serve SE 20-11-15 W4M
- Date
- 1999
- Application Number
- 980580
- Hearing Panel
- Berg AJ
- Bietz BF
- Nichol JR
- Hearing Type
- Board
- Utilities
- Category
- Electric power
- Descriptors
- Service area
- Boundary
- Expansion
- NTS 72E
- Electric power
- Legal References
- Hydro and Electric Energy Act S26
- Hydro and Electric Energy Act S28
- Hydro and Electric Energy Act S29
- Notes
- EUB Decision D99-06 on Application No. 980580 by South Alta Rural Electrification Association (REA) for an extension of its service area boundary to include the SE quarter of Section 20-11-15 W4M which is currently within the service area of TransAlta Utilities Corporation;
- Interveners
- TransAlta Utilities Corporation
- Alberta Power Limited
- Cameron Farms Colony Limited
- Location
- ##-20-011-15W4
Decision 2002-04
https://had.aer.ca/link/decision3495
- Applicant
- ESBI Alberta Ltd.
- Western Systems Coordinating Council
- Application Number
- 1247147
- File No. 1804-3
- Title
- Decision 2002-4: ESBI Alberta Ltd. reliability criteria agreement third amendment
- Date
- 2002
- Title
- Decision 2002-4: ESBI Alberta Ltd. reliability criteria agreement third amendment
- Date
- 2002
- Application Number
- 1247147
- File No. 1804-3
- Hearing Panel
- Berg AJ
- Dilay JD
- Lock RG
- Hearing Type
- Utilities
- Category
- Electric power
- Good production practice
- Descriptors
- Contract
- Electric power distribution
- Electric power generation
- Electric power plant
- Electric power transmission
- Operating
- Performance
- Reliability
- Reliability criteria agreement
- Revenue requirement
- Service area
- Services
- Transmission administrator
- Legal References
- Transmission Matters Deficiency Correction Regulation S7
- Notes
- EUB Decision 2002-4 re ESBI's application seeking approval of a third amendment to the Reliability Criteria Agreement made pursuant to Section 7.2 of the Transmission Matters Deficiency Correction Regulation seeking a revision which would allow the applicant to request additional information from RMS if the RCC determined that it would assist the RCC in its review of non-compliance with reliability criteria and to change the period for reducing flows on stability limited paths to below Operating Transfer Capability limits from 10 minutes to 20.
- Approval
- Approved
Decision 2002-70
https://had.aer.ca/link/decision3530
- Applicant
- ESBI Alberta Ltd.
- Application Number
- 1246585
- File No. 1804-2
- Title
- Decision 2002-70: ESBI Alberta Ltd. Valleyview transmission must run services agreement compliance filing
- Date
- 2002
- Title
- Decision 2002-70: ESBI Alberta Ltd. Valleyview transmission must run services agreement compliance filing
- Date
- 2002
- Applicant
- ESBI Alberta Ltd.
- Application Number
- 1246585
- File No. 1804-2
- Hearing Panel
- Berg AJ
- Miller GJ
- Gilmour JG
- Hearing Type
- Utilities
- Category
- Electric power
- Descriptors
- Alberta
- Decision D2000-01
- Decision D2002-31
- Electric power distribution
- Electric power generation
- Electric power plant
- Electric power transmission
- Service area
- Transmission administrator
- Legal References
- Transmission Matters Deficiency Correction Regulation
- Approval
- Approved
Decision 2002-85
https://had.aer.ca/link/decision3547
- Applicant
- ATCO Electric Limited
- Application Number
- 1244123
- 1247885
- File No. 1109-8
- File No. 1109-9
- Title
- Decision 2002-85: ATCO Electric Ltd. 2002 regulated rate option tariff - Part C: 2002 rates
- Date
- 2002
- Title
- Decision 2002-85: ATCO Electric Ltd. 2002 regulated rate option tariff - Part C: 2002 rates
- Date
- 2002
- Applicant
- ATCO Electric Limited
- Application Number
- 1244123
- 1247885
- File No. 1109-8
- File No. 1109-9
- Hearing Panel
- Berg AJ
- Miller GJ
- Nichol JR
- Hearing Type
- Utilities
- Category
- Electric power rate
- Interveners
- AE Disco
- Enmax Energy Corporation
- Rirm Customer Group
- Senior Petroleum Producers Association
- Approval
- Deferred upon refiling
Decision 2002-103
https://had.aer.ca/link/decision3570
- Applicant
- ESBI Alberta Ltd. (EAL)
- Application Number
- 1244140
- File No. 1804-1-1
- Title
- Decision 2002-103: Transmission Administrator finalization of articles 4 and 24 of terms and conditions of service for 2001 and 2002
- Date
- 2002
- Title
- Decision 2002-103: Transmission Administrator finalization of articles 4 and 24 of terms and conditions of service for 2001 and 2002
- Date
- 2002
- Applicant
- ESBI Alberta Ltd. (EAL)
- Application Number
- 1244140
- File No. 1804-1-1
- Hearing Panel
- MacDonald NW
- Berg AJ
- Lock RG
- Hearing Type
- Utilities
- Descriptors
- Decision D2002-46
- Service area
- Terms and conditions
- Interveners
- Ancillary Services Group
- ATCO Power
- Calpine Canada Ltd.
- City of Lethbridge
- City of Red Deer
- EnCana Corporation
- Engage Energy Canada L.P.
- Enmax Energy Corporation
- Enmax Power Corporation
- Enron Canada Corp
- Epcor Generation Inc.
- Epcor Power Development Corporation
- Firm Group
- Husky Energy
- Industrial Power Consumers and Cogenerators Association of Alberta
- Industrial Power Produces Society of Alberta
- Senior Petroleum Producers Association
- TransCanada Energy Ltd
- Belland R
- Bernette Ho L
- Burgess LJ
- Crowther DE
- Cusano LA
- Forester MS
- Jeffrey PR
- Karl P
- Leier P
- Levson D
- Lowe JE
- Macnamara D
- Manning LL
- Marcus W
- McCreary CR
- McKenzie N
- Merritt M
- Miller KF
- Moon A
- Nichols JR
- Roach C Dr.
- Sisson K
- Smith PA
- Sutherland D
- Unryn H
- Wachowich JA
- Wood DM
- Woychik E
- Zimmer D
- Approval
- Approved
Decision 2003-07
https://had.aer.ca/link/decision3737
- Applicant
- Battle River Rural Electrification Association Ltd.
- Application Number
- 1270094
- Title
- Decision 2003-7: Memorandum of Decision : Hearing stage one Battle River REA
- Date
- 2003
- Title
- Decision 2003-7: Memorandum of Decision : Hearing stage one Battle River REA
- Date
- 2003
- Application Number
- 1270094
- Hearing Panel
- Miller GJ
- McGee TM
- Gilmour JG
- Hearing Type
- Prehearing
- Utilities
- Category
- Electric power
- Descriptors
- Battle River region
- NTS 73D
- NTS 84A
- Service area
- Electric power distribution
- Interveners cost
- Legal References
- Rural Utilities Regulation S17
- Interveners
- Alberta Federation of REA's
- ATCO Electric Ltd.
- Aquila Networks Canada (Alberta) Ltd.
- Anderson Group
Decision 2003-41
https://had.aer.ca/link/decision3747
- Applicant
- South Alta Rural Electrification Association Ltd.
- Application Number
- 1277912
- Title
- Decision 2003-41: South Alta Rural Electrification Association Ltd. Application to alter service area boundary
- Date
- 2003
- Title
- Decision 2003-41: South Alta Rural Electrification Association Ltd. Application to alter service area boundary
- Date
- 2003
- Application Number
- 1277912
- Hearing Panel
- McGee TM
- Lock RG
- Asgar-Deen ML
- Hearing Type
- Utilities
- Category
- Electric power
- Descriptors
- Regulation
- Rural Electrification Association
- Service area
- Legal References
- Hydro and Electric Energy Act S25
- Notes
- EUB Decision on application no. 1277912 by South Alta to expand it service area in order to serve Holtman Farms; Board denies application and directs South Alta and intervener Aquila to resolve ongoing customer issues through dispute resolution process
- Interveners
- Holtman Farms
- Holtman S
- Cameron Farms
- Hofer J
- Tverkutes Mr.
- Aquila Networks Canada (Alberta) Ltd.
- Kirrmaier H
- Martin JJ
- Finlay DD
- Approval
- Denied
Decision 2003-52
https://had.aer.ca/link/decision3750
- Applicant
- AltaGas Utilities Inc.
- Application Number
- 1302431
- Title
- Decision 2003-52: AltaGas Utilities Inc. interim rates for the Bonnyville service area
- Date
- 2003
- Title
- Decision 2003-52: AltaGas Utilities Inc. interim rates for the Bonnyville service area
- Date
- 2003
- Applicant
- AltaGas Utilities Inc.
- Application Number
- 1302431
- Hearing Panel
- Lock RG
- Miller GJ
- Gilmour JG
- Hearing Type
- Utilities
- Category
- Gas rate
- Descriptors
- Bonnyville area
- Distribution system
- Interim rate
- Service area
- Approval
- Denied