19 records – page 1 of 1.

Decision 75-01

https://had.aer.ca/link/decision2177
Applicant
Calgary Power Ltd.
Application Number
7728
7770
Title
Decision on application by Calgary Power Ltd., 1975 (240 KV transmission line from Ellerslie to Red Deer)
Date
1975
Title
Decision on application by Calgary Power Ltd., 1975 (240 KV transmission line from Ellerslie to Red Deer)
Date
1975
Applicant
Calgary Power Ltd.
Application Number
7728
7770
Hearing Panel
Millard V
Strong JI
DeSorcy GJ
Hearing Type
Board
Utilities
Category
Transmission line
Descriptors
Ellerslie area
Red Deer area
Transmission line
Electric power demand
ERCB 74-B
NTS 83A
NTS 83H
Right of way
Route selection
Sundance power plant
Legal References
Hydro and Electric Energy Act S10
Notes
Decision 75-1 on application No. 7728 and No. 7770 to dismantle part of transmission line CP 12L between Ellerslie and Red Deer and to construct and operate new higher voltage transmission line along the existing right of way.
Interveners
Lachman, Mr. R.
Lachman, Mrs. R.
Stebner, A.
Morrisroe, J.T.
City of Red Deer
Red Deer Regional Planning Commission
Bilsborrow, M.J.
Brown, G.A.
Stretch, D.A.
Edmonton Regional Planning Commission
Bilsborrow, E.B.
Department of Highways and Transport
The City of Edmonton
Less detail

Decision 75-N

https://had.aer.ca/link/decision2353
Applicant
Alberta Gas Ethylene Company Limited
Dupont of Canada Limited
Dow Chemical of Canada Limited
Canadian Industries Limited
Application Number
8491
8514
8549
8554
Title
Decision on application by Alberta Gas Ethylene Company Ltd., Dupont of Canada Limited, Dow Chemical Of Canada Limited and Canadian Industries Limited, 1975 (Oil and Gas Conservation Act, section 42)
Date
1975
Title
Decision on application by Alberta Gas Ethylene Company Ltd., Dupont of Canada Limited, Dow Chemical Of Canada Limited and Canadian Industries Limited, 1975 (Oil and Gas Conservation Act, section 42)
Date
1975
Applicant
Alberta Gas Ethylene Company Limited
Dupont of Canada Limited
Dow Chemical of Canada Limited
Canadian Industries Limited
Application Number
8491
8514
8549
8554
Hearing Panel
Govier GW
Millard V
DeSorcy GJ
Hearing Type
Board
Category
Industrial development permit
Descriptors
Chemical plant
Chloroethylene
Dichloroethane
Ethylene
Fort Saskatchewan area
Industrial development permit
Joffre area
Polymer
Red Deer area
Redwater area
Alberta
Chlorine - raw material
Economic analysis
Environmental impact
Ethane - raw material
Ethylene - raw material
Natural gas - fuel
NTS 83A
NTS 83H
Socio-economic effect
Legal References
Oil and Gas Conservation Act S42
Notes
ERCB report 75-N on application No. 8491 (A.G.E.) to use ethane and gas as fuel and raw material to produce ethylene near Red Deer (A.G.E. unit 1) (permit No. age 76-1) and on application No. 8514 (Dupont) to use gas as fuel in production of high density polyethylene near Red Deer (application withdrawn) and on application No. 8549 (Dow) to use gas as fuel in vinyl chloride monomer plant near Fort Saskatchewan (permit no.DCC 76-1) and on application No. 8554 (CIL) to use gas as fuel in a low density polyethylene plant near Redwater (application withdrawn); Board hearing (age & Dupont); 1975-06-18/19/20 Board hearing (Dow & CIL) 1975-07-09.
Less detail

Decision 77-05

https://had.aer.ca/link/decision2143
Applicant
Alberta Gas Trunk Line Company Limited
Dome Petroleum Limited
Application Number
9608
Title
Decision on application by Alberta Gas Trunk Line Company Limited and Dome Petroleum Limited, 1977 (permit to construct a pipeline from red deer to Fort Saskatchewan, part 1)
Date
1977
Title
Decision on application by Alberta Gas Trunk Line Company Limited and Dome Petroleum Limited, 1977 (permit to construct a pipeline from red deer to Fort Saskatchewan, part 1)
Date
1977
Applicant
Alberta Gas Trunk Line Company Limited
Dome Petroleum Limited
Application Number
9608
Hearing Panel
Craig DR
Millard V
DeSorcy GJ
Hearing Type
Board
Category
Pipelines
Descriptors
Edmonton area
Butane
Ethane
Fort Saskatchewan area
Oil pipeline
Pipeline construction permit
Pentanes plus
Propane
Red Deer area
NTS 83A
NTS 83H
Pipeline design
Pipeline route
Route selection
Safety
Legal References
Pipeline Act
Notes
Decision 77-5 on application No. 9608 to construct an oil line to transport ethane, propane, butanes and pentanes plus from the age plant under construction near Joffre and from Dome's Edmonton liquid gas plant to storage and eventual delivery to the Cochin pipeline at Fort Saskatchewan; Board hearing 1977-02-09 reconvened 1977-03-08; see also Decision 77-06
Interveners
The Alberta Gas Ethylene Company Ltd.
Aristocrat Holdings Ltd.
The Battle River Regional Planning Commission
Dow Chemical of Canda Limited
Hampson, C.G.
Harmin Farms
Mayer, H.
Paley, M.
Heppner, E.
Heppner, L.W.
Heppner, M.M.
Heppner, E.A.
Heppner, M.M.R.
Chimer, W.
Cathton Holdings Ltd.
Fenske, W.A.
Lengert, H.
Lentz, C.
Madison Development Corporation Ltd.
Opaninski, B
Opalinski, T.
Yaskowich, J
Ziobro, S.
Shell Canada Resources Limited
PanCanadian Petroleum Limited
Kataleen, A.Y.
Less detail

Decision 77-10

https://had.aer.ca/link/decision2138
Applicant
Alberta Gas Trunk Line Company Limited
Dome Petroleum Limited
Application Number
770084
Title
Decision on application by Alberta Gas Trunk Line Company Limited and Dome Petroleum Limited, 1977 (construct a pipeline from Cochrane to Red Deer)
Date
1977
Title
Decision on application by Alberta Gas Trunk Line Company Limited and Dome Petroleum Limited, 1977 (construct a pipeline from Cochrane to Red Deer)
Date
1977
Applicant
Alberta Gas Trunk Line Company Limited
Dome Petroleum Limited
Application Number
770084
Hearing Panel
Craig DR
Millard V
DeSorcy GJ
Hearing Type
Board
Category
Pipelines
Descriptors
Butane
Ethane
Cochrane area
Oil pipeline
Pipeline construction permit
Pentanes plus
Propane
Red Deer area
Chemical plant
Environmental impact
NTS 82P
NTS 83A
Pipeline design
Pipeline route
Safety
Legal References
Pipeline Act
Notes
Decision 77-10 on application No. 770084 to construct an oil line to transport ethane, propane, butane and pentanes plus from a point in the NE quarter of section 16, TP.26, R.4 (W5M) near Cochrane to a point in the NW quarter of section 8, TP.38, R.25 (W4M) near Red Deer as part of the Alberta ethane gathering system to provide a continous supply of ethane to the age plant at Joffre.
Interveners
Alberta Natural Gas Company Ltd.
Beddoes, J.L.
Less detail

Decision 77-21

https://had.aer.ca/link/decision2127
Applicant
Calgary Power Ltd.
Application Number
770118
Title
Decision on application by Calgary Power Ltd., 1977 (240 KV transmission line facilities in the Red Deer Calgary area)
Date
1977
Title
Decision on application by Calgary Power Ltd., 1977 (240 KV transmission line facilities in the Red Deer Calgary area)
Date
1977
Applicant
Calgary Power Ltd.
Application Number
770118
Hearing Panel
Millard V
Berkowitz N
Bohme VE
Hearing Type
Board
Utilities
Category
Transmission line
Descriptors
Calgary area
Red Deer area
Transmission line
Agricultural land
Capacity
Electric power demand
Electric power supply
Health
NTS 82P
NTS 83A
Right of way
Route selection
Safety
Legal References
Hydro and Electric Energy Act S9
Hydro and Electric Energy Act S11
Hydro and Electric Energy Act S13
Hydro and Electric Energy Act S14
Notes
Decision 77-21 on application No. 770118 to construct and operate a 240 KV transmission line from the Red Deer substation (CP 63S) to a location 23.4 km north of the Janet substation (CP 74S).
Interveners
A Group of 35 Parties
Sackett, K.
Radau, F.
Latimer, M.E.
Bagrie, D.W.
Osterman, Mrs.
Less detail

Decision 78-07

https://had.aer.ca/link/decision2113
Applicant
Alberta Gas Ethylene Company Limited
Application Number
770666
Title
Decision on application by Alberta Gas Ethylene Company Ltd., 1978 (construct a pipeline from Joffre to Fort Saskatchewan)
Date
1978
Title
Decision on application by Alberta Gas Ethylene Company Ltd., 1978 (construct a pipeline from Joffre to Fort Saskatchewan)
Date
1978
Applicant
Alberta Gas Ethylene Company Limited
Application Number
770666
Hearing Panel
Millard V
Bohme VE
DeSorcy GJ
Hearing Type
Board
Category
Pipelines
Descriptors
Ethylene
Fort Saskatchewan area
Pipeline construction permit
Product pipeline
Red Deer area
Agricultural land
Buried
NTS 83A
NTS 83H
Pipeline construction
Pipeline design
Pipeline route
Route selection
Legal References
Pipeline Act S7
Notes
Decision on application to construct a pipeline to transport ethylene from LSD 5-32-38-25 W4M to LSD 15-11-55-22 W4M and a meter station in LSD 15-11-55-22 W4M; Pipeline permit 14763 se related decision D79-2 for portion of the line in TP.52-53, R.22-23, W4M which was deferred in original decision
Interveners
Dow Chemical of Canada Limited
Dome Petroleum Limited
Group of Farmers Headed by W.A. Lovell
Holubisky, P.
Holubisky, S.
Canadian Industries Limited
Genstar Development Company Limited
Windsor, G.
Arnold Brothers Transport Ltd.
Qualico Developments
Less detail

Decision 80-30

https://had.aer.ca/link/decision2009
Applicant
Alberta Products Pipe Line Limited
Application Number
800440
Title
Decision on application by Alberta Products Pipe Line Ltd., 1980 (permit to construct a pipeline from Edmonton to Calgary)
Date
1980
Title
Decision on application by Alberta Products Pipe Line Ltd., 1980 (permit to construct a pipeline from Edmonton to Calgary)
Date
1980
Applicant
Alberta Products Pipe Line Limited
Application Number
800440
Hearing Panel
DeSorcy GJ
Strom NA
Evans RG
Hearing Type
Board
Category
Pipelines
Descriptors
Calgary area
Edmonton area
Petroleum product
Pipeline construction permit
Pipeline project
Product pipeline
Red Deer area
Capacity
Demand (economics)
Environmental impact
NTS 82P
NTS 83A
NTS 83H
Pipeline crossing
Pipeline design
Pipeline route
Right of way
Route selection
Supply (economics)
Transmission corridor
Transportation corridor
Notes
Decision 80-30 on application No. 800440 to construct a pipeline to transport gasolines, diesel fuel, aviation fuels, solvents, and heating oil from a pump station in Edmonton to existing facilities in Calgary (TP.23-53, 23-29, W4M); Board hearing 1980-09-23/26; see related Decisions 81-31 and 81-34 for Decisions on specific segments of route that were matters of concern
Interveners
County of Lacombe No. 14
Daines Farms Ltd.
Paul S. Seiferling
Battle River Regional Planning Commission
City of Edmonton
Turbo Resources Ltd.
Crows Nest Resources Ltd.
Daon Corporation
Less detail

Decision 81-10

https://had.aer.ca/link/decision1998
Applicant
Alberta Gas Ethylene Company Limited
Application Number
800853
Title
Decision on application by Alberta Gas Ethylene Company Ltd., 1981 (industrial development permit to manufacture ethylene)
Date
1981
Title
Decision on application by Alberta Gas Ethylene Company Ltd., 1981 (industrial development permit to manufacture ethylene)
Date
1981
Applicant
Alberta Gas Ethylene Company Limited
Application Number
800853
Hearing Panel
DeSorcy GJ
Strom NA
Webber HJ
Hearing Type
Board
Category
Industrial development permit
Descriptors
Chemical plant
Ethylene
Industrial development permit
Red Deer area
Air quality
Benefit cost analysis
Design criteria
Emission
Environmental impact
Ethane
Ethane - raw material
Forecasting
Land use
Marketing
Natural gas - fuel
Noise (sound)
NTS 83A
Pollution
Raw material
Socio-economic effect
Supply (economics)
Water
Water quality
Legal References
Oil and Gas Conservation Act S42
Notes
Decision 81-10 on application No. 800853 to use ethane as feedstock and natural gas as fuel to manufacture ethylene in plant to be constructed (unit 3) adjacent to present facilities (units 1&2) near Joffre (TP.38, R.25, W4M); Board hearing 1981-04-07/08
Interveners
Preserve Agricultural Land
Red Deer Regional Planning Commission
Hainsworth, B.W.
Chessor, D.
Alberta Energy Company Ltd.
Esso Chemical Canada
Du Pont Canada Inc.
Dow Chemical of Canada Limited
NOVA, AN ALBERTA CORPORATION
Shell Canada Limited
Union Carbide Canada Limited
Dome Petroleum Limited
Esso Resources Canada Limited
Gulf Canada Resources Inc.
Hudson's Bay Oil and Gas Company Limited
Sulpetro Limited
Texaco Canada Resources Ltd.
Less detail

Decision 81-16

https://had.aer.ca/link/decision1992
Applicant
Nova, an Alberta Corporation
Shell Canada Limited
Application Number
800910
Title
Decision on application by Nova, an Alberta Corporation and Shell Canada Limited, 1981 (industrial development permit to manufacture polyethylene)
Date
1981
Title
Decision on application by Nova, an Alberta Corporation and Shell Canada Limited, 1981 (industrial development permit to manufacture polyethylene)
Date
1981
Applicant
Nova, an Alberta Corporation
Shell Canada Limited
Application Number
800910
Hearing Panel
DeSorcy GJ
Strom NA
Webber HJ
Hearing Type
Board
Category
Industrial development permit
Descriptors
Chemical plant
Ethylene homopolymer
Industrial development permit
Red Deer area
Demand (economics)
Economic analysis
Environmental impact
Ethylene - raw material
Land use
Locating
Marketing
Natural gas - fuel
Noise (sound)
NTS 83A
Plant location
Pollution
Socio-economic effect
Supply (economics)
Water quality
Water supply
Notes
Decision 81-16 on application No. 800910 to use ethylene as feedstock and gas as fuel to manufacture polyethylene at a LINEAR low-density polyethylene plant to be constructed on the site of Alberta gas ethylene'S existing ethylene plant east of Red Deer (TP.38-40, R.23-27, W4M).
Interveners
Preserve Agricultural Land
Alberta Institute of Agrologists Red Deer Branch
F.E.M. Farms
Hainsworth, J.W.
Federation of Alberta Naturalists Land Use Committee
Red Deer Regional Planning Commission
Dow Chemical of Canada Limited
Union Carbide Canada Limited
Alberta Energy Company Ltd.
Du Pont Canada Inc.
Esso Chemical Canada
Less detail

Decision 81-29

https://had.aer.ca/link/decision1737
Applicant
Calgary Power Ltd.
Application Number
810274
Title
Examiners report on application by Calgary Power Ltd., 1981 (138 KV transmission line north Red Deer area)
Date
1981
Title
Examiners report on application by Calgary Power Ltd., 1981 (138 KV transmission line north Red Deer area)
Date
1981
Applicant
Calgary Power Ltd.
Application Number
810274
Hearing Panel
Paterson RG
Brushett ER
Yu JNG
Hearing Type
Examiners
Utilities
Category
Transmission line
Descriptors
Red Deer area
Transmission line
Electric power demand
NTS 83A
Route selection
Legal References
Hydro and Electric Energy Act S9
Hydro and Electric Energy Act S11
Hydro and Electric Energy Act S13
Hydro and Electric Energy Act S14
Hydro and Electric Energy Act S15
Hydro and Electric Energy Act S17
Notes
ERCB Examiners report no.E81-29 on application No. 810274 to construct and operate a 138 KV transmission line between existing transmission line 756L and the north Red Deer substation (TP.38-39, R.26-27, W4M).
Interveners
City of Red Deer
Consolidated Concrete Limited
Less detail

Decision 81-34

https://had.aer.ca/link/decision1974
Applicant
Alberta Products Pipe Line Limited
Application Number
810460
810461
810462
810513
Title
Decision on application by Alberta Products Pipe Line Ltd., 1981 (permit to construct deferred portions of a pipeline - Edmonton to Calgary)
Date
1981
Title
Decision on application by Alberta Products Pipe Line Ltd., 1981 (permit to construct deferred portions of a pipeline - Edmonton to Calgary)
Date
1981
Applicant
Alberta Products Pipe Line Limited
Application Number
810460
810461
810462
810513
Hearing Panel
DeSorcy GJ
Strom NA
Evans RG
Hearing Type
Board
Category
Pipelines
Descriptors
Edmonton area
Pipeline construction permit
Product pipeline
Red Deer area
Coal deposit
Energy development
Land use
NTS 83A
NTS 83H
Pipeline route
Right of way
Route selection
Transportation corridor
Legal References
Pipeline Act S34
Pipeline Act
Notes
Decision 81-34 on application No. 810460, 810461, 810462 and 810513 for segments of pipeline approved under permit 189419 (TP.44-46, R.26 W4M TP.47-48, R.25-26, W4M and TP.50-53, R.23-25, W4M) Board hearing 1981-10-21/22/23 see related ERCB Decisions 80-30 and 81-31
Interveners
City of Edmonton
County of Lacombe No. 14
Daon Development Corporation
Landowners - Alternative Route
Schotte, A.
Town of Lacombe
Approval
Approved
Less detail

Decision 85-39

https://had.aer.ca/link/decision971
Applicant
Alberta Energy Company Limited
Cominco Chemicals and Fertilizers
Application Number
850703
Title
Decision on application by Alberta Energy Company Ltd. and Cominco Chemicals and Fertilizers, 1985 (industrial development permit to manufacture ammonia)
Date
1985
Title
Decision on application by Alberta Energy Company Ltd. and Cominco Chemicals and Fertilizers, 1985 (industrial development permit to manufacture ammonia)
Date
1985
Applicant
Alberta Energy Company Limited
Cominco Chemicals and Fertilizers
Application Number
850703
Hearing Panel
DeSorcy GJ
Bohme VE
Homeniuk TF
Hearing Type
Board
Category
Industrial development permit
Descriptors
Ammonia
Chemical plant
Industrial development permit
Red Deer area
Agricultural land
Air quality
Capitalized cost
Emission
Environmental impact
Hydrogen
Marketing
Natural gas - fuel
Nitrogen
NTS 83A
Plant location
Raw material
Socio-economic effect
Waste water
Water supply
Legal References
Oil and Gas Conservation Act S30
Notes
Decision D85-39 on application No. 850703 for industrial development permit authorizing the use of hydrogen as raw material and natural gas as fuel to produce anhydrous ammonia at a plant to be constructed near Joffre (TP.39, R.22-23, W4M).
Interveners
Chessor, D.
Preserve Agricultural Land
Canadian Fertilizers Ltd.
The Alberta Gas Ethylene Co. Ltd.
Less detail

Decision 86-05

https://had.aer.ca/link/decision808
Applicant
Alberta Energy Company Limited
Application Number
860109
860110
860111
Title
Decision on application by Alberta Energy Company Ltd., 1986 (to construct water effluent, ammonia, and nitrogen pipelines)
Date
1986
Title
Decision on application by Alberta Energy Company Ltd., 1986 (to construct water effluent, ammonia, and nitrogen pipelines)
Date
1986
Applicant
Alberta Energy Company Limited
Application Number
860109
860110
860111
Hearing Panel
DeSorcy GJ
Bohme VE
Homeniuk TF
Hearing Type
Board
Category
Pipelines
Descriptors
Ammonia
Nitrogen
Pipeline construction permit
Waste water
Alberta
Chemical plant
Emergency procedure
Environmental impact
NTS 83A
Pipeline route
Red Deer area
Notes
Decision D86-5 on application No. 860109, APP860110 and APP860111 to construct pipelines 1) to transport water effluent from AEC/Cominco Joffre nitrogen project to the Red Deer River, 2) to transport liquid anhydrous ammonia from same plant to off-site storage near Chigwell, 3) to transport nitrogen from the Union Carbide prentice plant to above plant (TP.38-41, R.25-26, W4M).
Interveners
Friesen, G.
Preserve Agricultural Land
Less detail

Decision 99-10

https://had.aer.ca/link/decision3048
Applicant
TransAlta Utilities Corporation
Application Number
980631
980632
980633
980634
Title
Decision 99-10: TransAlta Utilities Corporation 138-kV Transmission Facilities in the Joffre - Ellis - Gaetz Areas
Date
1999
Title
Decision 99-10: TransAlta Utilities Corporation 138-kV Transmission Facilities in the Joffre - Ellis - Gaetz Areas
Date
1999
Applicant
TransAlta Utilities Corporation
Application Number
980631
980632
980633
980634
Hearing Panel
Bietz BF
Sharp KG
Nichol JR
Hearing Type
Board
Utilities
Category
Transmission line
Descriptors
Electric substation
Joffre area
NTS 83A
Red Deer area
Transmission line
Legal References
Hydro and Electric Energy Act S12
Hydro and Electric Energy Act S14
Hydro and Electric Energy Act S17
Notes
EUB Decision D99-10 on applications by TransAlta: Application 980631 to construct Ellis substation CB 332S, alter existing Union Carbide Prentiss substation CP 276S and re-designate as Prentiss substation CP 276S, construct 138-kV transmission line from Union Carbide Prentiss substation to Ellis substation; Application 980632 to alter existing Joffre substation CP 535S; Application 980633 to construct 138-kV transmission line CP 784L from Joffre to Ellis; Application 980634 to salvage existing 138-kV line CP 756L from Joffre to Gaetz substation and construct double-circuit 138-kV transmission line CP 756L/793L along same right of way and to alter the Gaetz substation CP 87S. The facilities are required to serve plant expansions at both Nova Chemicals Joffre plant site and Union Carbide's Prentiss plant; and some of the facilities would be used to transport electrical energy from Nova's cogeneration plant (currently under construction) into the Alberta Interconnected System for sale to the Power Pool;
Board Hearing (Red Deer): 1999-04-20/21
Approved (980631, 980632, 980633)
Deferred (980634)
Interveners
Transmission Administrator (TA)
Oakley C
NOVA Chemicals Corporation (NOVA)
Bourdon P
Ferris D
Steffan R
Union Carbide Incorporated (Union Carbide)
Cooke M
Moore F
Slaughter R
County of Lacombe (the County)
Sharp M
774L Interveners:
Cameron L
Phillips S
Risser C
756L/793L Interveners:
Bower D
Featherstone D
Morrison P
Morrison S
Munce J
Poettcker J
Solick H
Approval
Approved
Deferred
Less detail

Decision 99-10 Addendum

https://had.aer.ca/link/decision3098
Applicant
TransAlta Utilities Corporation
Application Number
980631
980632
980633
980634
Title
Decision 99-10 Addendum: TransAlta Utilities Corporation 138-kV Transmission Facilities in the Joffre - Ellis - Gaetz Areas
Date
1999
Title
Decision 99-10 Addendum: TransAlta Utilities Corporation 138-kV Transmission Facilities in the Joffre - Ellis - Gaetz Areas
Date
1999
Applicant
TransAlta Utilities Corporation
Application Number
980631
980632
980633
980634
Hearing Panel
Bietz BF
Sharp KG
Nichol JR
Hearing Type
Board
Utilities
Category
Transmission line
Descriptors
Electric substation
Joffre area
NTS 83A
Red Deer area
Route selection
Transmission line
Legal References
Hydro and Electric Energy Act S12
Hydro and Electric Energy Act S14
Hydro and Electric Energy Act S17
Notes
EUB Decision D99-10 Addendum re final approval of Trans Alta Application No. 980634 pending receipt and evaluation of supplemental information respecting the applied for route and alternative routes from the company. Supplemental, technical, environmental (route selection and impacts), and economic information packages were provided to the Board and all interested parties.
Board Hearing (Red Deer): 1999-04-20/21
Interveners
Bower D
Cameron L.
County of Lacombe
Featherstone D
Morrison P
Morrison S
Munce J
Nova Chemicals Corporation
Phillips S
Poettcker J
Risser C
756L/793L Interveners
774L Interveners
Solick H
Transmission Administrator
Union Carbide Incorporated
Less detail

Decision 2005-141

https://had.aer.ca/link/decision4085
Applicant
ATCO Gas North
ATCO Gas and Pipelines Limited
Application Number
1421444
Title
Decision 2005-141: ATCO Gas North disposition of Red Deer Operating Centre
Date
2005
Title
Decision 2005-141: ATCO Gas North disposition of Red Deer Operating Centre
Date
2005
Applicant
ATCO Gas North
ATCO Gas and Pipelines Limited
Application Number
1421444
Hearing Panel
McManus BT
Douglas JI
Miller GJ
Hearing Type
Utilities
Written hearing
Category
Gas rate
Descriptors
Decision D2003 72
Red Deer area
Sale of assets
Legal References
Gas Utilities Act S26
Approval
Approved
Less detail

Decision E77-(p.112)

https://had.aer.ca/link/decision1924
Applicant
Calgary Power Ltd.
Application Number
770325
Title
Examiners report on application by Calgary Power Ltd., 1977 (138 KV transmission lines CP 755L, CP 756L Red Deer - Alberta gas ethylene)
Date
1977
Title
Examiners report on application by Calgary Power Ltd., 1977 (138 KV transmission lines CP 755L, CP 756L Red Deer - Alberta gas ethylene)
Date
1977
Applicant
Calgary Power Ltd.
Application Number
770325
Hearing Panel
Goodman CJ
Strom NA
Webber HJ
Hearing Type
Examiners
Utilities
Category
Transmission line
Descriptors
Electric substation
Joffre area
Red Deer area
Transmission line
Chemical plant
Electric power demand
NTS 83A
Reliability
Route selection
Legal References
Hydro and Electric Energy Act S9
Hydro and Electric Energy Act S11
Hydro and Electric Energy Act S13
Hydro and Electric Energy Act S14
Notes
ERCB Examiners report on application No. 770325 to construct and operate 138 KV transmission lines CP 755L and CP 756L and Alberta gas ethylene substation CP 535S and to make associated alterations to Red Deer substation CP 63S to serve the Alberta gas ethylene Joffre plant (all in TP.37-39, R.25-27, W4M); Examiners' hearing 1977-07-06 and 1978-02-14; permit and licence CP 77-44, CP 77-45, CP 77-46, CP 75-2C and CP 78
Interveners
Carvallis Angus Farms
Nichols, R.
LaGrange, G.
Red Deer Regional Planning Commission
The Alberta Gas Ethylene Company Ltd.
Wadey, L.G.
Reay, H.A.
Bolze, R.H.
Less detail

Decision E78-(p.095)

https://had.aer.ca/link/decision1102
Applicant
Calgary Power Ltd.
Application Number
770325
Title
Examiners report on application by Calgary Power Ltd., 1978 (Red Deer - Alberta gas ethylene, 138 KV transmission lines CP 755L, CP 756L)
Date
1978
Title
Examiners report on application by Calgary Power Ltd., 1978 (Red Deer - Alberta gas ethylene, 138 KV transmission lines CP 755L, CP 756L)
Date
1978
Applicant
Calgary Power Ltd.
Application Number
770325
Hearing Panel
Goodman CJ
Strom NA
Webber HJ
Hearing Type
Examiners
Utilities
Category
Transmission line
Descriptors
Electric substation
Red Deer area
Transmission line
Biological effect
Electromagnetic field
NTS 83A
Route selection
Safety
Legal References
Hydro and Electric Energy Act S9
Hydro and Electric Energy Act S11
Hydro and Electric Energy Act S13
Hydro and Electric Energy Act S14
Notes
ERCB Examiners report on application No. 770325 for permits to construct and licences to operate two 138 KV transmission lines (CP 775L and CP 756L) and age substation (CP 735S) and to make alterations to Red Deer substation (CP 63S) (all in TP.38, R.25-26, W4M); Examiners hearing 1977-07-06, reopened 1978-02-14
Interveners
Carvallis Angus Farms
Puzey, A.M.
Puzey, V.E.
Bolze, F.
Bolze, M.R.O.
Whitehead, A.
Whitehead, D.K.
Whitehead, A.J.
Reay, H.A.
Alderson, R.B.
Group of Six Interveners
Less detail

Decision E80-(p.001)

https://had.aer.ca/link/decision1728
Applicant
Alberta Power Limited
Calgary Power Ltd.
Application Number
790403
790406
790407
790544
Title
Examiners report on application by Alberta Power Ltd. and Calgary Power Ltd., 1980 (240 KV transmission lines Cordel-Sheerness-west Brooks-Milo)
Date
1980
Title
Examiners report on application by Alberta Power Ltd. and Calgary Power Ltd., 1980 (240 KV transmission lines Cordel-Sheerness-west Brooks-Milo)
Date
1980
Applicant
Alberta Power Limited
Calgary Power Ltd.
Application Number
790403
790406
790407
790544
Hearing Panel
Webber HJ
Homeniuk TF
Fox EG
Hearing Type
Examiners
Utilities
Category
Transmission line
Descriptors
Brooks area
Electric substation
Red Deer area
Transmission line
Alberta
Battle River power plant
Electric power supply
Power system interconnection
Right of way
Sheerness power plant
Southern Alberta
NTS 82I
NTS 82P
NTS 83A
Route selection
Legal References
Hydro and Electric Energy Act S9
Hydro and Electric Energy Act S11
Hydro and Electric Energy Act S13
Hydro and Electric Energy Act S14
Notes
ERCB Examiners report on application No. 790407 by Alberta Power to construct and operate a 240 KV single circuit transmission line (AP 259L) from Cordel substation (AP 755S) near the Battle River power plant to the Sheerness power plant and on application No. 790406 to construct and operate 240 KV double circuit transmission line (AP 933L/934L) from Sheerness power plant south to the Red Deer River, and on application No. 790403 by Calgary power to construct and operate 240 KV double circuit transmission line (CP 933L/934L) from Red Deer River to proposed west Brooks substation (CP 28S) and application No. 790544 for 240 KV double circuit transmission line (CP 923L/935L) from west Brooks substation to connect with transmission line CP 924L near Milo; Examiners' hearing 1979-11-27 & 1979-12-04
Interveners
Coulthard, C.H.
Coulthard, G.E.
Group of Nine
Paintearth Protective Society
Palliser Regional Planning Commission
Griffith, G.
Griffith, R.
Hart, W.
Hart, D.
Less detail

19 records – page 1 of 1.