Narrow Results By
Applicant
- APF Energy Inc. 1
- APL Oil and Gas Limited 2
- Aberford Resources Limited 1
- Acclaim Energy Inc. 1
- Alberta Gas Trunk Line Company Limited 1
- Alberta. Dept. of Energy 1
- Altair Oil and Gas Company 1
- Altana Exploration Company 2
- Amerada Minerals Corporation of Canada Limited 1
- Amerada Petroleum Corporation 4
- Amoco Canada Petroleum Company Limited 1
- Anadarko Canada Corporation 1
Decision 74-01
https://had.aer.ca/link/decision2187
- Applicant
- Northwestern Utilities Limited
- Application Number
- 7254
- Title
- Decision on application by Northwestern Utilities Limited, 1974 (application for permit to construct a gas pipe line from Homeglen-Rimbey area to Bonnie Glen area)
- Date
- 1974
- Title
- Decision on application by Northwestern Utilities Limited, 1974 (application for permit to construct a gas pipe line from Homeglen-Rimbey area to Bonnie Glen area)
- Date
- 1974
- Applicant
- Northwestern Utilities Limited
- Application Number
- 7254
- Hearing Panel
- Craig DR
- Millard V
- DeSorcy GJ
- Hearing Type
- Board
- Category
- Pipelines
- Descriptors
- Bonnie Glen field
- Gas pipeline
- Homeglen-Rimbey field
- Pipeline construction permit
- NTS 83B
- NTS 83H
- Legal References
- Pipeline Act Part 2
- Notes
- Decision 74-1 on application No. 7254 to construct a gas line for the transmission of natural gas from Homeglen-Rimbey area to Bonnie Glen area; permit No. 15021
- Interveners
- The Alberta Gas Trunk Line Company Limited
- Alberta and Southern Gas Co. Ltd.
- TransCanada Pipelines Limited
- The City of Edmonton
Decision 74-03
https://had.aer.ca/link/decision2179
- Applicant
- Energy Resources Conservation Board
- Application Number
- 7462
- Title
- Decision 74-03: Annual reserves and maximum rate limitations for oil pools
- Date
- 1974
- Title
- Decision 74-03: Annual reserves and maximum rate limitations for oil pools
- Date
- 1974
- Applicant
- Energy Resources Conservation Board
- Application Number
- 7462
- Hearing Panel
- Strom NA
- Stafford GH
- Webber HJ
- Hearing Type
- Board
- Category
- Oil supply
- Descriptors
- Alderson field
- Alexis field
- Boundary Lake field
- Edson field
- Judy Creek field
- Medicine River field
- MRL
- Oil reserve
- Pembina field
- Pouce Coupe field
- Rainbow field
- Recovery factor
- St. Albert-Big Lake field
- Sturgeon Lake field
- Utikuma Lake field
- NTS 72L
- NTS 83B
- NTS 83F
- NTS 83G
- NTS 83H
- NTS 83J
- NTS 83M
- NTS 83N
- NTS 84B
- NTS 84D
- NTS 84L
- Notes
- Decision 74-3 on proceeding No. 7462 respecting crude oil reserves and maximum rate limitations in selected specified pools; Examiners' hearing 1974-01-28/29/30
Decision 75-03
https://had.aer.ca/link/decision2175
- Applicant
- Great Plains Development Company of Canada Ltd.
- Application Number
- 7976
- Title
- Decision on application by Great Plains Development Company Of Canada Ltd., 1975 (declaration f the Candel Minnehik-Buck Lake gas plant as a common processor and of the Minnehik-Buck Lake gathering system as a common carrier)
- Date
- 1975
- Title
- Decision on application by Great Plains Development Company Of Canada Ltd., 1975 (declaration f the Candel Minnehik-Buck Lake gas plant as a common processor and of the Minnehik-Buck Lake gathering system as a common carrier)
- Date
- 1975
- Application Number
- 7976
- Hearing Panel
- Govier GW
- Craig DR
- Millard V
- Hearing Type
- Board
- Category
- Common carrier
- Common processor
- Descriptors
- Common carrier
- Common processor
- Minnehik-Buck Lake field
- Capacity
- Cost analysis
- Economic analysis
- Gas pipeline
- Gas producing
- Lease drainage
- NTS 83B
- Legal References
- Oil and Gas Conservation Act S49
- Oil and Gas Conservation Act S54
- Notes
- Decision 75-3 on application No. 7976 to declare the Candel Minnehik-Buck Lake gas plant as a common processor and the Minnehik-Buck Lake gathering system as common carrier; Order No. Misc 7505
- Interveners
- CanDel Oil
Decision 75-14
https://had.aer.ca/link/decision2165
- Applicant
- Mobil Oil Canada Ltd.
- Application Number
- 8547
- Title
- Decision on application by Mobil Oil Canada Ltd., 1975 (rateable take of gas from the Ricinus D-3A pool and declaration of the gathering line from Ricinus D-3A pool to the Ram River gas plant and the fuel gas line from the Ricinus gas plant to the Ricinus D-3A pool as common carriers)
- Date
- 1975
- Title
- Decision on application by Mobil Oil Canada Ltd., 1975 (rateable take of gas from the Ricinus D-3A pool and declaration of the gathering line from Ricinus D-3A pool to the Ram River gas plant and the fuel gas line from the Ricinus gas plant to the Ricinus D-3A pool as common carriers)
- Date
- 1975
- Applicant
- Mobil Oil Canada Ltd.
- Application Number
- 8547
- Hearing Panel
- Craig DR
- DeSorcy GJ
- Bohme VE
- Hearing Type
- Board
- Category
- Rateable take
- Common carrier
- Descriptors
- Common carrier
- Rateable take of gas
- Ricinus field
- Fuel gas pipeline
- Gas producing
- Gathering line
- NTS 83B
- Unit operation
- Legal References
- Oil and Gas Conservation Act S35
- Oil and Gas Conservation Act S49
- Notes
- Decision 75-14 on application No. 8547 for rateable take of gas from the Ricinus D-3A pool and for the declaration of the gathering line from the pool to the Ram River gas plant and the fuel gas line from the plant to the pool as common carrier.
- Interveners
- Pacific Petroleums Ltd.
- Chevron Standard Limited
- Consolidated Natural Gas Liimited
- Gulf Oil Canada Limited
Decision 77-02
https://had.aer.ca/link/decision2146
- Applicant
- Calgary Power Ltd.
- Application Number
- 9593
- Title
- Decision on application by Calgary Power Ltd., 1977 (240 KV transmission line facilities in the Sundance-Benalto area)
- Date
- 1977
- Title
- Decision on application by Calgary Power Ltd., 1977 (240 KV transmission line facilities in the Sundance-Benalto area)
- Date
- 1977
- Applicant
- Calgary Power Ltd.
- Application Number
- 9593
- Hearing Panel
- Millard V
- DeSorcy GJ
- Hearing Type
- Board
- Utilities
- Category
- Transmission line
- Descriptors
- Transmission line
- Electric power demand
- Impact assessment
- NTS 83B
- NTS 83G
- Route selection
- Legal References
- Hydro and Electric Energy Act S9
- Hydro and Electric Energy Act S11
- Hydro and Electric Energy Act S13
- Hydro and Electric Energy Act S14
- Notes
- Decision 77-2 on application No. 9593 to construct and operate a 240 KV transmission line (CP 922L) from the Sundance thermal generation station (in TP.52-4 W5M) to the Benalto substation (CP 17S) (TP.38-3. W5M) west of Red Deer.
- Interveners
- Lawson, T.
- Dunkeld Ranching Ltd.
- Cormie Ranch Ltd.
- Rasmussen, E.
- A Group of 118 Parties
- Le Geyt, C.
- Le Geyt, I.
- Jenson, C.A.
- Hourigan,
- Nobels & Sons Ranches
- 5T Simmental Limited
Decision 77-22
https://had.aer.ca/link/decision2126
- Applicant
- Zebra Resources Ltd.
- Application Number
- 770412
- Title
- Decision on application by Zebra Resources Ltd., 1977 (rateable take, common purchaser and common processor of gas produced from the Sylvan Lake Glauconitic A pool)
- Date
- 1977
- Title
- Decision on application by Zebra Resources Ltd., 1977 (rateable take, common purchaser and common processor of gas produced from the Sylvan Lake Glauconitic A pool)
- Date
- 1977
- Applicant
- Zebra Resources Ltd.
- Application Number
- 770412
- Hearing Panel
- Millard V
- Berkowitz N
- DeSorcy GJ
- Hearing Type
- Board
- Descriptors
- Common processor
- Common purchaser
- Rateable take of gas
- Sylvan Lake field
- Equity
- Geologic interpretation
- Glauconitic sandstone
- Lease drainage
- NTS 83B
- Legal References
- Oil and Gas Conservation Act S35
- Oil and Gas Conservation Act S52
- Oil and Gas Conservation Act S54
- Notes
- Decision 77-22 on application No. 770412 for an Order requiring that the production from the Sylvan Lake Glauconitic A pool be distributed in an equitable manner among the wells in the pool and that TCPL be a common purchaser of gas produced from the pool and that Hudson's Bay Oil and Gas Company be declared a common processor of gas produced from the pool.
- Interveners
- Hudson's Bay Oil and Gas company Limited
- Chevron Standard Ltd.
- TransCanada PipeLines Limited
Decision 77-27
https://had.aer.ca/link/decision2121
- Applicant
- Aquitaine Company of Canada Limited
- Amerada Minerals Corporation of Canada Limited
- Application Number
- 770164
- 770340
- 770341
- 770342
- Title
- Decision on application by Aquitaine Company of Canada Ltd. and Amerada Minerals Corporation of Canada Ltd., 1977 (gas processing plant and pipelines in the Stolberg area)
- Date
- 1977
- Title
- Decision on application by Aquitaine Company of Canada Ltd. and Amerada Minerals Corporation of Canada Ltd., 1977 (gas processing plant and pipelines in the Stolberg area)
- Date
- 1977
- Application Number
- 770164
- 770340
- 770341
- 770342
- Hearing Panel
- Millard V
- DeSorcy GJ
- Bohme VE
- Hearing Type
- Board
- Category
- Pipelines
- Descriptors
- Fuel gas pipeline
- Gas pipeline
- Gas processing plant
- Pipeline construction permit
- Stolberg field
- Sour gas
- Conservation
- Economic analysis
- Energy development
- Environmental impact
- Gas reserve
- NTS 83B
- NTS 83C
- Legal References
- Pipeline Act
- Notes
- Decision 77-27 on application No. 770164 by Amerada to construct a sour gas processing plant in LSD 2-8-41-13 (W5) and on application No. 770340 by Aquitaine to construct a pipeline to transport sour gas and on application No. 770341 by Aquitaine to construct a pipeline to transport condensate both from a point in LSD 2-3-41-14 W5 to a point in LSD 11-2-37-10 W4 and on application No. 770342 by Aquitaine to construct a pipeline to transport fuel gas from the Ram River plant (LSD 11-2-37-10 W5) to a dehydration plant in LSD 2-3-41-14 W5; Board hearing 1977-09-20/21
- Interveners
- Mobil Oil Canada Ltd.
- Chevron Standard Limited
- Bearcat Exploration Ltd.
- Cree Lake Mining Ltd.
- The Alberta Gas Trunk Line Company Limited
- Gulf Oil Canada Limited
- BP Exploration Canada Limited
Decision 79-15
https://had.aer.ca/link/decision2081
- Applicant
- Sabine Canada Ltd.
- Application Number
- 790300
- Title
- Decision on application by Sabine Canada Ltd., 1979 (gas processing plant Medicine River field)
- Date
- 1979
- Title
- Decision on application by Sabine Canada Ltd., 1979 (gas processing plant Medicine River field)
- Date
- 1979
- Applicant
- Sabine Canada Ltd.
- Application Number
- 790300
- Hearing Panel
- Dunbar RB
- Dilay JD
- Page CJC
- Hearing Type
- Examiners
- Category
- Gas processing
- Descriptors
- Gas processing plant
- Medicine River field
- Sour gas
- Amine
- Dissolved gas
- Gas conservation
- Gas processing
- Gas producing
- Lease drainage
- NTS 83B
- Pekisko Fm
- Reservoir boundary
- Legal References
- Oil and Gas Conservation Act S38
- Notes
- Decision 79-15 (with Examiners report appended) on application No. 790300 to construct and operate a gas plant in LSD 10-14-39-3 W5M to process raw solution gas to recover sales gas and natural gas liquids.
- Interveners
- Pembina Pipe Line Limited
- Quasar Petroleum Ltd.
- Atco Gas & Oil Ltd.
- Paddon Hughes Development Co. Ltd.
Decision 80-11
https://had.aer.ca/link/decision2028
- Applicant
- Alberta Gas Trunk Line Company Limited
- Application Number
- 800207
- 800248
- Title
- Decision on application by Alberta Gas Trunk Line Company Limited, 1980 (Knight Compressor Station and Edson main pipeline looping)
- Date
- 1980
- Title
- Decision on application by Alberta Gas Trunk Line Company Limited, 1980 (Knight Compressor Station and Edson main pipeline looping)
- Date
- 1980
- Applicant
- Alberta Gas Trunk Line Company Limited
- Application Number
- 800207
- 800248
- Hearing Panel
- Millard V
- Goodman CJ
- Chelmick G
- Hearing Type
- Board
- Category
- Pipelines
- Descriptors
- Compressor station
- Gas pipeline
- Pipeline construction permit
- Capacity
- Expansion
- NTS 83B
- NTS 83C
- NTS 83F
- Legal References
- Pipeline Act
- Notes
- Decision 80-11 on application No. 800207 to construct an addition to AGTL's existing Knight compressor station in section 28-57-17 W5M and on application No. 800248 to construct pipelines to loop the Edson main gas line in 3 sections (Clearwater loop, Nordegg loop & Wolf Lake loop) (TP.38-53, R.9-18, W5M); Board hearing 1980-06-24/25
- Interveners
- Alberta & Southern Gas Co. Ltd.
- Canadian Hunter Exploration Ltd.
- Independent Petroleum Association
- Pan-Alberta Gas Ltd.
- ProGas Limited
- TransCanada Pipelines
Decision 81-02
https://had.aer.ca/link/decision2006
- Applicant
- Dome Petroleum Limited
- Application Number
- 790732
- Title
- Decision on application by Dome Petroleum Limited, 1981 (Enhanced recovery by ethane enriched miscible flood - Caroline Viking A pool)
- Date
- 1981
- Title
- Decision on application by Dome Petroleum Limited, 1981 (Enhanced recovery by ethane enriched miscible flood - Caroline Viking A pool)
- Date
- 1981
- Applicant
- Dome Petroleum Limited
- Application Number
- 790732
- Hearing Panel
- Bray JA
- Keushnig HR
- Stafford GH
- Hearing Type
- Board
- Category
- Enhanced recovery
- Descriptors
- Caroline field
- Enhanced recovery scheme
- Miscible displacement
- Depletion
- Design criteria
- Gas saturation
- Injection pressure
- Monitoring
- NTS 82O
- NTS 83B
- Oil recovery
- Reservoir characteristic
- Reservoir performance
- Sweep efficiency
- Viking Fm
- Legal References
- Oil and Gas Conservation Act S38
- Notes
- Decision 81-2 (with unnumbered Examiners report attached) on application No. 790732 for an ethane enriched miscible gas flood scheme in a portion of the Caroline Viking A pool (TP.33-36, R. 3-7, W5M).
- Interveners
- Amoco Canada Petroleum Company Ltd.
- Hudson's Bay Oil and Gas Company Limited
- Wintershall Oil of Canada Ltd.
Decision 81-04
https://had.aer.ca/link/decision1763
- Applicant
- Suncor Inc.
- Application Number
- 800765
- Title
- Examiners report on application by Suncor Inc., 1981 (compulsory pooling Medicine River field)
- Date
- 1981
- Title
- Examiners report on application by Suncor Inc., 1981 (compulsory pooling Medicine River field)
- Date
- 1981
- Applicant
- Suncor Inc.
- Application Number
- 800765
- Hearing Panel
- Stafford GH
- Mazurek LA
- Stanton PM
- Hearing Type
- Examiners
- Category
- Compulsory pooling
- Descriptors
- Compulsory pooling
- Medicine River field
- Gas producing
- Geologic interpretation
- Jurassic
- NTS 83B
- Legal References
- Oil and Gas Conservation Act S82
- Notes
- ERCB Examiners report E81-4 on application No. 800765 to have all tracts within section 33-38-3 W5M operated as a unit for production of gas from the Jurassic/Detrital zone.
- Interveners
- Bow Valley Exploration
Decision 81-14
https://had.aer.ca/link/decision1994
- Applicant
- Sundance Oil Canada Ltd.
- Application Number
- 800969
- Title
- Decision on application by Sundance Oil Canada Ltd., 1981 (common processor of gas - Westerose south Glauconitic A pool and an undefined Basal Quartz Sandstone pool in the well, Sundance et al Lennox 7-5-45-2)
- Date
- 1981
- Title
- Decision on application by Sundance Oil Canada Ltd., 1981 (common processor of gas - Westerose south Glauconitic A pool and an undefined Basal Quartz Sandstone pool in the well, Sundance et al Lennox 7-5-45-2)
- Date
- 1981
- Applicant
- Sundance Oil Canada Ltd.
- Application Number
- 800969
- Hearing Panel
- Millard V
- Bohme VE
- Webber HJ
- Hearing Type
- Board
- Category
- Common processor
- Descriptors
- Common processor
- Westerose south field
- Basal Quartz Fm
- Capacity
- Gas producing
- Glauconitic sandstone
- NTS 83B
- Legal References
- Energy Resources Conservation Act S31
- Oil and Gas Conservation Act S20
- Oil and Gas Conservation Act S54
- Notes
- Decision 81-14 on application No. 800969 for an Order declaring Gulf Canada a common processor of gas produced from the Westerose south Glauconitic A pool and an undefined Basal Quartz pool in the well Sundance et al Lennox 7-5-45-2 (W5M) (Hoadley pools); Board hearing 1981-03-25/26
- Interveners
- Gulf Canada Resources Inc.
- Amoco Canada Petroleum Company Ltd.
- Hudson's Bay Oil and Gas Company Limited
Decision 81-16
https://had.aer.ca/link/decision1752
- Applicant
- Texaco Canada Resources Ltd.
- Application Number
- 800570
- Title
- Examiners report on application by Texaco Canada Resources Ltd., 1981 (special drilling spacing unit Gilby Jurassic-Rundle C pool)
- Date
- 1981
- Title
- Examiners report on application by Texaco Canada Resources Ltd., 1981 (special drilling spacing unit Gilby Jurassic-Rundle C pool)
- Date
- 1981
- Applicant
- Texaco Canada Resources Ltd.
- Application Number
- 800570
- Hearing Panel
- Webber HJ
- Edgecombe RW
- Langlo CA
- Hearing Type
- Examiners
- Category
- Spacing
- Descriptors
- Drilling spacing unit
- Gilby field
- ID-OG-77-02
- Gas producing
- Geologic interpretation
- NTS 83B
- Penalty relief
- Rundle Gp
- Target area
- Legal References
- Oil and Gas Conservation Regulations S4.020
- Oil and Gas Conservation Regulations S4.030
- Notes
- ERCB Examiners report No. E81-16 on application No. 800570 for special DSU of one section for production of gas from the Rundle group in section 22-40-3, W5M.
- Interveners
- Gulf Canada Resources Inc.
Decision 81-19
https://had.aer.ca/link/decision1747
- Applicant
- Shell Canada Resources Limited
- Application Number
- 810221
- Title
- Examiners report on application by Shell Canada Resources Limited, 1981 (sour multiphase flow line Innisfail area)
- Date
- 1981
- Title
- Examiners report on application by Shell Canada Resources Limited, 1981 (sour multiphase flow line Innisfail area)
- Date
- 1981
- Applicant
- Shell Canada Resources Limited
- Application Number
- 810221
- Hearing Panel
- Bellows LA
- Berndtsson NG
- Remmer WG
- Hearing Type
- Examiners
- Category
- Pipelines
- Descriptors
- Gathering line
- Innisfail area
- Oil pipeline
- Pipeline construction permit
- NTS 83B
- Flowline
- Multiphase flow
- Oil producing
- Oil recovery
- Sour brine
- Sour crude
- Notes
- ERCB Examiners report E81-19 on application No. 810221 to construct pipeline from well in LSD 11-21-35-1 W5M to existing pipeline located in LSD 5-15-35-1 W5M to transport sour multiphase effluent from the 11-21 well.
- Interveners
- Noval, G.S.
Decision 81-21
https://had.aer.ca/link/decision1745
- Applicant
- Calgary Power Ltd.
- Application Number
- 800886
- Title
- Examiners report on application by Calgary Power Ltd., 1981 (Dickson reservoir 240 KV transmission line relocation)
- Date
- 1981
- Title
- Examiners report on application by Calgary Power Ltd., 1981 (Dickson reservoir 240 KV transmission line relocation)
- Date
- 1981
- Applicant
- Calgary Power Ltd.
- Application Number
- 800886
- Hearing Panel
- Homeniuk TF
- Bellows LA
- Allman RJ
- Hearing Type
- Examiners
- Utilities
- Category
- Transmission line
- Descriptors
- Red Deer River valley
- Relocation
- Transmission line
- Dam
- Dickson dam
- Environmental impact
- NTS 83B
- Reservoir
- Route selection
- Legal References
- Hydro and Electric Energy Act S9
- Hydro and Electric Energy Act S11
- Hydro and Electric Energy Act S13
- Hydro and Electric Energy Act S15
- Hydro and Electric Energy Act S17
- Notes
- ERCB Examiners report no.E81-21 on application No. 800886 to relocate three 240 KV transmission circuits (CP 906L, CP 928L and CP 918L) in the Dickson Dam area (TP.35-36, R.2-3 W5M).
- Interveners
- Kure, E.
- Kure, C.
- Kure, D.
- Morck, L.
- Morck, S.
- Morck, A.
- Abolfathi, L.
- Rasmussen, B.
- Rasmussen, G.
- Nielsen, H.
- Stigings, D.
- Stigings, J.
- Smith, J.
- Blain, R.
- Thompson, H.
- Grey, E.
- Grey, B.
- Lohmann, B.
- Lohmann, M.
- Jorgensen, G.
- Jorgensen, H.
- Kelly, L.
- Kelly, B.
- Sharpe, J.E.
Decision 81-22
https://had.aer.ca/link/decision1744
- Applicant
- Canadian Superior Oil Ltd.
- Farries Engineering (1977) Ltd.
- Application Number
- 810260
- Title
- Examiners report on application by Canadian Superior Oil Ltd., 1981 (order declaring common purchasers for gas produced from the Brazeau River Elkton-Shunda A pool)
- Date
- 1981
- Title
- Examiners report on application by Canadian Superior Oil Ltd., 1981 (order declaring common purchasers for gas produced from the Brazeau River Elkton-Shunda A pool)
- Date
- 1981
- Application Number
- 810260
- Hearing Panel
- Warne GA
- Keushnig HR
- Nichol JR
- Hearing Type
- Examiners
- Category
- Common purchaser
- Descriptors
- Brazeau River field
- Common purchaser
- Gas producing
- Gas purchase
- Lease drainage
- Marketing
- NTS 83B
- Reservoir boundary
- Legal References
- Oil and Gas Conservation Act S52
- Notes
- ERCB Examiners report no.E81-22 on application No. 810260 for an Order declaring TransCanada Pipelines Limited and Alberta and Southern Gas Co. Ltd. to be common purchasers of gas from the Brazeau River Elkton-Shunda A pool (TP.43-45, R.11-12, W5M).
- Interveners
- Alberta and Southern Gas Co. Ltd.
- CDC Oil & Gas Limited
Decision 81-31
https://had.aer.ca/link/decision1735
- Applicant
- Hudson's Bay Oil and Gas Company Limited
- Application Number
- 810026
- Title
- Examiners report on application by Hudson's Bay Oil and Gas Company Limited, 1981 (Dickson reservoir secondary oil pipeline relocation)
- Date
- 1981
- Title
- Examiners report on application by Hudson's Bay Oil and Gas Company Limited, 1981 (Dickson reservoir secondary oil pipeline relocation)
- Date
- 1981
- Applicant
- Hudson's Bay Oil and Gas Company Limited
- Application Number
- 810026
- Hearing Panel
- Bellows LA
- Homeniuk TF
- Allman RJ
- Hearing Type
- Examiners
- Category
- Pipelines
- Descriptors
- Oil pipeline
- Pipeline construction permit
- Red Deer River valley
- Relocation
- Dam
- Dickson dam
- NTS 83B
- Reservoir
- Legal References
- Pipeline Act S34
- Notes
- ERCB Examiners report no.E81-31 on application No. 810026 to construct pipeline to replace an existing crude oil and condensate pipeline in the area of the Dickson reservoir (TP.35, R.2, W5M).
Decision 82-02
https://had.aer.ca/link/decision2076
- Applicant
- Aquitaine Company of Canada Limited
- Gulf Canada Resources Inc.
- Nova, an Alberta Corporation
- Application Number
- 810629
- 810630
- 810631
- 810584
- Title
- Decision on application by Aquitaine Company of Canada Ltd., Gulf Canada Resources Inc., Nova, an Alberta Corporation, 1982 (permit to construct pipelines in the Stolberg - Ricinus areas)
- Date
- 1982
- Title
- Decision on application by Aquitaine Company of Canada Ltd., Gulf Canada Resources Inc., Nova, an Alberta Corporation, 1982 (permit to construct pipelines in the Stolberg - Ricinus areas)
- Date
- 1982
- Applicant
- Aquitaine Company of Canada Limited
- Gulf Canada Resources Inc.
- Nova, an Alberta Corporation
- Application Number
- 810629
- 810630
- 810631
- 810584
- Hearing Panel
- DeSorcy GJ
- Goodman CJ
- Strom NA
- Hearing Type
- Board
- Category
- Pipelines
- Descriptors
- Fuel gas pipeline
- Gas pipeline
- Pipeline construction permit
- Ricinus field
- Sour gas
- Stolberg field
- Capacity
- Environmental impact
- ID-79-02
- Gas processing plant
- NTS 83B
- NTS 83C
- NTS 83F
- NTS 83G
- Pipeline design
- Pipeline route
- Route selection
- Legal References
- Pipeline Act
- Notes
- Decision 82-2 on application No. 810629 and No. 810630 by Aquitaine (now Canterra energy) for two sections of pipeline to CARRY sour gas and a line to transport fuel gas and application No. 810631 by Gulf for a sour gas pipeline and application No. 810584 by Nova to add a loop to its existing system (all in TP.36-49, R.8-20, W5M); see Decision 82-15 for related gas plant applications.
- Interveners
- Consolidation Coal Company
- Holt, D.
- Mott, J.R.
- Stelfox, H.
- Hudson's Bay Oil and Gas Company Limited
- Luscar Ltd.
Decision 82-09
https://had.aer.ca/link/decision2069
- Applicant
- Amoco Canada Petroleum Company Limited
- Pembina Pipe Line Limited
- Application Number
- 810514
- 810999
- Title
- Decision on application by Amoco Canada Petroleum Company Ltd. and Pembina Pipe Line Ltd., 1982 (permits to construct pipelines - west Pembina area)
- Date
- 1982
- Title
- Decision on application by Amoco Canada Petroleum Company Ltd. and Pembina Pipe Line Ltd., 1982 (permits to construct pipelines - west Pembina area)
- Date
- 1982
- Application Number
- 810514
- 810999
- Hearing Panel
- DeSorcy GJ
- Goodman CJ
- Morin EJ
- Hearing Type
- Board
- Category
- Pipelines
- Descriptors
- Condensate
- Liquefied petroleum gas
- Oil pipeline
- Pipeline construction permit
- Westpem field
- Enhanced recovery scheme
- LPG injection
- NTS 83B
- NTS 83G
- Petroleum conservation
- Pipeline design
- Legal References
- Pipeline Act
- Notes
- Decision 82-9 on application No. 810514 by Amoco to construct pipeline to transport ethane, propane, butanes, pentanes and pentanes plus from proposed gas plant in LSD 15-10-47-14 W5M and LSD 9-34-47-13 W5M to an existing pipeline in LSD 4-31-48-12 W5M and on application No. 810999 by Pembina to construct pipeline from an existing Chevron gas plant in LSD 11-22-49-12 W5M and a proposed HBOG plant in section 10-47-14 W5M to the existing Pembina system to transport segregated condensate (TP.43-50, R.5-15, W5M).
- Interveners
- Petro-Canada Exploration Inc.
Decision 82-11
https://had.aer.ca/link/decision1136
- Applicant
- Vanguard Petroleums Ltd.
- Application Number
- 810827
- Title
- Examiners report on application by Vanguard Petroleums Ltd., 1982 (quarter section drilling spacing units Lanaway field Cardium formation)
- Date
- 1982
- Title
- Examiners report on application by Vanguard Petroleums Ltd., 1982 (quarter section drilling spacing units Lanaway field Cardium formation)
- Date
- 1982
- Applicant
- Vanguard Petroleums Ltd.
- Application Number
- 810827
- Hearing Panel
- Pow JR
- Purvis RA
- Berndtsson NG
- Hearing Type
- Examiners
- Category
- Spacing
- Descriptors
- Drilling spacing unit
- Lanaway field
- Cardium Fm
- Depletion
- NTS 83B
- Oil producing
- Oil recovery
- Production rate
- Reservoir model
- Target area
- Legal References
- Oil and Gas Conservation Regulations S4.030
- Notes
- ERCB Examiners report E82-11 on application No. 810827 to remove the west half of section 7-36-3 W5M from Order No. SU 405 which designates as one half section drilling spacing unit and establish quarter section drilling spacing units in the west half of section 7 with target areas being LSD 6 & 14 in accordance with Order No. SU 1088 for production of oil from the Cardium FM.
- Interveners
- C&T Resources Ltd.