97 records – page 1 of 5.

Decision 2000-01

https://had.aer.ca/link/decision3141
Applicant
ESBI Alberta Ltd.
Application Number
990005
Title
Decision 2000-01: ESBI Alberta Ltd. 1999/2000 general rate application phase I and phase II
Date
2000
Title
Decision 2000-01: ESBI Alberta Ltd. 1999/2000 general rate application phase I and phase II
Date
2000
Applicant
ESBI Alberta Ltd.
Application Number
990005
Hearing Panel
McManus BT
Berg AJ
MacDonald NW
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Public utility
Electric power rate
Electric power transmission
Rate (cost)
General rate application
Price regulation
Order U99018
Management fee
Legal References
Electric Utilities Act S49
Electric Utilities Act S67
Electric Utilities Deficiency Correction Regulation
Notes
Decision on a general tariff application for approval of revenue requirements for 1999 and 2000 (phase 1) and revised rate design (phase 2)
Decision orders that company refile proposed rates and options, rate riders, and including implementation dates for certain tariffs
Both phases must be refiled after circulation to all affected parties for comments
Board hearing 1999-09-15 & 16 / 2000-09-20 through 24
Approval
Deferred
Less detail

Decision 2000-02

https://had.aer.ca/link/decision3144
Applicant
ATCO Electric Limited
Application Number
980545
Title
Decision 2000-02: ATCO Electric Ltd. 1999/2000 electric tariff application refiling
Date
2000
Title
Decision 2000-02: ATCO Electric Ltd. 1999/2000 electric tariff application refiling
Date
2000
Applicant
ATCO Electric Limited
Application Number
980545
Hearing Panel
MacDonald NW
McManus BT
Berg AJ
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Electric power rate
General rate application
Decision U99099
Decision U99046
Negotiation
Rate (cost)
Notes
General rate application refiling pursuant to decision U99099, based on negotiated settlement agreement reached with its customers (decision U99046).
No Board hearing
Approval
Approved
Less detail

Decision 2000-03

https://had.aer.ca/link/decision3145
Applicant
TransAlta Utilities Corporation
Application Number
980546
Title
Decision 2000-03: TransAlta Utilities Corporation 1999/2000 electric tariff application refiling
Date
2000
Title
Decision 2000-03: TransAlta Utilities Corporation 1999/2000 electric tariff application refiling
Date
2000
Applicant
TransAlta Utilities Corporation
Application Number
980546
Hearing Panel
MacDonald NW
McManus BT
Berg AJ
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Electric power rate
General rate application
Decision U99099
Rate (cost)
Notes
TransAlta Utilities Corporation general rate application refiling pursuant to decision U99099. Corrections made to refilings based on submissions of the intervenors, incorporated into transmission terms and conditions
No Board hearing
Approval
Approved
Less detail

Decision 2000-04

https://had.aer.ca/link/decision3146
Applicant
EPCOR Transmission Inc.
Application Number
980547
Title
Decision 2000-04: EPCOR Transmission Inc. 1999/2000 electric tariff application refiling
Date
2000
Title
Decision 2000-04: EPCOR Transmission Inc. 1999/2000 electric tariff application refiling
Date
2000
Applicant
EPCOR Transmission Inc.
Application Number
980547
Hearing Panel
MacDonald NW
McManus BT
Berg AJ
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Electric power rate
General rate application
Decision U99099
Rate (cost)
Notes
EPCOR Transmission Inc. general rate application refiling pursuant to decision U99099. No intervenor submissions.
No Board hearing
Approval
Approved
Less detail

Decision 2000-05

https://had.aer.ca/link/decision3147
Applicant
EPCOR Transmission Inc.
Application Number
980550
Title
Decision 2000-05: EPCOR Generation Inc. 1999/2000 electric tariff application refiling
Date
2000
Title
Decision 2000-05: EPCOR Generation Inc. 1999/2000 electric tariff application refiling
Date
2000
Applicant
EPCOR Transmission Inc.
Application Number
980550
Hearing Panel
MacDonald NW
McManus BT
Berg AJ
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Electric power rate
General rate application
Decision U99099
Deferral accounting
Rate (cost)
Notes
EPCOR Generation Inc. general rate application refiling pursuant to decision U99099.
No Board hearing
Approval
Approved
Less detail

Decision 2000-09

https://had.aer.ca/link/decision3155
Applicant
Canadian Western Natural Gas Company Limited
Application Number
980413
980421
File 1303-1
File 1304-1
Title
Decision 2000-09 : Canadian Western Natural Gas Company Limited 1997 return on common equity and capital structure and 1998 general rate application phase I
Date
2000
Title
Decision 2000-09 : Canadian Western Natural Gas Company Limited 1997 return on common equity and capital structure and 1998 general rate application phase I
Date
2000
Applicant
Canadian Western Natural Gas Company Limited
Application Number
980413
980421
File 1303-1
File 1304-1
Hearing Panel
Bietz BF
McManus BT
Miller GJ
Hearing Type
Board
Utilities
Category
Gas rate
Descriptors
Rate (cost)
Deregulation
Forecasting
Interest
Negotiation
Gas utility
Order U98162
Decision U99070
Rate of return
General rate application
Notes
EUB Decision D2000-09 on applications no. 980413 and 980421 by Canadian Western Natural Gas Limited to for a 1998 general rate application and to review 1997 matters retrospectively; Board hearing addressed 1997 matters as if they had been filed prior to year ie on a forecast basis rather than using actual amounts
Approval
Approved
Less detail

Decision 2000-11

https://had.aer.ca/link/decision3148
Applicant
TransAlta Utilities Corporation
Application Number
RE95081
Title
Decision 2000-11: TransAlta Utilities Corporation 1996 general rate application phase II refiling
Date
2000
Title
Decision 2000-11: TransAlta Utilities Corporation 1996 general rate application phase II refiling
Date
2000
Applicant
TransAlta Utilities Corporation
Application Number
RE95081
Hearing Panel
Prince JP
McManus BT
Jainarine H
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Electric power rate
Cost of service
Rate (cost)
Decision U99035
Decision U99105
General rate application
Notes
Decision on a general rate application phase 2 refiling pursuant to decision U99035 where the Board considers new rates reflecting cost characteristics os the restructured industry
Board will review applications for review and variance after refiling decision made
Board orders second refiling
Approval
Deferred upon refiling
Less detail

Decision 2000-12

https://had.aer.ca/link/decision3154
Applicant
TransAlta Utilities Corporation
Application Number
RE95081
Title
Decision 2000-12: TransAlta Utilities Corporation 1996 general rate application phase II - second refiling
Date
2000
Title
Decision 2000-12: TransAlta Utilities Corporation 1996 general rate application phase II - second refiling
Date
2000
Applicant
TransAlta Utilities Corporation
Application Number
RE95081
Hearing Panel
Prince JP
McManus BT
Jainarine H
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Electric power rate
Cost of service
Rate (cost)
Decision D2000-11
Decision U99035
Decision U99105
General rate application
Notes
Decision on a general rate application phase 2 second refiling pursuant to decision D2000-11; rates effective March 1, 2000
Approval
Approved
Less detail

Decision 2000-15

https://had.aer.ca/link/decision3165
Applicant
ATCO Electric Limited
Application Number
RE95080
Title
Decision 2000-15: ATCO Electric Ltd. 1996 electric tariff application refiling - phase II second refiling
Date
2000
Title
Decision 2000-15: ATCO Electric Ltd. 1996 electric tariff application refiling - phase II second refiling
Date
2000
Applicant
ATCO Electric Limited
Application Number
RE95080
Hearing Panel
McManus BT
Berg AJ
Jainarine H
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Electric power rate
Cost of service
Refiling
Decision U99034
Decision U97065
Decision D2000-13
Rate (cost)
General rate application phase II
Notes
General rate application phase 2 refiling pursuant to decision 2000-13 directions 2 and 4
Includes attached rate schedules and terms and conditions
No Board hearing
Approval
Approved
Less detail

Decision 2000-16

https://had.aer.ca/link/decision3224
Applicant
Canadian Western Natural Gas Company Limited
Application Number
980413
File 1303-3
Title
Decision 2000-16 : Canadian Western Natural Gas Company Limited 1998 general rate application phase II
Date
2000
Title
Decision 2000-16 : Canadian Western Natural Gas Company Limited 1998 general rate application phase II
Date
2000
Applicant
Canadian Western Natural Gas Company Limited
Application Number
980413
File 1303-3
Hearing Panel
Bietz BF
McManus BT
Miller GJ
Hearing Type
Board
Utilities
Category
Gas rate
Descriptors
General rate application phase II
Class of service
Cost of service
Rate (cost)
Notes
EUB Decision D2000-16 on application no. 980413 by Canadian Western Natural Gas Limited (now ATCO Gas and Pipelines Ltd.) for phase 2 of its 1998 general rate application; decision addresses the appropriate allocation of costs, rate design, and individual tolls and tariffs.
Board hearing 1999-08-03 to 1999-08-13
Interveners
Alberta Irrigation Projects Association
Alberta Ratepayers' Association
Borden Ladner Gervais LLP
Bryan & Company
Burnett, Duckworth & Palmer LLP
City of Calgary
City of Edmonton
Committee for Residential Utilities
Consumers Coalition of Alberta
Edmonton Federation of Community Leagues
Epcor Energy Services (Alberta) Inc.
Federation of Albert Gas Co-ops
Gas Alberta Inc.
Municipal Intervenors
North Core Committee
Public Institutional Consumers Association
Saddle Lake First Nation
Samson First Nation
Sproule Associates Limited
Top Grade Solutions Inc.
Town of Redwater
Unryn & Associates Ltd.
Wachowich & Company
Ackroyd AO
Brander RB
Bronconnier D
Bryan JA
Chase HB
Day
Ferguson W
Floyd C
Fryett B
Graves J
Johnson H
Johnson S
Kernahan M
Kerr A
Kuchelyma D
Large EJ
Marriott TD
Mathews D
McKenzie NJ
Moses F
Mundle G (Rev.)
Ogertschnig H
Piasta
Pyke R
Retnanandan R
Roth DB
Sherk M
Stewart N
Storcer A
Unryn JH
Wachowich JA
Williamson HD
Wolf RE
Approval
Deferred upon refiling
Less detail

Decision 2000-24

https://had.aer.ca/link/decision3199
Applicant
ESBI Alberta Ltd.
Application Number
990005
Title
Decision 2000-24: ESBI Alberta Ltd. 1999/2000 tariff application refiling - part A : invitation to bid on credits (IBOC)
Date
2000
Title
Decision 2000-24: ESBI Alberta Ltd. 1999/2000 tariff application refiling - part A : invitation to bid on credits (IBOC)
Date
2000
Applicant
ESBI Alberta Ltd.
Application Number
990005
Hearing Panel
McManus BT
Berg AJ
MacDonald NW
Hearing Type
Utilities
Category
Electric power rate
Descriptors
Public utility
Electric power rate
Electric power transmission
Rate (cost)
General rate application
Refiling
Decision D2000-01
Notes
Decision on tariff application refiling with respect to its proposed Invitation to Bid on Credits process
Approval
Deferred upon refiling
Less detail

Decision 2000-25

https://had.aer.ca/link/decision3200
Applicant
ESBI Alberta Ltd.
Application Number
990005
Title
Decision 2000-25: ESBI Alberta Ltd. 1999/2000 tariff application refiling - part B : tariff and terms and conditions of service
Date
2000
Title
Decision 2000-25: ESBI Alberta Ltd. 1999/2000 tariff application refiling - part B : tariff and terms and conditions of service
Date
2000
Applicant
ESBI Alberta Ltd.
Application Number
990005
Hearing Panel
McManus BT
Berg AJ
MacDonald NW
Hearing Type
Utilities
Category
Electric power rate
Descriptors
Cost of service
Public utility
Electric power rate
Electric power transmission
General rate application
Refiling
Decision D2000-01
Notes
Decision on tariff application refiling respecting tariff and terms and conditions
Approval
Deferred
Less detail

Decision 2000-27

https://had.aer.ca/link/decision3214
Applicant
ESBI Alberta Ltd.
Application Number
990005
Title
Decision 2000-27: ESBI Alberta Ltd. 1999/2000 tariff application refiling - part D : line losses calculation methodology
Date
2000
Title
Decision 2000-27: ESBI Alberta Ltd. 1999/2000 tariff application refiling - part D : line losses calculation methodology
Date
2000
Applicant
ESBI Alberta Ltd.
Application Number
990005
Hearing Panel
McManus BT
Berg AJ
MacDonald NW
Hearing Type
Utilities
Category
Electric power rate
Descriptors
Public utility
Electric power rate
Electric power generation
General rate application
Refiling
Supply (economics)
Decision D2000-01
Notes
Decision on tariff application refiling respecting lines losses calculation methodology
Less detail

Decision 2000-35

https://had.aer.ca/link/decision3215
Applicant
Canadian Western Natural Gas Company Limited
Application Number
980413
980421
File 1303-1
File 1304-1
Title
Decision 2000-35 : Canadian Western Natural Gas Company Limited 1997 return on common equity and capital structure and 1998 general rate application compliance filing
Date
2000
Title
Decision 2000-35 : Canadian Western Natural Gas Company Limited 1997 return on common equity and capital structure and 1998 general rate application compliance filing
Date
2000
Applicant
Canadian Western Natural Gas Company Limited
Application Number
980413
980421
File 1303-1
File 1304-1
Hearing Panel
Bietz BF
McManus BT
Miller GJ
Hearing Type
Board
Utilities
Category
Gas rate
Descriptors
Decision D2000-09
Refiling
General rate application
Notes
EUB Decision D2000-35 on applications no. 980413 and 980421 by Canadian Western Natural Gas Limited pursuant to compliance on directions by the Board outlined in decision D2000-09
Approval
Deferred upon refiling
Less detail

Decision 2000-37

https://had.aer.ca/link/decision3226
Applicant
ESBI Alberta Ltd.
Application Number
2000135
Title
Decision 2000-37: ESBI Alberta Ltd. 2001 general tariff application phase I and II, pre-hearing conference
Date
2000
Title
Decision 2000-37: ESBI Alberta Ltd. 2001 general tariff application phase I and II, pre-hearing conference
Date
2000
Applicant
ESBI Alberta Ltd.
Application Number
2000135
Hearing Panel
Berg AJ
MacDonald NW
Lock RG
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Interim rate
Electric power rate
Electric power transmission
General rate application phase I
General rate application phase II
Notes
Decision on a general tariff application by ESBI Alberta Ltd. to cancel interim hearing
Approval
Approved
Less detail

Decision 2000-45

https://had.aer.ca/link/decision3316
Applicant
Canadian Western Natural Gas Company Limited
Application Number
980413
980421
File 1303-1
File 1304-1
Title
Decision 2000-45 : Canadian Western Natural Gas Company Limited 1997 return on common equity and capital structure and 1998 general rate application c- second filing
Date
2000
Title
Decision 2000-45 : Canadian Western Natural Gas Company Limited 1997 return on common equity and capital structure and 1998 general rate application c- second filing
Date
2000
Applicant
Canadian Western Natural Gas Company Limited
Application Number
980413
980421
File 1303-1
File 1304-1
Hearing Panel
Bietz BF
McManus BT
Miller GJ
Hearing Type
Board
Utilities
Category
Gas rate
Descriptors
Decision D2000-09
Decision D2000-35
Refiling
General rate application
Notes
EUB Decision D2000-45 on applications no. 980413 and 980421 by Canadian Western Natural Gas Limited pursuant to second refiling on compliance on directions by the Board outlined in decision D2000-35
Approval
Approved
Less detail

Decision 2000-54

https://had.aer.ca/link/decision3284
Applicant
Canadian Western Natural Gas Company Limited
Application Number
980413
File 1303-3
Title
Decision 2000-54 : Canadian Western Natural Gas Company Limited 1998 general rate application phase II, approval of 1998 refund and further discussion on 1998 rates
Date
2000
Title
Decision 2000-54 : Canadian Western Natural Gas Company Limited 1998 general rate application phase II, approval of 1998 refund and further discussion on 1998 rates
Date
2000
Applicant
Canadian Western Natural Gas Company Limited
Application Number
980413
File 1303-3
Hearing Panel
Bietz BF
McManus BT
Miller GJ
Hearing Type
Board
Utilities
Category
Gas rate
Descriptors
General rate application phase II
Decision D2000-09
Decision D2000-16
Rate (cost)
Notes
EUB Decision D2000-54 on application no. 980413 by Canadian Western Natural Gas Limited (now ATCO Gas and Pipelines Ltd.) for phase 2 of its 1998 general rate application; decision approves 1998 refund to customers beginning in August 2000.
Approval
Approved
Less detail

Decision 2000-57

https://had.aer.ca/link/decision3280
Applicant
ESBI Alberta Ltd.
Application Number
2000135
Title
Decision 2000-57: ESBI Alberta Ltd. 2001 general tariff application, part B: interim tariff decision
Date
2000
Title
Decision 2000-57: ESBI Alberta Ltd. 2001 general tariff application, part B: interim tariff decision
Date
2000
Applicant
ESBI Alberta Ltd.
Application Number
2000135
Hearing Panel
MacDonald NW
Berg AJ
Lock RG
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Interim rate
Electric power rate
Electric power transmission
General rate application phase I
General rate application phase II
Terms and conditions
Decision D2000-37
Decision D2000-46
Notes
Decision on a interim general rate application and interim terms and conditions
No Board hearing
Approval
Approved
Less detail

Decision 2000-61

https://had.aer.ca/link/decision3278
Applicant
Canadian Western Natural Gas Company Limited
Application Number
980413
File 1303-3
Title
Decision 2000-61 : Canadian Western Natural Gas Company Limited 1998 general rate application phase II, compliance filing
Date
2000
Title
Decision 2000-61 : Canadian Western Natural Gas Company Limited 1998 general rate application phase II, compliance filing
Date
2000
Applicant
Canadian Western Natural Gas Company Limited
Application Number
980413
File 1303-3
Hearing Panel
Bietz BF
McManus BT
Miller GJ
Hearing Type
Board
Utilities
Category
Gas rate
Descriptors
General rate application phase II
Class of service
Cost of service
Rate (cost)
Notes
EUB Decision D2000-61 on application no. 980413 by Canadian Western Natural Gas Limited (now ATCO Gas and Pipelines Ltd.) for phase 2 of its 1998 general rate application; decision addresses compliance filing with respect to final rates effective September 1, 2000 and outstanding refund
No Board hearing
Approval
Approved
Less detail

Decision 2000-82

https://had.aer.ca/link/decision3314
Applicant
Canadian Western Natural Gas Company Limited
Application Number
990208
file no. 1305-5
Title
Decision 2000-82 : Canadian Western Natural Gas Company Limited request to withdraw the 1999 general rate application and assessment of need for a 2000 general rate application
Date
2000
Title
Decision 2000-82 : Canadian Western Natural Gas Company Limited request to withdraw the 1999 general rate application and assessment of need for a 2000 general rate application
Date
2000
Applicant
Canadian Western Natural Gas Company Limited
Application Number
990208
file no. 1305-5
Hearing Panel
Bietz BF
McManus BT
Miller GJ
Hearing Type
Utilities
Category
Gas pricing
Descriptors
Gas price
General rate application
Refiling
Legal References
Gas Utilities Act S22
Gas Utilities Act S25
Public Utilities Board Act
Notes
EUB Decision D2000-82 on an application by Canadian Western Natural Gas to withdraw its 1999 GRA which has been held in abeyance for the majority of the time that has passed since the filing date. The company also requested leave from filing a 2000 GRA. 1998 Final rates approved for January 1, 1999 to August 31, 2000
Interveners
City of Calgary
Consumer's Coalition of Alberta
Federation of Alberta Gas Co-ops Ltd.
Gas Alberta Inc.
Municipal Intervenors
Public Institutional Consumers of Alberta
Approval
Approved
Conditions
The company shall refund 1999 and 2000 amounts to customers arising from application of 1998 rates for the period of January 1, 1999 to August 31, 2000; a one-time refund totaling 23.7 million .
Less detail

97 records – page 1 of 5.