3 records – page 1 of 1.

Decision 57-02

https://had.aer.ca/link/decision2418
Applicant
Saskatchewan Power Corporation
Application Number
000079 (HEARING)
Title
Decision on application by Saskatchewan Power Corporation, 1957 (removal of gas produced from the Medicine Hat field)
Date
1957
Title
Decision on application by Saskatchewan Power Corporation, 1957 (removal of gas produced from the Medicine Hat field)
Date
1957
Applicant
Saskatchewan Power Corporation
Application Number
000079 (HEARING)
Hearing Panel
McKinnon IN
Goodall DP
Govier GW
Hearing Type
Board
Category
Gas removal
Descriptors
Gas removal
Alberta
Etzikom field
Gas demand
Gas reserve
Gas supply
Medicine Hat area
Legal References
Gas Resources Preservation Act 1956
Notes
ERCB Report 57-2 on Hearing No. 79 on an application by Saskatchewan Power to remove gas from the Medicine Hat and Etzikom fields; Board hearing 1956-12-11 and 1957-01-15/16/17/18
Less detail

Decision 2005-98

https://had.aer.ca/link/decision4046
Applicant
ECNG Limited Partnership
PremStar Energy Canada Limited Partnership
Application Number
1372775
1372777
Title
Decision 2005-098: ECNG Limited Partnership and PremStar Energy Canada Limited Partnership gas code of conduct regulation compliance plans
Date
2005
Title
Decision 2005-098: ECNG Limited Partnership and PremStar Energy Canada Limited Partnership gas code of conduct regulation compliance plans
Date
2005
Applicant
ECNG Limited Partnership
PremStar Energy Canada Limited Partnership
Application Number
1372775
1372777
Hearing Panel
McManus BT
Douglas JI
McGee TM
Hearing Type
Utilities
Written hearing
Category
Gas utility
Descriptors
Code of conduct
Contract
Gas supply
Gas transmission industry
Gas utility
Legal References
Gas Utilities Act
Gas Utilities Code of Conduct Regulation S30
Approval
Approved
Less detail

Decision E66-(p.322)

https://had.aer.ca/link/decision1451
Applicant
Energy Resources Conservation Board
Application Number
3093
Title
Examiners report on the operation of Decalta Dempsey Calmar Leduc battery 2 for alleged contraventions of the requirements of section 40a of the Drilling and Production Regulations
Date
1966
Title
Examiners report on the operation of Decalta Dempsey Calmar Leduc battery 2 for alleged contraventions of the requirements of section 40a of the Drilling and Production Regulations
Date
1966
Applicant
Energy Resources Conservation Board
Application Number
3093
Hearing Panel
Bohme VE
Macleod NA
Hearing Type
Examiners
Category
Inquiry
Descriptors
Inquiry
Battery
Gas supply
Flare
Legal References
Drilling and Production Regulation S40
Notes
ERCB Examiners report on application No. 3093 regarding an inquiry into the operation of Decalta Dempsey Calmar Leduc battery 2.
Less detail