6 records – page 1 of 1.

Application 1008234

https://had.aer.ca/link/application39075
Applicant
Shell Chemicals Canada Ltd.
Summary
Requesting approval to construct a new ethylene glycols plant located in the Fort Saskatchewan area.
Decision/Order/Approval
IDP 98-2
Decision 98-3
Date Registered
May 30, 1997
Applicant
Shell Chemicals Canada Ltd.
Summary
Requesting approval to construct a new ethylene glycols plant located in the Fort Saskatchewan area.
Category
Gas
Descriptors
Industrial development permit
Ethylene glycol
Area
Fort Saskatchewan
Date Registered
May 30, 1997
Decision/Order/Approval
IDP 98-2
Decision 98-3
Hearing Location
Fort Saskatchewan Public Library, Rooms 1 and 2, 10011 - 102 Street, Fort Saskatchewan, Alberta
Re-Scheduled Location now at: Ortona Room, Royal Canadian Legion, 9964 - 93 Avenue, Fort Saskatchewan, Alberta
Interventions
9
Exhibits
17
Special Report
Environmental Impact Assessment Main Report and Appendices, by Amberg Corp., dated 199705
Less detail

Decision 76-B

https://had.aer.ca/link/decision2386
Applicant
Dow Chemical of Canada Limited
Application Number
9118
Title
Decision on application by Dow Chemical Of Canada Limited, 1976 (For industrial development permit under section 42 of the Oil and Gas Conservation Act)
Date
1976
Title
Decision on application by Dow Chemical Of Canada Limited, 1976 (For industrial development permit under section 42 of the Oil and Gas Conservation Act)
Date
1976
Applicant
Dow Chemical of Canada Limited
Application Number
9118
Hearing Panel
Millard V
Berkowitz N
DeSorcy GJ
Hearing Type
Board
Category
Industrial development permit
Descriptors
Chemical plant
Ethylene glycol
Ethylene oxide
Fort Saskatchewan area
Industrial development permit
Alberta
Natural gas - fuel
NTS 83H
Legal References
Oil and Gas Conservation Act S42
Notes
ERCB report 76-B on application No. 9118 for an IDP to use gas as fuel to produce ethylene glycol and ethylene oxide in plant to be constructed at Fort Saskatchewan (permit DCC 76-2).
Less detail

Decision 81-24

https://had.aer.ca/link/decision1984
Applicant
Union Carbide Canada Limited
Application Number
800889
Title
Decision on application by Union Carbide Canada Limited, 1981 (industrial development permit to manufacture ethylene glycol)
Date
1981
Title
Decision on application by Union Carbide Canada Limited, 1981 (industrial development permit to manufacture ethylene glycol)
Date
1981
Applicant
Union Carbide Canada Limited
Application Number
800889
Hearing Panel
DeSorcy GJ
Bohme VE
Goodman CJ
McAndrews CJ
Hearing Type
Board
Category
Industrial development permit
Descriptors
Chemical plant
Ethylene glycol
Industrial development permit
Prentiss area
Agricultural land
Conflict
Demand (economics)
Economic analysis
Energy development
Environmental impact
Ethylene - raw material
Land use
Locating
Marketing
Natural gas - fuel
NTS 83A
Plant location
Socio-economic effect
Supply (economics)
Water supply
Legal References
Oil and Gas Conservation Act S42
Notes
Decision 81-24 on application No. 800889 to use ethylene as feedstock and gas as fuel to produce ethylene glycol in a new plant to be constructed near Prentiss (section 30-39-25 W4M); Board hearing 1981-04-14/15/16/20/21
Interveners
Preserve Agricultural Land
Craigievar Farms
Unifarm
Christian Farmers Federation
Red Deer Board of the Alberta Institute of Agrologists
Superior Sod Farms
F.E.M. Farms Ltd.
Carlyle, R.J.
Friesen, G.
Hainsworth, J.W.
Russell, M.
Russell, E.
Low, D.C.
Chessor, D.
Sather, A.P.
Red Deer River Regional Planning Commission
Buffalo Lake Regional Resources Project
Alix Chamber of Commerce
Village of Mirror
Alberta Energy Company Ltd.
Esso Chemical Canada
Du Pont Canada Inc.
Alberta Gas Ethylene Company Ltd.
NOVA, AN ALBERTA CORPORATION
Shell Canada Limited
Less detail

Decision 83-03

https://had.aer.ca/link/decision2392
Applicant
Union Carbide Canada Limited
Application Number
820934
820935
Title
Decision on application by Union Carbide Canada Limited, 1983 (applications for permits to construct ethylene glycol pipelines from Prentiss to Blackfalds)
Date
1983
Title
Decision on application by Union Carbide Canada Limited, 1983 (applications for permits to construct ethylene glycol pipelines from Prentiss to Blackfalds)
Date
1983
Applicant
Union Carbide Canada Limited
Application Number
820934
820935
Hearing Panel
DeSorcy GJ
Bohme VE
Goodman CJ
Hearing Type
Board
Category
Pipelines
Descriptors
Blackfalds area
Ethylene glycol
Pipeline construction permit
Prentiss area
Product pipeline
Agricultural land
Environmental impact
Land reclamation
Locating
NTS 83A
Petrochemical industry
Pipeline route
Railroad
Route selection
Safety
Socio-economic effect
Terminal facility
Transportation cost
Legal References
Pipeline Regulation S2
Pipeline Act
Notes
Decision No. D83-3 on application No. 820934 to construct 18.5 km of 114.3 MM outside diameter stainless steel pipeline for transmission of polyester grade ethylene glycol from plant in LSD 14-30-39-25 W4M to proposed Blackfalds railcar loading terminal in LSD 11-26-39-27 W4M and on application No. 820935 to construct 18.5 km of 168.3 MM outside diameter carbon steel pipeline to transmit antifreeze grade ethylene glycol from plant to terminal; Board hearing 1983-02-15/16
Interveners
Preserve Agricultural Land
Blackfalds Mobile Park Ltd.
Holland, J.
Holland, Mrs.J.
Holland, L.
Holland, Mrs. L.
CP Rail
Town of Blackfalds
Blackfalds and District Chamber of Commerce
Johnstone, D.
Less detail

Decision 90-20

https://had.aer.ca/link/decision67
Applicant
Electric Furnace Products Company Limited
Union Carbide Canada Limited
Application Number
891316
900177
901025
Title
Decision 90-20 : Electric Furnace Products Company Limited and Union Carbide Canada Limited : Application to amend existing industrial permit UC81-1.
Date
1990
Title
Decision 90-20 : Electric Furnace Products Company Limited and Union Carbide Canada Limited : Application to amend existing industrial permit UC81-1.
Date
1990
Applicant
Electric Furnace Products Company Limited
Union Carbide Canada Limited
Application Number
891316
900177
901025
Hearing Panel
DeSorcy GJ
Prince JP
Morin EJ
Hearing Type
Board
Category
Industrial development permit
Descriptors
Blackfalds area
Chemical plant
Ethylene glycol
Industrial development permit
Pipeline construction permit
Product pipeline
Prentiss area
Emission
Environmental impact
Ethylene
Expansion
Natural gas - fuel
NTS 83A
Petrochemical industry
Route selection
Legal References
Oil and Gas Conservation Act S30
Pipeline Act Part 4
Notes
Decision D90-20 on application No. 891316 to amend the existing industrial development permit no.UC 81-1 by increasing the approved quantity of ethylene glycol produced at its plant near Prentiss, section 30-39-25 W4M, from 264.5 to 366.0 Kilotonnes per year; on application No. 900177 for an industrial development permit authorizing the use of ethylene as feedstock and natural gas as fuel, over a permit term of 20 years, to manufacture ethylene glycol at an expansion of the existing Prentiss plant; and on application No. 901025 to construct 18 km of 168.3 MM outside diameter pipeline for the purpose of transporting ethylene glycol from its proposed Prentiss plant expansion to its existing Blackfalds rail car loading facility, section 11-26-39-27 W4M; Board hearing held 1990-11-05/06
Interveners
Pocock R.N.
Blackfalds Mobile Park Ltd.
Location
##-30-039-25W4
11-26-039-27W4
Less detail

Decision 98-03

https://had.aer.ca/link/decision2909
Applicant
Shell Chemicals Canada Ltd.
Application Number
1008234
Title
Decision 98-03 : Shell Chemicals Canada Ltd.: Application for an industrial development permit for a new ethylene glycols plant, Fort Saskatchewan area
Date
1998
Title
Decision 98-03 : Shell Chemicals Canada Ltd.: Application for an industrial development permit for a new ethylene glycols plant, Fort Saskatchewan area
Date
1998
Applicant
Shell Chemicals Canada Ltd.
Application Number
1008234
Hearing Panel
Mink FJ
Miller GJ
Bruni MJ
Hearing Type
Board
Category
Industrial development permit
Descriptors
Ethylene glycol
Air pollution
Chemical plant
Emergency procedure
Energy conservation - industrial
Environmental impact
Ethylene - raw material
Fort Saskatchewan area
Industrial development permit
Land use
Natural gas - raw material
Petroleum product
Regional planning
Safety
Socio-economic effect
NTS 83H
Notes
EUB decision D98-03 on application no. 1008234 for an industrial development permit respecting a new ethylene glycols facility in Strathcona County at Section 32, Twp 55 Rg 21 W4M and the south half of Section 5 Twp 56 Rg 21 W4M. The IDP application requested authorization to use ethylene feedstock and natural gas as fuel in the production of monoethylene glycol, diethylene glycol, and triethylene glycol
Interveners
Strathcona County
City of Fort Saskatchewan
Dzurny AM
Demeule NE
Schotte E
Samoil K
Anez VM
Approval
Approved
Location
##-32-055-21W4
##-05-056-21W4
Less detail

6 records – page 1 of 1.