Narrow Results By
Decision 75-07
https://had.aer.ca/link/decision2172
- Applicant
- Calgary Power Ltd.
- Application Number
- 7869
- 7823
- 7913
- Title
- Decision on application by Calgary Power Ltd., 1975 (transmission and substation facilities stony plain - Devon project)
- Date
- 1975
- Title
- Decision on application by Calgary Power Ltd., 1975 (transmission and substation facilities stony plain - Devon project)
- Date
- 1975
- Applicant
- Calgary Power Ltd.
- Application Number
- 7869
- 7823
- 7913
- Hearing Panel
- Millard V
- Strong JI
- DeSorcy GJ
- Hearing Type
- Board
- Utilities
- Category
- Transmission line
- Descriptors
- Edmonton area
- Electric substation
- Stony Plain area
- Transmission line
- Environmental impact
- Locating
- NTS 83H
- Route selection
- Legal References
- Hydro and Electric Energy Act S9
- Hydro and Electric Energy Act S11
- Hydro and Electric Energy Act S13
- Hydro and Electric Energy Act S17
- Notes
- Decision 75-7 on application No. 7869, No. 7823 and to upgrade existing transmission and substation facilities in the area between Stony Plain and Devon, west of Edmonton.
- Interveners
- Goertz, R.
- Halton-Grove REalty
- Gray, D.S.K.
- Estate of Elizabeth Bauer
- Baron, H.
- Weitzel, W.
- Edmonton Regional Planning Council
- Sigma Lands
- Owners-Section 14-51-26-W4
- Kapty, A.
- Berretti, M
- County of Parkland No. 31
- McLean, W.
- McLean, M.
- QCTV
- Devon Nurseries
Decision 75-10
https://had.aer.ca/link/decision2169
- Applicant
- City of Edmonton
- Edmonton Power
- Application Number
- 8149
- Title
- Decision on application by City of Edmonton, 1975 (Lambton substation and 240 KV transmission line)
- Date
- 1975
- Title
- Decision on application by City of Edmonton, 1975 (Lambton substation and 240 KV transmission line)
- Date
- 1975
- Applicant
- City of Edmonton
- Edmonton Power
- Application Number
- 8149
- Hearing Panel
- Millard V
- Berkowitz N
- Goodman CJ
- Hearing Type
- Board
- Utilities
- Category
- Transmission line
- Descriptors
- Edmonton area
- Electric substation
- Transmission line
- Electric power demand
- Environmental impact
- Locating
- NTS 83H
- Route selection
- Legal References
- Hydro and Electric Energy Act S9
- Hydro and Electric Energy Act S10
- Hydro and Electric Energy Act S11
- Hydro and Electric Energy Act S14
- Notes
- Decision 75-10 on application No. 8149 to construct and operate a double-circuit 240-KV transmission line and substation to supply the southeast Edmonton area.
- Interveners
- Beckwith Farms (1966) Ltd.
- Capital Management Ltd.
- Ross, D.K.
- Ross, Mrs. D.K.
- Calgary Power
Decision 75-11
https://had.aer.ca/link/decision2168
- Applicant
- Calgary Power Ltd.
- Application Number
- 8224
- Title
- Decision on application by Calgary Power Ltd., 1975 (construction and modification of transmission lines and substations near Lake Wabamun)
- Date
- 1975
- Title
- Decision on application by Calgary Power Ltd., 1975 (construction and modification of transmission lines and substations near Lake Wabamun)
- Date
- 1975
- Applicant
- Calgary Power Ltd.
- Application Number
- 8224
- Hearing Panel
- Millard V
- Berkowitz N
- DeSorcy GJ
- Hearing Type
- Board
- Utilities
- Category
- Transmission line
- Descriptors
- Electric substation
- Lake Wabamun
- Transmission line
- Electric power demand
- NTS 83G
- Route selection
- Sundance power plant
- Wabamun power plant
- Legal References
- Hydro and Electric Energy Act S9
- Hydro and Electric Energy Act S11
- Hydro and Electric Energy Act S17
- Notes
- Decision 75-11 on application No. 8224 to construct and modify transmission line and substation facilities in the vicinity of the Sundance and Wabamun power plants.
- Interveners
- Henkel, N.
Decision 76-13
https://had.aer.ca/link/decision2151
- Applicant
- Edmonton Power
- Application Number
- 9188
- Title
- Decision on application by Edmonton Power, 1976 (transmission line of 240 KV and Jasper Substation)
- Date
- 1976
- Title
- Decision on application by Edmonton Power, 1976 (transmission line of 240 KV and Jasper Substation)
- Date
- 1976
- Applicant
- Edmonton Power
- Application Number
- 9188
- Hearing Panel
- Millard V
- Berkowitz N
- DeSorcy GJ
- Hearing Type
- Board
- Utilities
- Category
- Transmission line
- Descriptors
- Edmonton area
- Electric substation
- Transmission line
- Electric power demand
- Environmental impact
- NTS 83H
- Route selection
- Legal References
- Hydro and Electric Energy Act S9
- Hydro and Electric Energy Act S10
- Hydro and Electric Energy Act S11
- Hydro and Electric Energy Act S14
- Notes
- Decision 76-13 on application No. 9188 to construct and operate a 240/72-KV substation and a 240 KV double circuit transmission line to serve the west Edmonton area.
- Interveners
- Calgary Power Ltd.
- Famous Players Limited
- Triple Five Corporation and Northern Trading Co. Ltd.
- A Group of Eight Parties
- Triple Five Corporation and a Group of Thirteen Parties
Decision 77-12
https://had.aer.ca/link/decision2136
- Applicant
- Alberta Power Limited
- Application Number
- 770171
- Title
- Decision on application by Alberta Power Ltd., 1977 (144 kv transmission line from Lloydminster to Metiskow)
- Date
- 1977
- Title
- Decision on application by Alberta Power Ltd., 1977 (144 kv transmission line from Lloydminster to Metiskow)
- Date
- 1977
- Applicant
- Alberta Power Limited
- Application Number
- 770171
- Hearing Panel
- Craig DR
- DeSorcy GJ
- Goodman CJ
- Hearing Type
- Board
- Utilities
- Category
- Transmission line
- Descriptors
- Electric substation
- Lloydminster area
- Transmission line
- Electric power demand
- Electric power supply
- Forecasting
- NTS 73D
- NTS 73E
- Reliability
- Route selection
- Legal References
- Hydro and Electric Energy Act S9
- Hydro and Electric Energy Act S10
- Hydro and Electric Energy Act S11
- Hydro and Electric Energy Act S14
- Notes
- Decision 77-12 on application No. 770171 to construct and operate a 144 KV transmission line from the Battle River north to Lloydminster (TP.45-50, R.1-2, W4M) and to connect the line to the Calgary power system and for a substation at Lloydminster; see also Decision 77-17 for other portion of line from Battle River to Metiskow
- Interveners
- Calgary Power Ltd.
- Ranger, C.A.
Decision 80-05
https://had.aer.ca/link/decision2034
- Applicant
- Calgary Power Ltd.
- Application Number
- 790504
- Title
- Decision on application by Calgary Power Ltd., 1980 (240 KV transmission line in the Entwhistle-Whitecourt area)
- Date
- 1980
- Title
- Decision on application by Calgary Power Ltd., 1980 (240 KV transmission line in the Entwhistle-Whitecourt area)
- Date
- 1980
- Applicant
- Calgary Power Ltd.
- Application Number
- 790504
- Hearing Panel
- Berkowitz N
- Goodman CJ
- Warne GA
- Hearing Type
- Board
- Utilities
- Category
- Transmission line
- Descriptors
- Electric substation
- Transmission line
- Whitecourt area
- Agricultural land
- Electric power demand
- Environmental impact
- Locating
- NTS 83G
- NTS 83J
- Legal References
- Hydro and Electric Energy Act S9
- Hydro and Electric Energy Act S10
- Hydro and Electric Energy Act S11
- Hydro and Electric Energy Act S13
- Hydro and Electric Energy Act S14
- Notes
- Decision 80-5 on application No. 790504 for permits to construct and licences to operate a 240 KV transmission line designated as CP 919L from point near Entwhistle to Whitecourt (TP.53-59, R.6-12, W5M); Board hearing 1980-02-05/06 see also related Decision 78-17
- Interveners
- Alberta Power Limited
- Lenko, P.S.
- Lenko, Mrs.
- Shumborski, R.
- Shumborski, Mrs.
- Farmers' Power Line Association et al Kurt Preugschas
- Renlim Resources
- Kobel, K.
- Quinnell, G.D.
- Town of Whitecourt
- Miller, R.E.
- Berget, J.L.
- Berget. Mrs.
Decision 80-22
https://had.aer.ca/link/decision2017
- Applicant
- Energy Resources Conservation Board
- Application Number
- 800369
- Title
- Decision on application by Tebb (Mr. A.C. Tebb), 1980 (138 KV substation - Airdrie area)
- Date
- 1980
- Title
- Decision on application by Tebb (Mr. A.C. Tebb), 1980 (138 KV substation - Airdrie area)
- Date
- 1980
- Applicant
- Energy Resources Conservation Board
- Application Number
- 800369
- Hearing Panel
- DeSorcy GJ
- Bohme VE
- Bray JA
- Hearing Type
- Board
- Utilities
- Category
- Electric power
- Legal References
- Hydro and Electric Energy Act S13
- Notes
- Decision 80-22 on application No. 800369 by Mr. A.C. Tebb to relocate the Calgary power Ltd. east Airdrie substation CP 199S from its presently approved location in section 14-27-29 W4M to either of 2 locations in the east Airdrie industrial park; Board hearing 1980-09-03/04
- Interveners
- Tebb, A.C.
- Calgary Power Ltd.
- G.I.C. Industries Ltd.
- Woodland Properties Ltd.
- Burnco Industries Ltd.
- Don Beddoes Construction ltd.
- Comanche Drilling Ltd.
- Hamilton, H.A.
Decision 80-A
https://had.aer.ca/link/decision2328
- Applicant
- Calgary Power Ltd.
- Application Number
- 780363
- 780589
- Title
- Decision on application by Calgary Power Ltd., 1980 500 KV transmission lines, Keephills - Ellerslie
- Date
- 1980
- Title
- Decision on application by Calgary Power Ltd., 1980 500 KV transmission lines, Keephills - Ellerslie
- Date
- 1980
- Applicant
- Calgary Power Ltd.
- Application Number
- 780363
- 780589
- Hearing Type
- Utilities
- Category
- Transmission line
- Descriptors
- Edmonton area
- Electric substation
- Ellerslie area
- High voltage
- Lake Wabamun
- Transmission line
- Biological effect
- Electric field
- Electric power
- Demand (economics)
- Health
- Locating
- NTS 83G
- NTS 83H
- Route selection
- Safety
- Legal References
- Hydro and Electric Energy Act S9
- Hydro and Electric Energy Act S11
- Hydro and Electric Energy Act S13
- Hydro and Electric Energy Act S14
- Hydro and Electric Energy Act S17
- Notes
- ERCB report 80-A on application No. 780363 and No. 780589 for permits to construct and operate two 500 KV transmission lines between Keephills generating station in Wabamun Lake area and proposed Ellerslie substation south of Edmonton (TP.50-52, R.23 W4M to R.5 W5M); Board hearing 1979-02-06 thru 1979-03-14 see also ERCB report 81-D for supplement to this Decision
Decision 81-10
https://had.aer.ca/link/decision1757
- Applicant
- Calgary Power Ltd.
- Application Number
- 810159
- Title
- Examiners report on application by Calgary Power Ltd., 1981 (138 KV transmission line east Airdrie - Turbo)
- Date
- 1981
- Title
- Examiners report on application by Calgary Power Ltd., 1981 (138 KV transmission line east Airdrie - Turbo)
- Date
- 1981
- Applicant
- Calgary Power Ltd.
- Application Number
- 810159
- Hearing Panel
- Bray JA
- Fox EG
- Remmer WG
- Hearing Type
- Examiners
- Utilities
- Category
- Transmission line
- Descriptors
- Airdrie area
- Electric substation
- Transmission line
- Electric power demand
- Gas processing plant
- Land value
- NTS 82P
- Oil refinery
- Route selection
- Legal References
- Hydro and Electric Energy Act S9
- Hydro and Electric Energy Act S11
- Hydro and Electric Energy Act S14
- Hydro and Electric Energy Act S15
- Notes
- ERCB Examiners report No. E81-10 on application No. 810159 to construct and operate a 138 KV line (No. CP 752L) from east Airdrie substation (No. CP 199S) to proposed Turbo substation (No. CP 391S) (TP.25-27, R.28-29, W4M).
- Interveners
- Town of Airdrie
- Matlock, J.E.
- Comanche Drilling Ltd.
- Turbo Resources Limited
- Goerlitz, A.
- DeWaal, H.
- Tebb, C.
- Armada Builders Ltd.
- Qualico Developments
Decision 81-11
https://had.aer.ca/link/decision1756
- Applicant
- Calgary Power Ltd.
- Application Number
- 800503
- Title
- Examiners report on application by Calgary Power Ltd., 1981 (138 KV transmission line Vauxhall - Taber)
- Date
- 1981
- Title
- Examiners report on application by Calgary Power Ltd., 1981 (138 KV transmission line Vauxhall - Taber)
- Date
- 1981
- Applicant
- Calgary Power Ltd.
- Application Number
- 800503
- Hearing Panel
- Bellows LA
- Homeniuk TF
- Miller KF
- Hearing Type
- Examiners
- Utilities
- Category
- Transmission line
- Descriptors
- Brooks area
- Electric substation
- Taber area
- Transmission line
- Electric power demand
- Environmental impact
- Health
- Locating
- NTS 82H
- NTS 82I
- Route selection
- Safety
- Legal References
- Hydro and Electric Energy Act S9
- Hydro and Electric Energy Act S11
- Hydro and Electric Energy Act S13
- Hydro and Electric Energy Act S14
- Hydro and Electric Energy Act S17
- Notes
- ERCB Examiners report no.E81-11 on application No. 800503 to construct and operate a 138 KV transmission line between west Brooks substation CP 28S and Taber substation CP 83S and for approvals for Vauxhall substation CP158S (TP.10-13, R.16 W4M).
- Interveners
- Poynton, R.L.
- 214807 Holdings Ltd.
- Rivers Cattle Ltd.
- Town of Vauxhall
Decision 81-13
https://had.aer.ca/link/decision1754
- Applicant
- Calgary Power Ltd.
- Application Number
- 810089
- Title
- Examiners report on application by Calgary Power Ltd., 1981 (138 KV transmission line Janet-Strathmore and 138/25 KV Strathmore substation)
- Date
- 1981
- Title
- Examiners report on application by Calgary Power Ltd., 1981 (138 KV transmission line Janet-Strathmore and 138/25 KV Strathmore substation)
- Date
- 1981
- Applicant
- Calgary Power Ltd.
- Application Number
- 810089
- Hearing Panel
- Homeniuk TF
- Dilay JD
- Miller KF
- Hearing Type
- Examiners
- Utilities
- Category
- Transmission line
- Descriptors
- Electric substation
- Strathmore area
- Transmission line
- Electric power demand
- Locating
- NTS 82I
- NTS 82P
- Reliability
- Route selection
- Legal References
- Hydro and Electric Energy Act S9
- Hydro and Electric Energy Act S11
- Hydro and Electric Energy Act S13
- Hydro and Electric Energy Act S14
- Hydro and Electric Energy Act S15
- Notes
- ERCB Examiners report no.E81-13 on application No. 810089 to construct and operate a 138 KV transmission line CP 765L from existing Janet substation CP74S to proposed 138/25 KV substation CP 151S adjacent to Town of Strathmore (TP.23-24, R.25-28, W4M).
- Interveners
- McClain, D.M.
- McClain, N.
- Donair Limited
- Knight, J.
- 5K Cattle Co. Ltd.
Decision 81-17
https://had.aer.ca/link/decision1751
- Applicant
- Alberta Power Limited
- Application Number
- 800961
- Title
- Examiners report on application by Alberta Power Ltd., 1981 (144 KV transmission line AP 285L Sheerness - Bullpound - Wintering Hills phase 2 Michichi Creek)
- Date
- 1981
- Title
- Examiners report on application by Alberta Power Ltd., 1981 (144 KV transmission line AP 285L Sheerness - Bullpound - Wintering Hills phase 2 Michichi Creek)
- Date
- 1981
- Applicant
- Alberta Power Limited
- Application Number
- 800961
- Hearing Panel
- Mink FJ
- Antonio HA
- Wilson JF
- Hearing Type
- Examiners
- Utilities
- Category
- Transmission line
- Descriptors
- Drumheller area
- Electric substation
- Transmission line
- Agricultural land
- Irrigation
- Locating
- NTS 72M
- NTS 82P
- Route selection
- Legal References
- Hydro and Electric Energy Act S9
- Hydro and Electric Energy Act S11
- Hydro and Electric Energy Act S14
- Notes
- ERCB Examiners report no.E81-17 on application No. 800961 to construct and operate a 144 KV transmission connecting the Sheerness power plant to the Bullpound and Wintering Hills substations, and connecting Wintering Hills substation to existing 144 KV line AP 285L, and connecting north end of existing line AP 285L to proposed substation in Michichi Creek area (TP.25-29, R.13-20, W4M).
- Interveners
- Sundance Oil Canada Limited
- The Ranchers
- Russell, C.
Decision 81-33
https://had.aer.ca/link/decision1734
- Applicant
- TransAlta Utilities Corporation
- Application Number
- 810586
- Title
- Examiners report on application by TransAlta Utilities Corporation, 1981 (138 KV substation and transmission line Bruderheim area)
- Date
- 1981
- Title
- Examiners report on application by TransAlta Utilities Corporation, 1981 (138 KV substation and transmission line Bruderheim area)
- Date
- 1981
- Applicant
- TransAlta Utilities Corporation
- Application Number
- 810586
- Hearing Panel
- Homeniuk TF
- Dilay JD
- Morin EJ
- Hearing Type
- Examiners
- Utilities
- Category
- Transmission line
- Descriptors
- Bruderheim area
- Electric substation
- Fort Saskatchewan area
- Transmission line
- Electric power demand
- Environmental impact
- Land use
- Locating
- NTS 83H
- Oil refinery
- Route selection
- Legal References
- Hydro and Electric Energy Act S9
- Hydro and Electric Energy Act S11
- Hydro and Electric Energy Act S13
- Hydro and Electric Energy Act S14
- Hydro and Electric Energy Act S15
- Notes
- ERCB Examiners report no.E81-33 on application No. 810586 to construct and operate a 138 KV transmission line from a point on existing transmission line (CP 706L) to a proposed 138/25 KV substation to be located east of the Town of Bruderheim (TP.55-56, R.20-221, W4M).
- Interveners
- Prokopczak, L.
- Roloff, R.
- Roloff, M.
- Laird, B.
- Hennig, D.
- Maschmeyer, D.
- Lukawesky, O.
- Paul, D.
- Paul, M.
- Paul, A.
Decision 82-01
https://had.aer.ca/link/decision1087
- Applicant
- TransAlta Utilities Corporation
- Application Number
- 810705
- Title
- Examiners report on application by TransAlta Utilities Corporation, 1982, (240 KV double circuit transmission line, Entwistle to Edson and Bickerdike substation)
- Date
- 1982
- Title
- Examiners report on application by TransAlta Utilities Corporation, 1982, (240 KV double circuit transmission line, Entwistle to Edson and Bickerdike substation)
- Date
- 1982
- Applicant
- TransAlta Utilities Corporation
- Application Number
- 810705
- Hearing Panel
- Homeniuk TF
- Antonio HA
- Moloney JK
- Hearing Type
- Examiners
- Utilities
- Category
- Transmission line
- Descriptors
- Edson area
- Electric substation
- Hinton area
- Transmission line
- Electric power demand
- Locating
- NTS 83F
- NTS 83G
- Route selection
- Legal References
- Hydro and Electric Energy Act S12
- Hydro and Electric Energy Act S14
- Hydro and Electric Energy Act S16
- Hydro and Electric Energy Act S17
- Hydro and Electric Energy Act S18
- Notes
- Examiners report E82-01 on application No. 810705 to construct & operate a 240 KV double circuit transmission line from section 20-52-7 W5M south of Entwhistle to a proposed substation near Edson.
- Interveners
- Dionne, C.L.
- Tufty, R.A.
- Quarrie, N.
- Schaning, H.B.
- Leteta, A.
Decision 82-07
https://had.aer.ca/link/decision1139
- Applicant
- TransAlta Utilities Corporation
- Application Number
- 810776
- Title
- Examiners report on application by TransAlta Utilities Corporation, 1982 (138/69-KV transmission line 578L and Redwater substation 171S)
- Date
- 1982
- Title
- Examiners report on application by TransAlta Utilities Corporation, 1982 (138/69-KV transmission line 578L and Redwater substation 171S)
- Date
- 1982
- Applicant
- TransAlta Utilities Corporation
- Application Number
- 810776
- Hearing Panel
- Paterson RG
- Yu JNG
- Remmer WG
- Hearing Type
- Examiners
- Utilities
- Category
- Transmission line
- Descriptors
- Electric substation
- Redwater area
- Transmission line
- Capacity
- Electric power demand
- Expansion
- NTS 83H
- Reliability
- Route selection
- Legal References
- Hydro and Electric Energy Act S12
- Hydro and Electric Energy Act S14
- Hydro and Electric Energy Act S16
- Hydro and Electric Energy Act S17
- Hydro and Electric Energy Act S20
- Notes
- ERCB Examiners report E82-7 on application No. 810776 to construct and operate 1.6 km of 138-KV transmission line to be designated as 578L from the existing Redwater substation 171S to the existing transmission line 78L in the NE quarter of section 18-57-21 W4M.
- Interveners
- Lasner Construction Co. Ltd.
Decision 82-08
https://had.aer.ca/link/decision1138
- Applicant
- TransAlta Utilities Corporation
- Application Number
- 811025
- Title
- Examiners report on application by TransAlta Utilities Corporation, 1982 (138-KV transmission line CP 172AL Taber-Conrad)
- Date
- 1982
- Title
- Examiners report on application by TransAlta Utilities Corporation, 1982 (138-KV transmission line CP 172AL Taber-Conrad)
- Date
- 1982
- Applicant
- TransAlta Utilities Corporation
- Application Number
- 811025
- Hearing Panel
- Bellows LA
- Yu JNG
- Mazurek LA
- Hearing Type
- Examiners
- Utilities
- Category
- Transmission line
- Descriptors
- Conrad area
- Electric substation
- Taber area
- Transmission line
- Electric power demand
- Environmental impact
- Locating
- NTS 82H
- Route selection
- Legal References
- Hydro and Electric Energy Act S12
- Hydro and Electric Energy Act S14
- Hydro and Electric Energy Act S16
- Hydro and Electric Energy Act S17
- Hydro and Electric Energy Act S18
- Notes
- ERCB Examiners report E82-8 on application No. 811025 to construct and operate a 138-KV transmission, CP 172AL, from existing transmission line CP 172L to proposed Conrad substation (TP.6-10, R.15-16, W4M).
- Interveners
- Shaw, B.R.
- Leahy, G.
Decision 82-14
https://had.aer.ca/link/decision2064
- Applicant
- Alberta Power Limited
- TransAlta Utilities Corporation
- Application Number
- 810608
- 810733
- Title
- Decision on application by Alberta Power Ltd. and Transalta Utilities Corporation, 1982 (240 kv transmission line facilities in the Louise Creek - Sagitawah area)
- Date
- 1982
- Title
- Decision on application by Alberta Power Ltd. and Transalta Utilities Corporation, 1982 (240 kv transmission line facilities in the Louise Creek - Sagitawah area)
- Date
- 1982
- Application Number
- 810608
- 810733
- Hearing Panel
- Goodman CJ
- Morin EJ
- Brushett ER
- Hearing Type
- Board
- Utilities
- Category
- Transmission line
- Descriptors
- Electric substation
- Swan Hills area
- Transmission line
- Electric power demand
- Environmental impact
- Land use
- NTS 83J
- Right of way
- Route selection
- Legal References
- Hydro and Electric Energy Act S12
- Hydro and Electric Energy Act S14
- Hydro and Electric Energy Act S16
- Hydro and Electric Energy Act S17
- Notes
- Decision 82-14 on application No. 810608 by Alberta Power to construct & operate a 240-KV double circuit transmission line AP938L/939L to connect with Alberta Power's line at service area boundary and run south to existing Sagitawah substation CP 77S (TP.59-65, R.10-12, W5M).
- Interveners
- TransAlta Utilities Corporation
- Esso Resources Limited
- Federated Pipelines
Decision 82-17
https://had.aer.ca/link/decision1131
- Applicant
- TransAlta Utilities Corporation
- Application Number
- 820437
- Title
- Examiners report on application by TransAlta Utilities Corporation, 1982 (138-KV substation and transmission line Prentiss-Joffre area)
- Date
- 1982
- Title
- Examiners report on application by TransAlta Utilities Corporation, 1982 (138-KV substation and transmission line Prentiss-Joffre area)
- Date
- 1982
- Applicant
- TransAlta Utilities Corporation
- Application Number
- 820437
- Hearing Panel
- Homeniuk TF
- Fox EG
- Remmer WG
- Hearing Type
- Examiners
- Utilities
- Category
- Transmission line
- Descriptors
- Electric substation
- Prentiss area
- Transmission line
- Chemical plant
- Electric power demand
- Land use
- Locating
- NTS 83A
- Route selection
- Legal References
- Hydro and Electric Energy Act S12
- Hydro and Electric Energy Act S14
- Hydro and Electric Energy Act S16
- Hydro and Electric Energy Act S17
- Hydro and Electric Energy Act S18
- Notes
- ERCB Examiners report E82-17 on application No. 820437 to construct and operate a double circuit 138-KV transmission line from a point on existing transmission line No. CP 756L near the Alberta gas ethylene plant near Joffre to proposed substation at the Union Carbide plant (TP.38-39, R.25-26, W4M).
- Interveners
- Union Carbide Canada Limited
- Superior Sod Farm Ltd.
Decision 82-19
https://had.aer.ca/link/decision1129
- Applicant
- TransAlta Utilities Corporation
- Application Number
- 820378
- Title
- Examiners report on application by TransAlta Utilities Corporation, 1982 (138-KV transmission line WETASKIWIN-Pigeon Lake)
- Date
- 1982
- Title
- Examiners report on application by TransAlta Utilities Corporation, 1982 (138-KV transmission line WETASKIWIN-Pigeon Lake)
- Date
- 1982
- Applicant
- TransAlta Utilities Corporation
- Application Number
- 820378
- Hearing Panel
- Antonio HA
- Berndtsson NG
- Wilson JF
- Hearing Type
- Examiners
- Utilities
- Category
- Transmission line
- Descriptors
- Electric substation
- Pigeon Lake area
- Transmission line
- Wetaskiwin area
- Bonnie Glen field
- Electric power demand
- Environmental impact
- Gas processing plant
- NTS 83A
- NTS 83H
- Route selection
- Legal References
- Hydro and Electric Energy Act S12
- Hydro and Electric Energy Act S14
- Hydro and Electric Energy Act S16
- Hydro and Electric Energy Act S17
- Hydro and Electric Energy Act S18
- Notes
- ERCB Examiners report E82-19 on application No. 820378 to construct and operate a 138-KV transmission line from existing line 80L to existing Pigeon Lake substation (TP.46-47, R.24-28, W4M).
- Interveners
- Jaburek, H.V.
- Hartwig, G.
Decision 82-20
https://had.aer.ca/link/decision1128
- Applicant
- Alberta Power Limited
- Application Number
- 820247
- Title
- Examiners report on application by Alberta Power Ltd., 1982 (144-KV transmission line Clairemont Lake-Friedenstal)
- Date
- 1982
- Title
- Examiners report on application by Alberta Power Ltd., 1982 (144-KV transmission line Clairemont Lake-Friedenstal)
- Date
- 1982
- Applicant
- Alberta Power Limited
- Application Number
- 820247
- Hearing Panel
- Pow JR
- Yu JNG
- Allman RJ
- Hearing Type
- Examiners
- Utilities
- Category
- Transmission line
- Descriptors
- Electric substation
- Grande Prairie area
- Transmission line
- Electric power demand
- Environmental impact
- Failure
- Locating
- Noise (sound)
- NTS 83M
- NTS 84D
- Reliability
- Route selection
- Site survey
- Legal References
- Hydro and Electric Energy Act S12
- Hydro and Electric Energy Act S14
- Hydro and Electric Energy Act S16
- Hydro and Electric Energy Act S17
- Hydro and Electric Energy Act S20
- Notes
- ERCB Examiners report E82-20 on application No. 820247 to construct & operate a substation at Clairmont Lake near Grande Prairie and 144-KV transmission line from proposed substation at Fairview, and an addition to existing Rycroft substation (TP.72-82, R.1-5, W6M).
- Interveners
- Woronuk, D.
- The Village of Rycroft
- Municipal District of Spirit River