29 records – page 1 of 2.

Decision 75-06

https://had.aer.ca/link/decision2173
Applicant
City of Medicine Hat
Application Number
8337
Title
Decision on application by City of Medicine Hat, 1975 (additional generating capacity at the City of Medicine Hat)
Date
1975
Title
Decision on application by City of Medicine Hat, 1975 (additional generating capacity at the City of Medicine Hat)
Date
1975
Applicant
City of Medicine Hat
Application Number
8337
Hearing Panel
Govier GW
DeSorcy GJ
Hearing Type
Board
Utilities
Category
Electric power
Descriptors
Electric power project
Medicine Hat area
Power system interconnection
Electric power demand
Electric power supply
Electric utility
Gas turbine
NTS 72E
Planning
Southeast Alberta
Legal References
Hydro and Electric Energy Act S7
Hydro and Electric Energy Act S14
Notes
Decision 75-6 and supplement on application No. 8337 to install and operate a 15-MW gas turbine and to connect the unit to its electric system; Board meeting 1975-02-06
Interveners
Calgary Power
Alberta Power
Edmonton Power
Electric Utility Planning Council
Less detail

Decision 75-P

https://had.aer.ca/link/decision2352
Applicant
Energy Resources Conservation Board
Application Number
8379
Title
Generation and supply of electric energy in the south-east area of Alberta
Date
1975
Title
Generation and supply of electric energy in the south-east area of Alberta
Date
1975
Applicant
Energy Resources Conservation Board
Application Number
8379
Hearing Panel
Govier GW
DeSorcy GJ
Goodman CJ
Hearing Type
Board
Utilities
Category
Electric power
Descriptors
Electric power demand
Electric power distribution
Electric power generation
Electric power supply
Electric power transmission
Transmission line
Economic forecasting
Forecasting
NTS 72E
NTS 72L
NTS 82H
NTS 82I
Planning
Southern Alberta
Notes
ERCB report 75-P on proceeding No. 8379 to consider the development and operation of facilities for the area of Alberta for a 15-YR period starting in January 1975; Board hearing 1975-06-03/04
Less detail

Decision 76-G

https://had.aer.ca/link/decision2381
Applicant
Dow Chemical of Canada Limited
Application Number
9222
Title
Decision on application by Dow Chemical Of Canada Limited, 1976 (power plant at Fort Saskatchewan)
Date
1976
Title
Decision on application by Dow Chemical Of Canada Limited, 1976 (power plant at Fort Saskatchewan)
Date
1976
Applicant
Dow Chemical of Canada Limited
Application Number
9222
Hearing Panel
Millard V
Berkowitz N
DeSorcy GJ
Hearing Type
Board
Utilities
Category
Electric power
Descriptors
Electric power project
Fort Saskatchewan area
Chemical plant
Electric power demand
Electric power supply
Environmental impact
Industrial plant
NTS 83H
Legal References
Hydro and Electric Energy Act S7
Hydro and Electric Energy Act S14
Notes
ERCB Report 76-G on application 9222 to construct and operate a 140 mw power plant at its Fort Saskatchewan chemical processing complex (in TP.55, R.22, W4M) and to connect the power plant to Calgary Power's transmission system; See also Report 76-I for decision on use of gas as fuel to increase production of chlorine and sodium hydroxide
Less detail

Decision 77-12

https://had.aer.ca/link/decision2136
Applicant
Alberta Power Limited
Application Number
770171
Title
Decision on application by Alberta Power Ltd., 1977 (144 kv transmission line from Lloydminster to Metiskow)
Date
1977
Title
Decision on application by Alberta Power Ltd., 1977 (144 kv transmission line from Lloydminster to Metiskow)
Date
1977
Applicant
Alberta Power Limited
Application Number
770171
Hearing Panel
Craig DR
DeSorcy GJ
Goodman CJ
Hearing Type
Board
Utilities
Category
Transmission line
Descriptors
Electric substation
Lloydminster area
Transmission line
Electric power demand
Electric power supply
Forecasting
NTS 73D
NTS 73E
Reliability
Route selection
Legal References
Hydro and Electric Energy Act S9
Hydro and Electric Energy Act S10
Hydro and Electric Energy Act S11
Hydro and Electric Energy Act S14
Notes
Decision 77-12 on application No. 770171 to construct and operate a 144 KV transmission line from the Battle River north to Lloydminster (TP.45-50, R.1-2, W4M) and to connect the line to the Calgary power system and for a substation at Lloydminster; see also Decision 77-17 for other portion of line from Battle River to Metiskow
Interveners
Calgary Power Ltd.
Ranger, C.A.
Less detail

Decision 77-21

https://had.aer.ca/link/decision2127
Applicant
Calgary Power Ltd.
Application Number
770118
Title
Decision on application by Calgary Power Ltd., 1977 (240 KV transmission line facilities in the Red Deer Calgary area)
Date
1977
Title
Decision on application by Calgary Power Ltd., 1977 (240 KV transmission line facilities in the Red Deer Calgary area)
Date
1977
Applicant
Calgary Power Ltd.
Application Number
770118
Hearing Panel
Millard V
Berkowitz N
Bohme VE
Hearing Type
Board
Utilities
Category
Transmission line
Descriptors
Calgary area
Red Deer area
Transmission line
Agricultural land
Capacity
Electric power demand
Electric power supply
Health
NTS 82P
NTS 83A
Right of way
Route selection
Safety
Legal References
Hydro and Electric Energy Act S9
Hydro and Electric Energy Act S11
Hydro and Electric Energy Act S13
Hydro and Electric Energy Act S14
Notes
Decision 77-21 on application No. 770118 to construct and operate a 240 KV transmission line from the Red Deer substation (CP 63S) to a location 23.4 km north of the Janet substation (CP 74S).
Interveners
A Group of 35 Parties
Sackett, K.
Radau, F.
Latimer, M.E.
Bagrie, D.W.
Osterman, Mrs.
Less detail

Decision 80-B

https://had.aer.ca/link/decision2327
Applicant
Calgary Power Ltd.
Application Number
790693
Title
Decision on application by Calgary Power Ltd., 1980 Keephills Power Plant expansion
Date
1980
Title
Decision on application by Calgary Power Ltd., 1980 Keephills Power Plant expansion
Date
1980
Applicant
Calgary Power Ltd.
Application Number
790693
Hearing Panel
Berkowitz N
Goodman CJ
Thiessen HW
Hearing Type
Board
Utilities
Category
Electric power
Descriptors
Electric power project
Genesee power plant
Keephills power project
Thermal power plant
Benefit cost analysis
Capacity
Coal - fuel
Comparison
Electric power demand
Electric power supply
Expansion
NTS 83G
Legal References
Hydro and Electric Energy Act S7
Hydro and Electric Energy Act S14
Notes
ERCB Report 80-B on application No. 790693 for construction and operation of two additional generating units (Unit 3 and 4) at Keephills Power Plant (TP.51-52, R.3-4, W5M); Board hearing 1980-01-29/30/31 & 1980-02-01 See also ERCB Report 82-C for decision on later application by TransAlta for Keephills expansion
Interveners
Calgary Power Ltd.
Sabey, DO
Kay, M
Fraser, WL
Chorel, M
Roxburgh, P
Railton, J
Candy, R
Gleghorn, D
Behie, S
DeSanto, JE
Alberta Power Limited
McDermid, N
Brascan Resources Limited
Stein, J
Committee on Keephills Environment (COKE)
Chow, M
Swist, RC
White, E
MacDougall, M
County of Parkland
McCullough, M
Miller, LN
Breckenridge, C
Edmonton Power
Patterson, MH
Kyte, E
Pettican, A
Sadesky, A
Warren, K
Majury, R
Electric Utility Planning Council (EUPC)
Cairns, RM
Hanslip, G
DeSarkar, A
Lake, G
Ewashko, JE
Fording Coal Limited
Hope-Ross, WJ
Rushton, HG
Genesee Agriculture Protection Society
Koebernick, W
Liba, L
Broadbent, H
Mertz, W
Genesee and Area Concerned Citizens Group
Lorincz, S
Lawrence, KW
PanCanadian Petroleum Limited
Little, GE
Duthie, RH
Porter, K
Porter Ranches Ltd.
Price, E
Porter, C
Quigg, A
Quigg, R
Swisht, RC
Warburg Coal Company
Siega, L
Department of Environment (Alberta Environment)
Lupul, S
Lang, D
Less detail

Decision 82-B

https://had.aer.ca/link/decision2311
Applicant
TransAlta Utilities Corporation
Alberta Power Limited
Application Number
810258
810425
Title
Decision on application by TransAlta Utilities Corporation and on application by Alberta Power Ltd., 1982 (electric service area, Winefred Lake)
Date
1982
Title
Decision on application by TransAlta Utilities Corporation and on application by Alberta Power Ltd., 1982 (electric service area, Winefred Lake)
Date
1982
Applicant
TransAlta Utilities Corporation
Alberta Power Limited
Application Number
810258
810425
Hearing Panel
Millard V
DeSorcy GJ
Goodman CJ
Hearing Type
Board
Utilities
Category
Electric power
Descriptors
Electric power distribution
Northeast Alberta
Service area
Conflict
Electric power demand
Electric power supply
Energy development
Expansion
NTS 73L
NTS 73M
NTS 74D
NTS 83I
NTS 83P
NTS 84A
Planning
Reliability
Legal References
Hydro and Electric Energy Act S23
Hydro and Electric Energy Act S26
Notes
ERCB report 82-B on application No. 810258 by TransAlta to extend electric service to Winefred Lake area and application No. 810425 by Alberta Power to extend electric service to Anzac, Janvier and Winefred Lake area (TP.59-90, R.1-18, W4M); Board hearing 1981-08-18/19/20/26/27
Less detail

Decision 82-C

https://had.aer.ca/link/decision2312
Applicant
TransAlta Utilities Corporation
Edmonton Power
Application Number
810222
810683
Title
Decision on application by TransAlta Utilities Corporation, 1982 (Keephills decision on application by Edmonton Power, 1982 (Genesee units 1 and 2 com generation expansion 1985-1987 Keephills and Genesee power plants
Date
1982
Title
Decision on application by TransAlta Utilities Corporation, 1982 (Keephills decision on application by Edmonton Power, 1982 (Genesee units 1 and 2 com generation expansion 1985-1987 Keephills and Genesee power plants
Date
1982
Applicant
TransAlta Utilities Corporation
Edmonton Power
Application Number
810222
810683
Hearing Panel
Berkowitz N
Goodman CJ
Warne GA
Mink FJ
Hearing Type
Board
Utilities
Category
Electric power
Descriptors
Electric power demand
Electric power project
Genesee power plant
Keephills power project
Thermal power plant
Alberta
Benefit cost analysis
Capacity
Coal - fuel
Cooling
Cost analysis
Economic analysis
Economic forecasting
Electric power supply
Energy development
Environmental impact
Expansion
Forecasting
Land reclamation
NTS 82O
NTS 83G
Planning
Reliability
Legal References
Hydro and Electric Energy Act S9
Notes
ERCB Report 82-C on application No. 810222 by TransAlta to construct Keephills unit 3 and 4 and on application No. 810683 by Edmonton Power to advance commissioning dates for Genesee units 1 and 2; Board hearing on Keephills 1981-06-24/25; Board hearing on Genesee 1981-11-25; See also related reports ERCB 79-AA (Genesee Power Plant) and ERCB 80-B (Keephills Power Plant expansion)
Interveners
TransAlta Utilities Corporation (Formerly Calgary Power Ltd.)
Sabey, DO
Kay, M
Fraser, WL
Lyons, GD
Crowe, T
Chorel, M
Railton, J
Robinson, J
Alberta Power Limited
Beames, J
Frey, JR
Jones, RG
McDermid, N
City of Edmonton (Edmonton Power)
Sherk, M
Kyte, E
Pelletier, D
Pettican, RA
Warren, K
Shinyei, F
DeSarkar, A
Electric Utility Planning Council (EUPC)
Ferguson, TH
Gardiner, P
Paicu, G
Gunn, J
The County of Parkland No. 31
Twach, T
Breckenridge, C
Committee on Keephills Environment
Ewashko, J
Department of Environment
Shewchuk, P
Fringe Environment Area Residents
Staszenski, B
Friends of the River
Smith, JH
Less detail

Decision 83-H

https://had.aer.ca/link/decision2272
Applicant
Alberta Power Limited
Application Number
830799
Title
Decision on application by Alberta Power Ltd., 1983 (to amend approvals to defer unit commissioning dates - Sheerness and Genesee power plants); electric generation expansion 1985-1990 Sheerness and Genesee power plants
Date
1983
Title
Decision on application by Alberta Power Ltd., 1983 (to amend approvals to defer unit commissioning dates - Sheerness and Genesee power plants); electric generation expansion 1985-1990 Sheerness and Genesee power plants
Date
1983
Applicant
Alberta Power Limited
Application Number
830799
Hearing Panel
Goodman CJ
Strom NA
Mink FJ
Hearing Type
Board
Utilities
Category
Electric power
Descriptors
Electric power project
Genesee power plant
Sheerness power plant
Benefit cost analysis
Capacity
Electric power demand
Electric power supply
Forecasting
NTS 72M
NTS 82P
NTS 83G
Planning
Power system interconnection
Revision
Legal References
Energy Resources Conservation Act S42
Hydro and Electric Energy Act S9
Notes
Decision D83-H on application No. 830799 by Alberta Power requesting amendments to the Sheerness and Genesee power plant approvals to defer the unit commissioning dates of Sheerness generating units 1 and 2 and Genesee generating units 2 and 1; errata dated Jan. 10, 1984 included; Board hearing 1983-09-28/29; see related reports 79-AA (& addendum), 80-B and 82-C
Less detail

Decision 87-03

https://had.aer.ca/link/decision226
Applicant
TransAlta Utilities Corporation
Application Number
861152
Title
Examiner report on application by TransAlta Utilities Corporation, 1987 (138 KV transmission line Gaetz-Joffre)
Date
1987
Title
Examiner report on application by TransAlta Utilities Corporation, 1987 (138 KV transmission line Gaetz-Joffre)
Date
1987
Applicant
TransAlta Utilities Corporation
Application Number
861152
Hearing Panel
Antonio HA
Yu JNG
Houlihan RN
Hearing Type
Examiners
Utilities
Category
Transmission line
Descriptors
Electric substation
Joffre area
Prentiss area
Transmission line
Chemical plant
Electric power demand
Electric power supply
Land use
NTS 83A
Route selection
Legal References
Hydro and Electric Energy Act S12
Hydro and Electric Energy Act S14
Hydro and Electric Energy Act S16
Hydro and Electric Energy Act S17
Hydro and Electric Energy Act S18
Hydro and Electric Energy Act S20
Notes
Examiners report E87-3 on application No. 861152 to construct a 138 KV transmission line in TP.38, R.25-27 W4M from Gaetz substation 87S to age Joffre substation 535S.
Interveners
Red Deer Ski and Recreation Area et al
Solick, H.
Hoskin, B.
Bower, D.
Less detail

Decision 87-14

https://had.aer.ca/link/decision199
Applicant
TransAlta Utilities Corporation
Application Number
870776
Title
Examiner report on application by TransAlta Utilities Corporation, 1987 (138-KV transmission lines west Brooks-Brooks-Duchess area)
Date
1987
Title
Examiner report on application by TransAlta Utilities Corporation, 1987 (138-KV transmission lines west Brooks-Brooks-Duchess area)
Date
1987
Applicant
TransAlta Utilities Corporation
Application Number
870776
Hearing Panel
Homeniuk TF
Remmer WG
Houlihan RN
Hearing Type
Examiners
Utilities
Category
Transmission line
Descriptors
Brooks area
Transmission line
Agricultural land
Electric power demand
Electric power supply
Locating
NTS 72L
Right of way
Route selection
Legal References
Hydro and Electric Energy Act S12
Hydro and Electric Energy Act S14
Hydro and Electric Energy Act S16
Hydro and Electric Energy Act S17
Hydro and Electric Energy Act S18
Hydro and Electric Energy Act S20
Notes
Examiners report E87-14 on application No. 870776 to remove from service and salvage the existing single circuit 138-KV line 100L between west Brooks substation 28S and Brooks substation 121S; to construct 9 km of new double circuit 138 KV line 814L/827-795L on right of way after removal of 100L; to construct 1.6 km of 138-KV line from substation 121S to interconnect with line 504L to Duchess substation 339S and to raise the voltage of line 504L from 69 KV to 138 KV and redesignate as line 831L; to alter substations 28S, 121S and 339S; to interconnect these facilities with the TAU transmission system and operate them (TP.18-20, R.13-15, W4M).
Interveners
Stica Group
Stica, M.
Stica, J.
Less detail

Decision 89-02

https://had.aer.ca/link/decision137
Applicant
TransAlta Utilities Corporation
Application Number
880953
Title
Decision 89-02 : TransAlta Utilities Corporation : application for a 240 KV transmission line Ellerslie-east, Edmonton area
Date
1989
Title
Decision 89-02 : TransAlta Utilities Corporation : application for a 240 KV transmission line Ellerslie-east, Edmonton area
Date
1989
Applicant
TransAlta Utilities Corporation
Application Number
880953
Hearing Panel
DeSorcy GJ
Prince JP
Orford RR
Hearing Type
Board
Utilities
Category
Transmission line
Descriptors
Edmonton area
Transmission line
Biological effect
Cancer
Electric field
Electric power demand
Electric power supply
Environmental impact
Epidemiology
Health
Land use
Magnetic field
NTS 83H
Ownership
Physiological effect
Regional planning
Right of way
Route selection
Safety
Transmission corridor
Transportation corridor
Legal References
Hydro and Electric Energy Act S12
Hydro and Electric Energy Act S17
Hydro and Electric Energy Act S18
Notes
Decision D89-2 on application No. 880953 to construct and operate a 240-kv transmission line from the Ellerslie substation to the east Edmonton substation; Board hearing held 1988-11-14/15/16/17/18
Interveners
County of Strathcona No. 20
Leduc-Strathcona Health Unit
Hulbert Crescent Subdivision
Parents' Association, Colchester Elementary School
Sherwood Park Greenbelt Protection Association
Hosford, W.
Edmonton Flying Club
Interprovincial Pipe Line Company
The City of Edmonton
Edmonton Metropolitian Regional Planning
Lehndorff Land Developments Inc.
Industrial Power Consumers Association of Alberta
Sherwood Park Fish & Game Association
Trison Instruments Ltd.
Less detail

Decision 89-03

https://had.aer.ca/link/decision120
Applicant
TransAlta Utilities Corporation
Application Number
881411
Title
Examiner report on application by TransAlta Utilities Corporation, 1989 (138-KV transmission line facilities Wainwright area)
Date
1989
Title
Examiner report on application by TransAlta Utilities Corporation, 1989 (138-KV transmission line facilities Wainwright area)
Date
1989
Applicant
TransAlta Utilities Corporation
Application Number
881411
Hearing Panel
Dilay JD
Asgar-Deen ML
Cassley A
Hearing Type
Examiners
Utilities
Category
Transmission line
Descriptors
Transmission line
Wainwright area
Agricultural land
Biological effect
Electric field
Electric power demand
Electric power supply
Environmental impact
Epidemiology
Health
Locating
NTS 73D
Physiological effect
Right of way
Route selection
Safety
Legal References
Hydro and Electric Energy Act S12
Hydro and Electric Energy Act S14
Hydro and Electric Energy Act S17
Hydro and Electric Energy Act S18
Notes
Examiners report E89-3 on application No. 881411 to construct about 26 km of 138-kv transmission line and to alter the existing 138-KV line (704L) and to alter the existing Wainwright substation and to interconnect these facilities with the applicant's system.
Interveners
Hill, T.
Warriner, K.
Marchand, T.
Marchand, M.
Bethune, A.
Wainwright Kennels
Less detail

Decision 90-01

https://had.aer.ca/link/decision100
Applicant
Energy Resources Conservation Board
Alberta Power Limited
City of Edmonton
TransAlta Utilities Corporation
Application Number
890963
Title
Decision 90-01 : TransAlta Utilities Corporation : Application for an Alberta Power Ltd Board proceeding to review electric generation planning parameters
Date
1990
Title
Decision 90-01 : TransAlta Utilities Corporation : Application for an Alberta Power Ltd Board proceeding to review electric generation planning parameters
Date
1990
Applicant
Energy Resources Conservation Board
Alberta Power Limited
City of Edmonton
TransAlta Utilities Corporation
Application Number
890963
Hearing Panel
Mink FJ
Prince JP
Morin EJ
Hearing Type
Board
Utilities
Category
Electric power
Descriptors
Alberta interconnected system
Cogeneration
Electric power demand
Electric power generation
Electric power supply
Resource management
Alberta
Forecasting
Procedure
Legal References
Hydro and Electric Energy Act S4
Notes
Decision D90-01 on proceeding No. 890963 to review certain matters relating to generation capacity expansion planning for the Alberta interconnected system; public meeting held 1989-11-14/15/166
Interveners
The Industrial Power Consumers Association of Alberta
The Canadian Petroleum Association
The City of Calgary
The City of Lethbridge
The City of Medicine Hat
Less detail

Decision 90-05

https://had.aer.ca/link/decision87
Applicant
City of Medicine Hat
Application Number
891967
Title
Decision 90-05 : City of Medicine Hat : Application for power plant expansion
Date
1990
Title
Decision 90-05 : City of Medicine Hat : Application for power plant expansion
Date
1990
Applicant
City of Medicine Hat
Application Number
891967
Hearing Panel
Strom NA
Prince JP
Evans RG
Hearing Type
Board
Utilities
Category
Electric power
Descriptors
Electric power project
Medicine Hat area
Steam electric power generation
Cost analysis
Economic analysis
Electric power demand
Electric power supply
Expansion
Forecasting
Gas turbine
Natural gas - fuel
Power system interconnection
Legal References
Hydro and Electric Energy Act S9
Hydro and Electric Energy Act S17
Notes
Decision D90-05 on application No. 891967 for approvals to construct, connect & operate an expansion consisting of two 17-MW gas turbine driven generators and associated heat recovery boilers and one 30-MW steam turbine driven generator, to the City's existing power plant; ERCB hearing held 1990-04-17/18
Interveners
TransAlta Utilities Corporation
Alberta Power Limited
The City of Edmonton/Edmonton Power
The City of Calgary
The City of Red Deer
The City of Lethbridge
Industrial Power Consumers
Medicine Hat and District Chamber of Commerce
Medicine Hat and District Labour Council
Medicine Hat Industrial Group
Municipal District of Cypress No.1
Town of Redcliff
Approval
Denied
Less detail

Decision 90-18

https://had.aer.ca/link/decision74
Applicant
City of Medicine Hat
Application Number
901544
Title
Decision 90-18 : City of Medicine Hat : Application for a power plant expansion
Date
1990
Title
Decision 90-18 : City of Medicine Hat : Application for a power plant expansion
Date
1990
Applicant
City of Medicine Hat
Application Number
901544
Hearing Type
Board
Utilities
Category
Electric power
Descriptors
Electric power project
Medicine Hat area
Steam electric power generation
Decision D1990-5
Electric power demand
Electric power supply
Expansion
Forecasting
Gas turbine
Natural gas - fuel
Power system interconnection
Notes
Decision D90-18 on application No. 901544 for approval to construct, connect and operate an expansion to the City's existing power plant; the expansion would consist of two 17-MW gas turbine driven generators and associated heat recovery boilers for operation by the fall of 1993, and one 30-MW steam turbine driven generator to be installed by 1996; also requested permission to immediately install one gas turbine unit to conduct acceptance tests; ERCB hearing held 1990-04-17/18
Less detail

Decision 91-12

https://had.aer.ca/link/decision31
Applicant
Edmonton Power
City of Edmonton
Application Number
910336
Title
Decision 91-12 : City of Edmonton (Edmonton Power) : Application for a review of commissioning date of Genesee unit No. 1
Date
1991
Title
Decision 91-12 : City of Edmonton (Edmonton Power) : Application for a review of commissioning date of Genesee unit No. 1
Date
1991
Applicant
Edmonton Power
City of Edmonton
Application Number
910336
Hearing Panel
Prince JP
Mink FJ
Evans RG`
Hearing Type
Board
Utilities
Category
Electric power
Descriptors
Electric power project
Genesee power plant
Benefit cost analysis
Capacity
Electric power demand
Electric power supply
Decision D1985-21
Decision D1983-H
Expansion
Forecasting
Planning
Power system interconnection
Notes
ERCB Decision D91-12 on application No. 910336 by Edmonton Power to amend approval No. HE8505 to delete 1991 as the commissioning date and allow construction of Genesee Unit No. 1 to continue; Hearing held 1991-08-15/16
Interveners
The City of Edmonton (Edmonton Power)
Pettican, A
Shinyei, F
Topping, D
Tadman, D
TransAlta Utilities Corporation
Dalgleish, T
Tapics, J
Way, D
Alberta Power Limited
Romanow, D
Frey, R
Baer, R
Walker, J
The City of Calgary
Short, D
Industrial Power Consumers Association of Alberta (IPCAA)
McLarty, A
Fording Coal Limited
McIntyre, P
Northern Alberta Building Trades Council and Provincial Building Trades Council
Hall, M
County of Leduc
Sjolie, B
Western Oldman Water Users Association
Arsene, W
Energy Consulting Inc.
Town of Stettler
Jackson, A
Alberta Cogeneration Council
Logan, K
Whitford, T
The International Brotherhood of Electrical Workers (IBEW)
Turner, D
Northwest Territories Building and Construction Trades Council
Blakely, R
Less detail

Decision 95-03

https://had.aer.ca/link/decision2545
Applicant
City of Calgary Electric System
Application Number
930711
Title
Decision 95-03 : The City of Calgary Electric System : Application to construct and operate a 138-kV transmission line (36.82L)
Date
1995
Title
Decision 95-03 : The City of Calgary Electric System : Application to construct and operate a 138-kV transmission line (36.82L)
Date
1995
Applicant
City of Calgary Electric System
Application Number
930711
Hearing Panel
Prince JP
Purvis RA
Sharp KG
Hearing Type
Board
Utilities
Category
Transmission line
Descriptors
Electric power transmission
Route selection
Transmission line
Power system interconnection
Electric power supply
Legal References
Hydro and Electric Energy Act S12
Hydro and Electric Energy Act S14
Hydro and Electric Energy Act S17
Notes
Decision on application to construct and operate a 138-kV single-circuit wood-pole transmission line designated as 36.82L. The line would extend about 15 km and would go from TransAlta Utilities existing Sarcee substation 42S to the city's No. 36 substation in west Calgary.
Interveners
Philco Farms Ltd.
Phillips, A.Sr.
Discovery Ridge Development Corporation
Power Farms Ltd.
Lowry, C.
Amden Investments Ltd.
Wardco Development Corporation
Bobenic, B. Jr.
Metro Development Corp. Ltd.
Paskapoo Slopes Preservation Society
Chinook Winds Adventist Acadamey
Edworthy, J.
Frank, J.
Gimbel, H.
Gimbel, J.
Carl Management Ltd.
Colpitts Ranches
Heimbecker, P.L.
Lennon, G.
Mardborough Properties Inc.
Carburn Aggregates
Tsuu Tina Nation
Less detail

Decision 2000-83

https://had.aer.ca/link/decision3302
Applicant
ATCO Electric Limited
Application Number
2000356
file no. 5678-5
Title
Decision 2000-83 : ATCO Electric Ltd. exemption under the Code of Conduct Regulation
Date
2000
Title
Decision 2000-83 : ATCO Electric Ltd. exemption under the Code of Conduct Regulation
Date
2000
Applicant
ATCO Electric Limited
Application Number
2000356
file no. 5678-5
Hearing Panel
McManus BT
McCrank MN
Heggie RD
Hearing Type
Board
Utilities
Category
Electric power
Descriptors
Code of conduct
Cogeneration
Electric power generation
Electric power supply
Legal References
Electric Utilities Code of Conduct Regulation S8
Electric Utilities Code of Conduct Regulation S10
Electric Utilities Code of Conduct Regulation S11
Electric Utilities Roles, Relationships and Responsibilities Regulation S11
Electric Utilities Roles, Relationships and Responsibilities Regulation S12
Notes
EUB decision D2000-83 on application by ATCO 's appointment of ATCO Energy as a default retailer and supplier of last resort so that customers may receive seamless service should a default in delivery occur. In order to appoint ATCO Energy ATCO Electric's default retailer, ATCO Electric has requested exemption from Code of Conduct Regulation.
Approval
Denied
Less detail

Decision 2001-54

https://had.aer.ca/link/decision3379
Applicant
ATCO Electric Limited
Application Number
2000356
file no. 5678-5
Title
Decision 2001-54 : ATCO Electric Ltd. application for exemption under the Code of Conduct Regulation
Date
2001
Title
Decision 2001-54 : ATCO Electric Ltd. application for exemption under the Code of Conduct Regulation
Date
2001
Applicant
ATCO Electric Limited
Application Number
2000356
file no. 5678-5
Hearing Panel
McManus BT
McCrank MN
Heggie RD
Hearing Type
Board
Utilities
Category
Electric power
Descriptors
Code of conduct
Cogeneration
Decision D2000-83
Electric power generation
Electric power supply
Legal References
Electric Utilities Code of Conduct Regulation S8
Electric Utilities Code of Conduct Regulation S10
Electric Utilities Code of Conduct Regulation S11
Electric Utilities Roles, Relationships and Responsibilities Regulation S11
Electric Utilities Roles, Relationships and Responsibilities Regulation S12
Notes
EUB decision D2001-54 on application by ATCO for exemption from certain provisions of the Code of Conduct Regulation.
Interveners
ENMAX Energy Corporation
ENMAX Power Corporation
FIRM
Industrial Power Consumers and Cogenerators Association of Alberta (IPCCAA)
Independent Power Producers' Society of Alberta (IPPSA)
Senior Petroleum Producers Association (SPPA)
City of Calgary
Approval
Denied
Less detail

29 records – page 1 of 2.