74 records – page 1 of 4.

Decision 71-C-HE

https://had.aer.ca/link/decision2399
Applicant
Canadian Utilities Limited
Application Number
5818
Title
Decision on application by Canadian Utilities Limited, 1971 (for approval of the construction and operation of an addition to the Battle River power plant and for an order for its interconnection)
Date
1971
Title
Decision on application by Canadian Utilities Limited, 1971 (for approval of the construction and operation of an addition to the Battle River power plant and for an order for its interconnection)
Date
1971
Applicant
Canadian Utilities Limited
Application Number
5818
Hearing Panel
Govier GW
Millard V
Strong JI
Hearing Type
Board
Utilities
Category
Electric power
Descriptors
Battle River power plant
Electric power generation
Electric power plant
Alberta
Legal References
Hydro and Electric Energy Act S7
Notes
ERCB report 71-C-HE on application No. 5818 to construct and operate a fourth coal-fired unit of 150 MW and to interconnect with Cdn Utilities transmission lines; granted by Order Misc HE 7201.
Approval
Approved
Less detail

Decision 73-C

https://had.aer.ca/link/decision2479
Applicant
Energy Resources Conservation Board
Application Number
6147
Title
Report on choices among energy resources for generation of electric energy in Alberta
Date
1973
Title
Report on choices among energy resources for generation of electric energy in Alberta
Date
1973
Applicant
Energy Resources Conservation Board
Application Number
6147
Hearing Panel
Govier GW
Millard V
Strong JI
Berkowitz N
Hearing Type
Board
Utilities
Category
Electric power
Descriptors
Electric power generation
Alberta
Notes
ERCB report 73-C on proceeding No. 6147 to examine Alberta's present and future requirements of energy and energy resources; Board hearing 1972-09-19/20/21/22/26/27/28; see also related reports from same proceeding ERCB 73-O and ERCB 74-F
Less detail

Decision 73-D-HE

https://had.aer.ca/link/decision2400
Applicant
Energy Resources Conservation Board
Application Number
N/A
Title
Hydro and hydro electric energy potential of Alberta
Date
1973
Title
Hydro and hydro electric energy potential of Alberta
Date
1973
Applicant
Energy Resources Conservation Board
Application Number
N/A
Hearing Panel
N/A
Hearing Type
N/A
Utilities
Category
Electric power
Descriptors
Electric power generation
Hydroelectric power generation
Alberta
River
Notes
UPDATED by ERCB report 81-E entitled "Alberta's hydroelectric energy resources" ERCB report 73-D-HE
Less detail

Decision 75-C

https://had.aer.ca/link/decision2365
Applicant
Calgary Power Ltd.
Application Number
7514
Title
Decision on application by Calgary Power Ltd., 1975 (construction and operation of an addition to the Sundance power plant)
Date
1975
Title
Decision on application by Calgary Power Ltd., 1975 (construction and operation of an addition to the Sundance power plant)
Date
1975
Applicant
Calgary Power Ltd.
Application Number
7514
Hearing Panel
Govier GW
Millard V
Strong JI
Hearing Type
Board
Utilities
Category
Electric power
Descriptors
Electric power generation
Electric power plant
Power system interconnection
Sundance power plant
Thermal power plant
Alberta
Coal - fuel
Electric power demand
Environmental impact
Lake Wabamun
NTS 83G
Legal References
Hydro and Electric Energy Act S7
Hydro and Electric Energy Act S14
Notes
ERCB report 75-C on application No. 7514 for construction and operation of unit 5 of Sundance power plant; Board hearing (Govier/Millard/Strong) held 1974-03-12; Order No. HE 7410
Less detail

Decision 75-E

https://had.aer.ca/link/decision2363
Applicant
Alberta Power Limited
Application Number
7556
Title
Decision on application by Alberta Power Ltd., 1975 (construction and operation of an addition to the Battle River power plant)
Date
1975
Title
Decision on application by Alberta Power Ltd., 1975 (construction and operation of an addition to the Battle River power plant)
Date
1975
Applicant
Alberta Power Limited
Application Number
7556
Hearing Panel
Govier GW
Strong JI
DeSorcy GJ
Hearing Type
Board
Utilities
Category
Electric power
Descriptors
Battle River power plant
Electric power generation
Electric power plant
Power system interconnection
Thermal power plant
Alberta
Coal - fuel
Electric power demand
Environmental impact
NTS 83A
Legal References
Hydro and Electric Energy Act S7
Hydro and Electric Energy Act S14
Notes
ERCB report 75-E on application No. 7556 for an addition (unit 5) to the Battle River power plant; Board hearing (Govier/Strong/Desorcy) held 1974-05-01/02; Order no HE 7501
Less detail

Decision 75-J

https://had.aer.ca/link/decision2357
Applicant
Calgary Power Ltd.
Application Number
8239
Title
Decision on application by Calgary Power Ltd., 1975 (for construction and operation of a sixth unit at Sundance power plant)
Date
1975
Title
Decision on application by Calgary Power Ltd., 1975 (for construction and operation of a sixth unit at Sundance power plant)
Date
1975
Applicant
Calgary Power Ltd.
Application Number
8239
Hearing Panel
Millard V
Berkowitz N
DeSorcy GJ
Hearing Type
Board
Utilities
Category
Electric power
Descriptors
Electric power generation
Electric power plant
Electric power project
Power system interconnection
Sundance power plant
Thermal power plant
Alberta
Coal - fuel
Electric power demand
Environmental impact
NTS 83G
Pollution control
Legal References
Hydro and Electric Energy Act S7
Hydro and Electric Energy Act S14
Notes
ERCB report 75-J on application No. 8239 for construction and operation of unit 6 at Sundance power plant in TP.52, R.4, W5.
Less detail

Decision 75-P

https://had.aer.ca/link/decision2352
Applicant
Energy Resources Conservation Board
Application Number
8379
Title
Generation and supply of electric energy in the south-east area of Alberta
Date
1975
Title
Generation and supply of electric energy in the south-east area of Alberta
Date
1975
Applicant
Energy Resources Conservation Board
Application Number
8379
Hearing Panel
Govier GW
DeSorcy GJ
Goodman CJ
Hearing Type
Board
Utilities
Category
Electric power
Descriptors
Electric power demand
Electric power distribution
Electric power generation
Electric power supply
Electric power transmission
Transmission line
Economic forecasting
Forecasting
NTS 72E
NTS 72L
NTS 82H
NTS 82I
Planning
Southern Alberta
Notes
ERCB report 75-P on proceeding No. 8379 to consider the development and operation of facilities for the area of Alberta for a 15-YR period starting in January 1975; Board hearing 1975-06-03/04
Less detail

Decision 77-24

https://had.aer.ca/link/decision2124
Applicant
Syncrude Canada Ltd.
Title
Decision 77-24: Coke utilization study - Syncrude Canada Ltd.
Date
1977
Title
Decision 77-24: Coke utilization study - Syncrude Canada Ltd.
Date
1977
Applicant
Syncrude Canada Ltd.
Hearing Type
Utilities
Category
Oil sands
Descriptors
Bitumen
Coke
Fluid coking
Fuel
Mildred Lake project
Cost analysis
Economic analysis
Electric power generation
Gasification
Utilization
Notes
Decision 77-24 giving the Board's assessment of Syncrude submission entitled "Evaluation of options for utilizing by-product fluid coke Syncrude Mildred Lake project". report submitted as a result of a condition on approval HE 7313 (on application No. 6888); see also report ERCB 73-K-HE-OG
Less detail

Decision 85-21

https://had.aer.ca/link/decision1274
Applicant
Alberta Power Limited
City of Edmonton
Transalta Utilities Corporation
Application Number
840837
Title
Decision on proceeding to amend approval HE 8312 held by Alberta Power Ltd. electric generation expansion 1986-1991 Sheerness and Genesee power plants
Date
1985
Title
Decision on proceeding to amend approval HE 8312 held by Alberta Power Ltd. electric generation expansion 1986-1991 Sheerness and Genesee power plants
Date
1985
Applicant
Alberta Power Limited
City of Edmonton
Transalta Utilities Corporation
Application Number
840837
Hearing Panel
Millard V
Goodman CJ
Mink FJ
Hearing Type
Board
Utilities
Category
Electric power
Descriptors
Electric power generation
Electric power project
Genesee power plant
Sheerness power plant
Capacity
Coal - fuel
Cost analysis
Electric power demand
Expansion
Forecasting
Planning
Power system interconnection
Socio-economic effect
Notes
ERCB Decision D85-21 on proceeding No. 840837 to review commissioning dates of the Sheerness and Genessee generating units in the 1986-1991 period in light of events which occurred after issuance of Decision D83-H; Board Hearing 1985-01-22/23/24/25/30
Interveners
Electric Utility Planning Council (EUPC)
McAvity, EO
Hanslip, G
Gunn, J
Taylor, W
Valiant, R
Alberta Power Limited
Major, JC
Provost, K
Frey, JR
Lake, G
TransAlta Utilities Corporation
Patterson, MH
Hopkins, WJ
Fraser, WL
Crowe, T
The City of Edmonton (Edmonton Power)
Beames, JW
Sherk, M
Kyte, EF
Pettican, A
Wright, R
Wright Mansell Research Ltd.
The City of Calgary
Goss, RF
Larder, DA
The City of Lethbridge
Martin, E
Industrial Power Consumers Association of Alberta (IPCAA)
Curtis, R
Clark, BW
Fording Coal Limited
Smith, JR
Manalta Coal Limited
Holgate, DA
Portigal, L
Decker, J
Shaneman, R
Luscar Limited
MacDonald, M
Smith, D
Haddock, K
Electrical Contractors Association of Alberta (ECAA)
Soucy, GA
Energy Chemical Workers Union
Nielsen, R
Coe, E
Southern Alberta Building and Construction Trades (Southern Alberta)
Pittman, PRJ
Briegel, J
Alberta and N.W.T. (Distirct of Mackenzie) Building and Construction Trades Council
Garby, R
INTEG - Intercontinental Engineering Ltd.
Smith, MJ
Cana Construction Co. Ltd.
Dunlop, JD
The County of Leduc No. 25
Walter, EJ
Pinkowski, K
The Town of Hanna and District
McLarty, AL
Dookie, S
Grover, A
The Town of Calmar
McCartney, G
The Village of Warburg
Haggerty, D
The Village of Thorsby
Bacsik, L
Senio, B
The Village of Breton
Hilker, JD
Edmonton Economic Development Authority
Bleiken, AG
Battle River Regional Planning Commission
Scerbak, G
Fenwick, PD
Alberta Wind Power Associates
Otis, J
Less detail

Decision 88-02

https://had.aer.ca/link/decision192
Applicant
Southview Fibre Tech Ltd.
Application Number
871411
Title
Decision on application by Southview Fibre Tech Ltd., 1988 (wood waste power plant Calling Lake area)
Date
1988
Title
Decision on application by Southview Fibre Tech Ltd., 1988 (wood waste power plant Calling Lake area)
Date
1988
Applicant
Southview Fibre Tech Ltd.
Application Number
871411
Hearing Panel
Goodman CJ
Mink FJ
MacDonald NW
Hearing Type
Board
Utilities
Category
Electric power
Descriptors
Calling Lake area
Electric power generation
Industrial plant
Non-utility generation
Wood waste
Cost analysis
Electric power demand
Electric power rate
Forecasting
NTS 83I
Power system interconnection
Legal References
Hydro and Electric Energy Act S17
Notes
Decision D88-02 on application No. 871411 for approval to connect a 30-MW wood burning power plant with the electric system of TransAlta Utilities and to establish the basis for determining the price of power and energy to be sold to TransAlta Utilities.
Interveners
County of Athabasca # 12
TransAlta Utilities Corporation
Alberta Power Limited
Industrial Power Consumers Association
City of Edmonton
City of Calgary
City of Red Deer
City of Lloydminister
Less detail

Decision 88-A

https://had.aer.ca/link/decision193
Applicant
Energy Resources Conservation Board
Public Utilities Board
Application Number
870621
Title
Small power inquiry
Date
1988
Title
Small power inquiry
Date
1988
Applicant
Energy Resources Conservation Board
Public Utilities Board
Application Number
870621
Hearing Panel
Goodman CJ
Mink FJ
Hetherington TD
Dunstan JR
Hearing Type
Board
Utilities
Category
Inquiry
Electric power
Descriptors
Electric power distribution
Electric power generation
Electric power rate
Non-utility generation
Power system interconnection
Renewable energy source
Wind power
Wind power generation
Electric utility
Energy policy
Rate (cost)
Regulation
Notes
ERCB report 88-A (PUB report E88001) on proceeding No. 870621 at the direction of the Lieutenant Governor in Council; inquiry held 1987-10-05 through 1987-10-16
Less detail

Decision 90-01

https://had.aer.ca/link/decision100
Applicant
Energy Resources Conservation Board
Alberta Power Limited
City of Edmonton
TransAlta Utilities Corporation
Application Number
890963
Title
Decision 90-01 : TransAlta Utilities Corporation : Application for an Alberta Power Ltd Board proceeding to review electric generation planning parameters
Date
1990
Title
Decision 90-01 : TransAlta Utilities Corporation : Application for an Alberta Power Ltd Board proceeding to review electric generation planning parameters
Date
1990
Applicant
Energy Resources Conservation Board
Alberta Power Limited
City of Edmonton
TransAlta Utilities Corporation
Application Number
890963
Hearing Panel
Mink FJ
Prince JP
Morin EJ
Hearing Type
Board
Utilities
Category
Electric power
Descriptors
Alberta interconnected system
Cogeneration
Electric power demand
Electric power generation
Electric power supply
Resource management
Alberta
Forecasting
Procedure
Legal References
Hydro and Electric Energy Act S4
Notes
Decision D90-01 on proceeding No. 890963 to review certain matters relating to generation capacity expansion planning for the Alberta interconnected system; public meeting held 1989-11-14/15/166
Interveners
The Industrial Power Consumers Association of Alberta
The Canadian Petroleum Association
The City of Calgary
The City of Lethbridge
The City of Medicine Hat
Less detail

Decision 90-05

https://had.aer.ca/link/decision87
Applicant
City of Medicine Hat
Application Number
891967
Title
Decision 90-05 : City of Medicine Hat : Application for power plant expansion
Date
1990
Title
Decision 90-05 : City of Medicine Hat : Application for power plant expansion
Date
1990
Applicant
City of Medicine Hat
Application Number
891967
Hearing Panel
Strom NA
Prince JP
Evans RG
Hearing Type
Board
Utilities
Category
Electric power
Descriptors
Electric power project
Medicine Hat area
Steam electric power generation
Cost analysis
Economic analysis
Electric power demand
Electric power supply
Expansion
Forecasting
Gas turbine
Natural gas - fuel
Power system interconnection
Legal References
Hydro and Electric Energy Act S9
Hydro and Electric Energy Act S17
Notes
Decision D90-05 on application No. 891967 for approvals to construct, connect & operate an expansion consisting of two 17-MW gas turbine driven generators and associated heat recovery boilers and one 30-MW steam turbine driven generator, to the City's existing power plant; ERCB hearing held 1990-04-17/18
Interveners
TransAlta Utilities Corporation
Alberta Power Limited
The City of Edmonton/Edmonton Power
The City of Calgary
The City of Red Deer
The City of Lethbridge
Industrial Power Consumers
Medicine Hat and District Chamber of Commerce
Medicine Hat and District Labour Council
Medicine Hat Industrial Group
Municipal District of Cypress No.1
Town of Redcliff
Approval
Denied
Less detail

Decision 90-18

https://had.aer.ca/link/decision74
Applicant
City of Medicine Hat
Application Number
901544
Title
Decision 90-18 : City of Medicine Hat : Application for a power plant expansion
Date
1990
Title
Decision 90-18 : City of Medicine Hat : Application for a power plant expansion
Date
1990
Applicant
City of Medicine Hat
Application Number
901544
Hearing Type
Board
Utilities
Category
Electric power
Descriptors
Electric power project
Medicine Hat area
Steam electric power generation
Decision D1990-5
Electric power demand
Electric power supply
Expansion
Forecasting
Gas turbine
Natural gas - fuel
Power system interconnection
Notes
Decision D90-18 on application No. 901544 for approval to construct, connect and operate an expansion to the City's existing power plant; the expansion would consist of two 17-MW gas turbine driven generators and associated heat recovery boilers for operation by the fall of 1993, and one 30-MW steam turbine driven generator to be installed by 1996; also requested permission to immediately install one gas turbine unit to conduct acceptance tests; ERCB hearing held 1990-04-17/18
Less detail

Decision 94-04

https://had.aer.ca/link/decision2519
Applicant
Baloil Resources Ltd.
Application Number
931409
Title
Examiner report on application by Baloil Resources Ltd., 1994 (Zama Lake power plant)
Date
1994
Title
Examiner report on application by Baloil Resources Ltd., 1994 (Zama Lake power plant)
Date
1994
Applicant
Baloil Resources Ltd.
Application Number
931409
Hearing Panel
Prince JP
Evans RG
Barfett AC
Dunstan NJR
Hearing Type
Examiners
Utilities
Category
Electric power
Descriptors
Electric power generation
Electric power rate
Non-utility generation
Power system interconnection
Zama Virgo basin
Compensation
Legal References
Hydro and Electric Energy Act S17
Notes
ERCB decision D94-7 and examiners report E94-4 on application no. 931409 to order Alberta Power to connect with and take the electric energy generated by Baloil's proposed power plant at Zama Lake; to establish terms and conditions for determining the basis for payment of compensation by APL for the electric power that would be generated; and adopt the views and recommendations in the ERCB/PUB Small Power Inquiry Report as the basis for setting compensation; and to determine the amount of compensation payable for the electric power that would be generated and set the price for that energy at 4.7 cents per kWh; Concurrent ERCB/PUB hearing 1994-02-08
Interveners
Alberta Power Limited
The City of Lethbridge
The Town of Fort MacLeod
TransAlta Utilities Corporation
Industrial Power Consumers Association
Municipal Intervenors
City of Calgary
Edmonton Power
Alberta Cogenerators Council
Less detail

Decision 94-07

https://had.aer.ca/link/decision2520
Applicant
Baloil Resources Ltd.
Application Number
931409
Title
Decision 94-07 : Baloil Resources Ltd.: Application for a Zama Lake power plant
Date
1994
Title
Decision 94-07 : Baloil Resources Ltd.: Application for a Zama Lake power plant
Date
1994
Applicant
Baloil Resources Ltd.
Application Number
931409
Hearing Panel
Prince JP
Evans RG
Barfett AC
Dunstan NJR
Hearing Type
Examiners
Utilities
Category
Electric power
Descriptors
Electric power generation
Electric power rate
Non-utility generation
Power system interconnection
Zama Virgo basin
Compensation
Legal References
Hydro and Electric Energy Act S17
Notes
ERCB decision D94-7 and examiners report E94-4 on application no. 931409 to order Alberta Power to connect with and take the electric energy generated by Baloil's proposed power plant at Zama Lake; to establish terms and conditions for determining the basis for payment of compensation by APL for the electric power that would be generated; and adopt the views and recommendations in the ERCB/PUB Small Power Inquiry Report as the basis for setting compensation; and to determine the amount of compensation payable for the electric power that would be generated and set the price for that energy at 4.7 cents per kWh; Concurrent ERCB/PUB hearing 1994-02-08
Interveners
Alberta Power Limited
The City of Lethbridge
The Town of Fort Macleod
TransAlta Utilities Corporation
Industrial Power Consumers Association of Alberta
Municipal Intervenors
City of Calgary
Edmonton Power
Alberta Cogenerators Council
Independent Power Producers Society of Alberta
Less detail

Decision 99-04

https://had.aer.ca/link/decision3041
Applicant
Imperial Oil Resources Limited
Application Number
970488
Title
Decision 99-04: Imperial Oil Resources Limited industrial system designation Cold Lake Expansion Project
Date
1999
Title
Decision 99-04: Imperial Oil Resources Limited industrial system designation Cold Lake Expansion Project
Date
1999
Applicant
Imperial Oil Resources Limited
Application Number
970488
Hearing Panel
Belanger C
Miller GJ
Mink FJ
Hearing Type
Board
Utilities
Category
Electric power
Descriptors
Cogeneration
Cold Lake heavy oil project
Electric power generation
Electric power transmission
Industrial plant
Power system interconnection
Legal References
Electric Utilities Act S2
Electric Utilities Act S73
Hydro and Electric Energy Act S1
Hydro and Electric Energy Act S2
Hydro and Electric Energy Act S12
Hydro and Electric Energy Act S14
Hydro and Electric Energy Act S17
Notes
EUB Decision D99-04 on application 970488 to designate Imperial's new electrical generation, transmission, and distribution systems serving its Cold Lake operations as an "industrial system"; and make rules exempting from the operation of the Electric Utilities Act, electric energy produced from and consumed by the proposed "industrial system", pursuant to section 73(4) of the Electric Utilities Act;
Interveners
Alberta Power Limited
ENMAX Corporation
Industrial Power Consumers Association of Alberta
TransAlta Energy
TransAlta Utilities
Independent Power Producers Society of Alberta And Senior Petroleum Producers Association of Alberta
NOVA Chemicals Limited
ESBI Alberta Limited
Alberta Federation of REAs Limited
Alberta Association of Municipal Districts and Counties And Public Institutional Consumers Association
Less detail

Decision 99-22

https://had.aer.ca/link/decision3097
Applicant
Imperial Oil Resources Limited
Application Number
970163
Title
Decision 99-22: Application to amend Approval No. 3950 Imperial Oil Resources Limited, Cold Lake Production Project, Mahkeses Development
Date
1999
Title
Decision 99-22: Application to amend Approval No. 3950 Imperial Oil Resources Limited, Cold Lake Production Project, Mahkeses Development
Date
1999
Applicant
Imperial Oil Resources Limited
Application Number
970163
Hearing Panel
Mink FJ
Miller GJ
Dilay JD
Hearing Type
Board
Utilities
Category
Oil sands
Electric power
Descriptors
Arsenic
Bitumen
Clearwater Fm
Cogeneration
Cold Lake heavy oil project
Cyclic steam injection
Electric power generation
Electric power project
Formation evaluation
Mahkeses development
Legal References
Hydro and Electric Energy Act S9
Oil Sands Conservation Act S14
Notes
EUB Decision D99-22 on application 970163 concerning Imperial Oil's application under Section 14 of the Oil Sands Conservation Act to amend Approval No. 3950 to allow for an expansion of its Cold Lake commercial project and under Section 9 of the Hydro and Electric Energy Act to construct and operate an electrical power plant.
Board Hearing (Calgary): 1998-11-30 to 1998-12-03; 1998-12-07 to 1998-12-11; 1998-12-14 to 1998-12-16; 1999-01-05
Interveners
Axell SA
Cold Lake First Nations
Francis M
Geoph P
Gibeault B
Marie Lake Landowners Association (MLLA)
Martin H
Nriagu JO
Nyland E
Pernarowski C
Pernarowski R
Piche M
Reddecliff E
Savard D
Scannie (Chief - First Nations)
Stop and Tell Our Politicians (STOP)
Ulfsten SA
Weyer U
Wilde R
Less detail

Decision 2000-14

https://had.aer.ca/link/decision3156
Applicant
TransAlta Utilities Corporation
Application Number
990616
file 5601-15
Title
Decision 2000-14 : TransAlta Utilities Corporation temporary suspension regulation
Date
2000
Title
Decision 2000-14 : TransAlta Utilities Corporation temporary suspension regulation
Date
2000
Applicant
TransAlta Utilities Corporation
Application Number
990616
file 5601-15
Hearing Panel
McManus BT
Miller GJ
Asgar-Deen ML
Hearing Type
Board
Utilities
Category
Electric power rate
Descriptors
Electric power generation
Legal References
Electric Utilities Act S34
Electric Utilities Temporary Suspension Regulation S4
Notes
EUB Decision D2000-14 on application by TransAlta requesting interim relief from unit obligation value payments to Keephills 1 & 2 generating unitsas per Temporary Suspension Regulation Alberta Regulation 284/95
Approval
Approved
Less detail

Decision 2000-27

https://had.aer.ca/link/decision3214
Applicant
ESBI Alberta Ltd.
Application Number
990005
Title
Decision 2000-27: ESBI Alberta Ltd. 1999/2000 tariff application refiling - part D : line losses calculation methodology
Date
2000
Title
Decision 2000-27: ESBI Alberta Ltd. 1999/2000 tariff application refiling - part D : line losses calculation methodology
Date
2000
Applicant
ESBI Alberta Ltd.
Application Number
990005
Hearing Panel
McManus BT
Berg AJ
MacDonald NW
Hearing Type
Utilities
Category
Electric power rate
Descriptors
Public utility
Electric power rate
Electric power generation
General rate application
Refiling
Supply (economics)
Decision D2000-01
Notes
Decision on tariff application refiling respecting lines losses calculation methodology
Less detail

74 records – page 1 of 4.