Decision 71-C-HE
https://had.aer.ca/link/decision2399
- Applicant
- Canadian Utilities Limited
- Application Number
- 5818
- Title
- Decision on application by Canadian Utilities Limited, 1971 (for approval of the construction and operation of an addition to the Battle River power plant and for an order for its interconnection)
- Date
- 1971
- Title
- Decision on application by Canadian Utilities Limited, 1971 (for approval of the construction and operation of an addition to the Battle River power plant and for an order for its interconnection)
- Date
- 1971
- Applicant
- Canadian Utilities Limited
- Application Number
- 5818
- Hearing Panel
- Govier GW
- Millard V
- Strong JI
- Hearing Type
- Board
- Utilities
- Category
- Electric power
- Legal References
- Hydro and Electric Energy Act S7
- Notes
- ERCB report 71-C-HE on application No. 5818 to construct and operate a fourth coal-fired unit of 150 MW and to interconnect with Cdn Utilities transmission lines; granted by Order Misc HE 7201.
- Approval
- Approved
Decision 73-C
https://had.aer.ca/link/decision2479
- Applicant
- Energy Resources Conservation Board
- Application Number
- 6147
- Title
- Report on choices among energy resources for generation of electric energy in Alberta
- Date
- 1973
- Title
- Report on choices among energy resources for generation of electric energy in Alberta
- Date
- 1973
- Applicant
- Energy Resources Conservation Board
- Application Number
- 6147
- Hearing Panel
- Govier GW
- Millard V
- Strong JI
- Berkowitz N
- Hearing Type
- Board
- Utilities
- Category
- Electric power
- Descriptors
- Electric power generation
- Alberta
- Notes
- ERCB report 73-C on proceeding No. 6147 to examine Alberta's present and future requirements of energy and energy resources; Board hearing 1972-09-19/20/21/22/26/27/28; see also related reports from same proceeding ERCB 73-O and ERCB 74-F
Decision 73-D-HE
https://had.aer.ca/link/decision2400
- Applicant
- Energy Resources Conservation Board
- Application Number
- N/A
- Title
- Hydro and hydro electric energy potential of Alberta
- Date
- 1973
- Title
- Hydro and hydro electric energy potential of Alberta
- Date
- 1973
- Applicant
- Energy Resources Conservation Board
- Application Number
- N/A
- Hearing Panel
- N/A
- Hearing Type
- N/A
- Utilities
- Category
- Electric power
- Notes
- UPDATED by ERCB report 81-E entitled "Alberta's hydroelectric energy resources" ERCB report 73-D-HE
Decision 75-C
https://had.aer.ca/link/decision2365
- Applicant
- Calgary Power Ltd.
- Application Number
- 7514
- Title
- Decision on application by Calgary Power Ltd., 1975 (construction and operation of an addition to the Sundance power plant)
- Date
- 1975
- Title
- Decision on application by Calgary Power Ltd., 1975 (construction and operation of an addition to the Sundance power plant)
- Date
- 1975
- Applicant
- Calgary Power Ltd.
- Application Number
- 7514
- Hearing Panel
- Govier GW
- Millard V
- Strong JI
- Hearing Type
- Board
- Utilities
- Category
- Electric power
- Descriptors
- Electric power generation
- Electric power plant
- Power system interconnection
- Sundance power plant
- Thermal power plant
- Alberta
- Coal - fuel
- Electric power demand
- Environmental impact
- Lake Wabamun
- NTS 83G
- Legal References
- Hydro and Electric Energy Act S7
- Hydro and Electric Energy Act S14
- Notes
- ERCB report 75-C on application No. 7514 for construction and operation of unit 5 of Sundance power plant; Board hearing (Govier/Millard/Strong) held 1974-03-12; Order No. HE 7410
Decision 75-E
https://had.aer.ca/link/decision2363
- Applicant
- Alberta Power Limited
- Application Number
- 7556
- Title
- Decision on application by Alberta Power Ltd., 1975 (construction and operation of an addition to the Battle River power plant)
- Date
- 1975
- Title
- Decision on application by Alberta Power Ltd., 1975 (construction and operation of an addition to the Battle River power plant)
- Date
- 1975
- Applicant
- Alberta Power Limited
- Application Number
- 7556
- Hearing Panel
- Govier GW
- Strong JI
- DeSorcy GJ
- Hearing Type
- Board
- Utilities
- Category
- Electric power
- Descriptors
- Battle River power plant
- Electric power generation
- Electric power plant
- Power system interconnection
- Thermal power plant
- Alberta
- Coal - fuel
- Electric power demand
- Environmental impact
- NTS 83A
- Legal References
- Hydro and Electric Energy Act S7
- Hydro and Electric Energy Act S14
- Notes
- ERCB report 75-E on application No. 7556 for an addition (unit 5) to the Battle River power plant; Board hearing (Govier/Strong/Desorcy) held 1974-05-01/02; Order no HE 7501
Decision 75-J
https://had.aer.ca/link/decision2357
- Applicant
- Calgary Power Ltd.
- Application Number
- 8239
- Title
- Decision on application by Calgary Power Ltd., 1975 (for construction and operation of a sixth unit at Sundance power plant)
- Date
- 1975
- Title
- Decision on application by Calgary Power Ltd., 1975 (for construction and operation of a sixth unit at Sundance power plant)
- Date
- 1975
- Applicant
- Calgary Power Ltd.
- Application Number
- 8239
- Hearing Panel
- Millard V
- Berkowitz N
- DeSorcy GJ
- Hearing Type
- Board
- Utilities
- Category
- Electric power
- Descriptors
- Electric power generation
- Electric power plant
- Electric power project
- Power system interconnection
- Sundance power plant
- Thermal power plant
- Alberta
- Coal - fuel
- Electric power demand
- Environmental impact
- NTS 83G
- Pollution control
- Legal References
- Hydro and Electric Energy Act S7
- Hydro and Electric Energy Act S14
- Notes
- ERCB report 75-J on application No. 8239 for construction and operation of unit 6 at Sundance power plant in TP.52, R.4, W5.
Decision 75-P
https://had.aer.ca/link/decision2352
- Applicant
- Energy Resources Conservation Board
- Application Number
- 8379
- Title
- Generation and supply of electric energy in the south-east area of Alberta
- Date
- 1975
- Title
- Generation and supply of electric energy in the south-east area of Alberta
- Date
- 1975
- Applicant
- Energy Resources Conservation Board
- Application Number
- 8379
- Hearing Panel
- Govier GW
- DeSorcy GJ
- Goodman CJ
- Hearing Type
- Board
- Utilities
- Category
- Electric power
- Descriptors
- Electric power demand
- Electric power distribution
- Electric power generation
- Electric power supply
- Electric power transmission
- Transmission line
- Economic forecasting
- Forecasting
- NTS 72E
- NTS 72L
- NTS 82H
- NTS 82I
- Planning
- Southern Alberta
- Notes
- ERCB report 75-P on proceeding No. 8379 to consider the development and operation of facilities for the area of Alberta for a 15-YR period starting in January 1975; Board hearing 1975-06-03/04
Decision 77-24
https://had.aer.ca/link/decision2124
- Applicant
- Syncrude Canada Ltd.
- Title
- Decision 77-24: Coke utilization study - Syncrude Canada Ltd.
- Date
- 1977
- Title
- Decision 77-24: Coke utilization study - Syncrude Canada Ltd.
- Date
- 1977
- Applicant
- Syncrude Canada Ltd.
- Hearing Type
- Utilities
- Category
- Oil sands
- Descriptors
- Bitumen
- Coke
- Fluid coking
- Fuel
- Mildred Lake project
- Cost analysis
- Economic analysis
- Electric power generation
- Gasification
- Utilization
- Notes
- Decision 77-24 giving the Board's assessment of Syncrude submission entitled "Evaluation of options for utilizing by-product fluid coke Syncrude Mildred Lake project". report submitted as a result of a condition on approval HE 7313 (on application No. 6888); see also report ERCB 73-K-HE-OG
Decision 85-21
https://had.aer.ca/link/decision1274
- Applicant
- Alberta Power Limited
- City of Edmonton
- Transalta Utilities Corporation
- Application Number
- 840837
- Title
- Decision on proceeding to amend approval HE 8312 held by Alberta Power Ltd. electric generation expansion 1986-1991 Sheerness and Genesee power plants
- Date
- 1985
- Title
- Decision on proceeding to amend approval HE 8312 held by Alberta Power Ltd. electric generation expansion 1986-1991 Sheerness and Genesee power plants
- Date
- 1985
- Application Number
- 840837
- Hearing Panel
- Millard V
- Goodman CJ
- Mink FJ
- Hearing Type
- Board
- Utilities
- Category
- Electric power
- Descriptors
- Electric power generation
- Electric power project
- Genesee power plant
- Sheerness power plant
- Capacity
- Coal - fuel
- Cost analysis
- Electric power demand
- Expansion
- Forecasting
- Planning
- Power system interconnection
- Socio-economic effect
- Notes
- ERCB Decision D85-21 on proceeding No. 840837 to review commissioning dates of the Sheerness and Genessee generating units in the 1986-1991 period in light of events which occurred after issuance of Decision D83-H; Board Hearing 1985-01-22/23/24/25/30
- Interveners
- Electric Utility Planning Council (EUPC)
- McAvity, EO
- Hanslip, G
- Gunn, J
- Taylor, W
- Valiant, R
- Alberta Power Limited
- Major, JC
- Provost, K
- Frey, JR
- Lake, G
- TransAlta Utilities Corporation
- Patterson, MH
- Hopkins, WJ
- Fraser, WL
- Crowe, T
- The City of Edmonton (Edmonton Power)
- Beames, JW
- Sherk, M
- Kyte, EF
- Pettican, A
- Wright, R
- Wright Mansell Research Ltd.
- The City of Calgary
- Goss, RF
- Larder, DA
- The City of Lethbridge
- Martin, E
- Industrial Power Consumers Association of Alberta (IPCAA)
- Curtis, R
- Clark, BW
- Fording Coal Limited
- Smith, JR
- Manalta Coal Limited
- Holgate, DA
- Portigal, L
- Decker, J
- Shaneman, R
- Luscar Limited
- MacDonald, M
- Smith, D
- Haddock, K
- Electrical Contractors Association of Alberta (ECAA)
- Soucy, GA
- Energy Chemical Workers Union
- Nielsen, R
- Coe, E
- Southern Alberta Building and Construction Trades (Southern Alberta)
- Pittman, PRJ
- Briegel, J
- Alberta and N.W.T. (Distirct of Mackenzie) Building and Construction Trades Council
- Garby, R
- INTEG - Intercontinental Engineering Ltd.
- Smith, MJ
- Cana Construction Co. Ltd.
- Dunlop, JD
- The County of Leduc No. 25
- Walter, EJ
- Pinkowski, K
- The Town of Hanna and District
- McLarty, AL
- Dookie, S
- Grover, A
- The Town of Calmar
- McCartney, G
- The Village of Warburg
- Haggerty, D
- The Village of Thorsby
- Bacsik, L
- Senio, B
- The Village of Breton
- Hilker, JD
- Edmonton Economic Development Authority
- Bleiken, AG
- Battle River Regional Planning Commission
- Scerbak, G
- Fenwick, PD
- Alberta Wind Power Associates
- Otis, J
Decision 88-02
https://had.aer.ca/link/decision192
- Applicant
- Southview Fibre Tech Ltd.
- Application Number
- 871411
- Title
- Decision on application by Southview Fibre Tech Ltd., 1988 (wood waste power plant Calling Lake area)
- Date
- 1988
- Title
- Decision on application by Southview Fibre Tech Ltd., 1988 (wood waste power plant Calling Lake area)
- Date
- 1988
- Applicant
- Southview Fibre Tech Ltd.
- Application Number
- 871411
- Hearing Panel
- Goodman CJ
- Mink FJ
- MacDonald NW
- Hearing Type
- Board
- Utilities
- Category
- Electric power
- Descriptors
- Calling Lake area
- Electric power generation
- Industrial plant
- Non-utility generation
- Wood waste
- Cost analysis
- Electric power demand
- Electric power rate
- Forecasting
- NTS 83I
- Power system interconnection
- Legal References
- Hydro and Electric Energy Act S17
- Notes
- Decision D88-02 on application No. 871411 for approval to connect a 30-MW wood burning power plant with the electric system of TransAlta Utilities and to establish the basis for determining the price of power and energy to be sold to TransAlta Utilities.
- Interveners
- County of Athabasca # 12
- TransAlta Utilities Corporation
- Alberta Power Limited
- Industrial Power Consumers Association
- City of Edmonton
- City of Calgary
- City of Red Deer
- City of Lloydminister
Decision 88-A
https://had.aer.ca/link/decision193
- Applicant
- Energy Resources Conservation Board
- Public Utilities Board
- Application Number
- 870621
- Title
- Small power inquiry
- Date
- 1988
- Title
- Small power inquiry
- Date
- 1988
- Application Number
- 870621
- Hearing Panel
- Goodman CJ
- Mink FJ
- Hetherington TD
- Dunstan JR
- Hearing Type
- Board
- Utilities
- Category
- Inquiry
- Electric power
- Descriptors
- Electric power distribution
- Electric power generation
- Electric power rate
- Non-utility generation
- Power system interconnection
- Renewable energy source
- Wind power
- Wind power generation
- Electric utility
- Energy policy
- Rate (cost)
- Regulation
- Notes
- ERCB report 88-A (PUB report E88001) on proceeding No. 870621 at the direction of the Lieutenant Governor in Council; inquiry held 1987-10-05 through 1987-10-16
Decision 90-01
https://had.aer.ca/link/decision100
- Applicant
- Energy Resources Conservation Board
- Alberta Power Limited
- City of Edmonton
- TransAlta Utilities Corporation
- Application Number
- 890963
- Title
- Decision 90-01 : TransAlta Utilities Corporation : Application for an Alberta Power Ltd Board proceeding to review electric generation planning parameters
- Date
- 1990
- Title
- Decision 90-01 : TransAlta Utilities Corporation : Application for an Alberta Power Ltd Board proceeding to review electric generation planning parameters
- Date
- 1990
- Applicant
- Energy Resources Conservation Board
- Alberta Power Limited
- City of Edmonton
- TransAlta Utilities Corporation
- Application Number
- 890963
- Hearing Panel
- Mink FJ
- Prince JP
- Morin EJ
- Hearing Type
- Board
- Utilities
- Category
- Electric power
- Descriptors
- Alberta interconnected system
- Cogeneration
- Electric power demand
- Electric power generation
- Electric power supply
- Resource management
- Alberta
- Forecasting
- Procedure
- Legal References
- Hydro and Electric Energy Act S4
- Notes
- Decision D90-01 on proceeding No. 890963 to review certain matters relating to generation capacity expansion planning for the Alberta interconnected system; public meeting held 1989-11-14/15/166
- Interveners
- The Industrial Power Consumers Association of Alberta
- The Canadian Petroleum Association
- The City of Calgary
- The City of Lethbridge
- The City of Medicine Hat
Decision 90-05
https://had.aer.ca/link/decision87
- Applicant
- City of Medicine Hat
- Application Number
- 891967
- Title
- Decision 90-05 : City of Medicine Hat : Application for power plant expansion
- Date
- 1990
- Title
- Decision 90-05 : City of Medicine Hat : Application for power plant expansion
- Date
- 1990
- Applicant
- City of Medicine Hat
- Application Number
- 891967
- Hearing Panel
- Strom NA
- Prince JP
- Evans RG
- Hearing Type
- Board
- Utilities
- Category
- Electric power
- Descriptors
- Electric power project
- Medicine Hat area
- Steam electric power generation
- Cost analysis
- Economic analysis
- Electric power demand
- Electric power supply
- Expansion
- Forecasting
- Gas turbine
- Natural gas - fuel
- Power system interconnection
- Legal References
- Hydro and Electric Energy Act S9
- Hydro and Electric Energy Act S17
- Notes
- Decision D90-05 on application No. 891967 for approvals to construct, connect & operate an expansion consisting of two 17-MW gas turbine driven generators and associated heat recovery boilers and one 30-MW steam turbine driven generator, to the City's existing power plant; ERCB hearing held 1990-04-17/18
- Interveners
- TransAlta Utilities Corporation
- Alberta Power Limited
- The City of Edmonton/Edmonton Power
- The City of Calgary
- The City of Red Deer
- The City of Lethbridge
- Industrial Power Consumers
- Medicine Hat and District Chamber of Commerce
- Medicine Hat and District Labour Council
- Medicine Hat Industrial Group
- Municipal District of Cypress No.1
- Town of Redcliff
- Approval
- Denied
Decision 90-18
https://had.aer.ca/link/decision74
- Applicant
- City of Medicine Hat
- Application Number
- 901544
- Title
- Decision 90-18 : City of Medicine Hat : Application for a power plant expansion
- Date
- 1990
- Title
- Decision 90-18 : City of Medicine Hat : Application for a power plant expansion
- Date
- 1990
- Applicant
- City of Medicine Hat
- Application Number
- 901544
- Hearing Type
- Board
- Utilities
- Category
- Electric power
- Descriptors
- Electric power project
- Medicine Hat area
- Steam electric power generation
- Decision D1990-5
- Electric power demand
- Electric power supply
- Expansion
- Forecasting
- Gas turbine
- Natural gas - fuel
- Power system interconnection
- Notes
- Decision D90-18 on application No. 901544 for approval to construct, connect and operate an expansion to the City's existing power plant; the expansion would consist of two 17-MW gas turbine driven generators and associated heat recovery boilers for operation by the fall of 1993, and one 30-MW steam turbine driven generator to be installed by 1996; also requested permission to immediately install one gas turbine unit to conduct acceptance tests; ERCB hearing held 1990-04-17/18
Decision 94-04
https://had.aer.ca/link/decision2519
- Applicant
- Baloil Resources Ltd.
- Application Number
- 931409
- Title
- Examiner report on application by Baloil Resources Ltd., 1994 (Zama Lake power plant)
- Date
- 1994
- Title
- Examiner report on application by Baloil Resources Ltd., 1994 (Zama Lake power plant)
- Date
- 1994
- Applicant
- Baloil Resources Ltd.
- Application Number
- 931409
- Hearing Panel
- Prince JP
- Evans RG
- Barfett AC
- Dunstan NJR
- Hearing Type
- Examiners
- Utilities
- Category
- Electric power
- Descriptors
- Electric power generation
- Electric power rate
- Non-utility generation
- Power system interconnection
- Zama Virgo basin
- Compensation
- Legal References
- Hydro and Electric Energy Act S17
- Notes
- ERCB decision D94-7 and examiners report E94-4 on application no. 931409 to order Alberta Power to connect with and take the electric energy generated by Baloil's proposed power plant at Zama Lake; to establish terms and conditions for determining the basis for payment of compensation by APL for the electric power that would be generated; and adopt the views and recommendations in the ERCB/PUB Small Power Inquiry Report as the basis for setting compensation; and to determine the amount of compensation payable for the electric power that would be generated and set the price for that energy at 4.7 cents per kWh; Concurrent ERCB/PUB hearing 1994-02-08
- Interveners
- Alberta Power Limited
- The City of Lethbridge
- The Town of Fort MacLeod
- TransAlta Utilities Corporation
- Industrial Power Consumers Association
- Municipal Intervenors
- City of Calgary
- Edmonton Power
- Alberta Cogenerators Council
Decision 94-07
https://had.aer.ca/link/decision2520
- Applicant
- Baloil Resources Ltd.
- Application Number
- 931409
- Title
- Decision 94-07 : Baloil Resources Ltd.: Application for a Zama Lake power plant
- Date
- 1994
- Title
- Decision 94-07 : Baloil Resources Ltd.: Application for a Zama Lake power plant
- Date
- 1994
- Applicant
- Baloil Resources Ltd.
- Application Number
- 931409
- Hearing Panel
- Prince JP
- Evans RG
- Barfett AC
- Dunstan NJR
- Hearing Type
- Examiners
- Utilities
- Category
- Electric power
- Descriptors
- Electric power generation
- Electric power rate
- Non-utility generation
- Power system interconnection
- Zama Virgo basin
- Compensation
- Legal References
- Hydro and Electric Energy Act S17
- Notes
- ERCB decision D94-7 and examiners report E94-4 on application no. 931409 to order Alberta Power to connect with and take the electric energy generated by Baloil's proposed power plant at Zama Lake; to establish terms and conditions for determining the basis for payment of compensation by APL for the electric power that would be generated; and adopt the views and recommendations in the ERCB/PUB Small Power Inquiry Report as the basis for setting compensation; and to determine the amount of compensation payable for the electric power that would be generated and set the price for that energy at 4.7 cents per kWh; Concurrent ERCB/PUB hearing 1994-02-08
- Interveners
- Alberta Power Limited
- The City of Lethbridge
- The Town of Fort Macleod
- TransAlta Utilities Corporation
- Industrial Power Consumers Association of Alberta
- Municipal Intervenors
- City of Calgary
- Edmonton Power
- Alberta Cogenerators Council
- Independent Power Producers Society of Alberta
Decision 99-04
https://had.aer.ca/link/decision3041
- Applicant
- Imperial Oil Resources Limited
- Application Number
- 970488
- Title
- Decision 99-04: Imperial Oil Resources Limited industrial system designation Cold Lake Expansion Project
- Date
- 1999
- Title
- Decision 99-04: Imperial Oil Resources Limited industrial system designation Cold Lake Expansion Project
- Date
- 1999
- Applicant
- Imperial Oil Resources Limited
- Application Number
- 970488
- Hearing Panel
- Belanger C
- Miller GJ
- Mink FJ
- Hearing Type
- Board
- Utilities
- Category
- Electric power
- Descriptors
- Cogeneration
- Cold Lake heavy oil project
- Electric power generation
- Electric power transmission
- Industrial plant
- Power system interconnection
- Legal References
- Electric Utilities Act S2
- Electric Utilities Act S73
- Hydro and Electric Energy Act S1
- Hydro and Electric Energy Act S2
- Hydro and Electric Energy Act S12
- Hydro and Electric Energy Act S14
- Hydro and Electric Energy Act S17
- Notes
- EUB Decision D99-04 on application 970488 to designate Imperial's new electrical generation, transmission, and distribution systems serving its Cold Lake operations as an "industrial system"; and make rules exempting from the operation of the Electric Utilities Act, electric energy produced from and consumed by the proposed "industrial system", pursuant to section 73(4) of the Electric Utilities Act;
- Interveners
- Alberta Power Limited
- ENMAX Corporation
- Industrial Power Consumers Association of Alberta
- TransAlta Energy
- TransAlta Utilities
- Independent Power Producers Society of Alberta And Senior Petroleum Producers Association of Alberta
- NOVA Chemicals Limited
- ESBI Alberta Limited
- Alberta Federation of REAs Limited
- Alberta Association of Municipal Districts and Counties And Public Institutional Consumers Association
Decision 99-22
https://had.aer.ca/link/decision3097
- Applicant
- Imperial Oil Resources Limited
- Application Number
- 970163
- Title
- Decision 99-22: Application to amend Approval No. 3950 Imperial Oil Resources Limited, Cold Lake Production Project, Mahkeses Development
- Date
- 1999
- Title
- Decision 99-22: Application to amend Approval No. 3950 Imperial Oil Resources Limited, Cold Lake Production Project, Mahkeses Development
- Date
- 1999
- Applicant
- Imperial Oil Resources Limited
- Application Number
- 970163
- Hearing Panel
- Mink FJ
- Miller GJ
- Dilay JD
- Hearing Type
- Board
- Utilities
- Category
- Oil sands
- Electric power
- Descriptors
- Arsenic
- Bitumen
- Clearwater Fm
- Cogeneration
- Cold Lake heavy oil project
- Cyclic steam injection
- Electric power generation
- Electric power project
- Formation evaluation
- Mahkeses development
- Legal References
- Hydro and Electric Energy Act S9
- Oil Sands Conservation Act S14
- Notes
- EUB Decision D99-22 on application 970163 concerning Imperial Oil's application under Section 14 of the Oil Sands Conservation Act to amend Approval No. 3950 to allow for an expansion of its Cold Lake commercial project and under Section 9 of the Hydro and Electric Energy Act to construct and operate an electrical power plant.
- Board Hearing (Calgary): 1998-11-30 to 1998-12-03; 1998-12-07 to 1998-12-11; 1998-12-14 to 1998-12-16; 1999-01-05
- Interveners
- Axell SA
- Cold Lake First Nations
- Francis M
- Geoph P
- Gibeault B
- Marie Lake Landowners Association (MLLA)
- Martin H
- Nriagu JO
- Nyland E
- Pernarowski C
- Pernarowski R
- Piche M
- Reddecliff E
- Savard D
- Scannie (Chief - First Nations)
- Stop and Tell Our Politicians (STOP)
- Ulfsten SA
- Weyer U
- Wilde R
Decision 2000-14
https://had.aer.ca/link/decision3156
- Applicant
- TransAlta Utilities Corporation
- Application Number
- 990616
- file 5601-15
- Title
- Decision 2000-14 : TransAlta Utilities Corporation temporary suspension regulation
- Date
- 2000
- Title
- Decision 2000-14 : TransAlta Utilities Corporation temporary suspension regulation
- Date
- 2000
- Applicant
- TransAlta Utilities Corporation
- Application Number
- 990616
- file 5601-15
- Hearing Panel
- McManus BT
- Miller GJ
- Asgar-Deen ML
- Hearing Type
- Board
- Utilities
- Category
- Electric power rate
- Descriptors
- Electric power generation
- Legal References
- Electric Utilities Act S34
- Electric Utilities Temporary Suspension Regulation S4
- Notes
- EUB Decision D2000-14 on application by TransAlta requesting interim relief from unit obligation value payments to Keephills 1 & 2 generating unitsas per Temporary Suspension Regulation Alberta Regulation 284/95
- Approval
- Approved
Decision 2000-27
https://had.aer.ca/link/decision3214
- Applicant
- ESBI Alberta Ltd.
- Application Number
- 990005
- Title
- Decision 2000-27: ESBI Alberta Ltd. 1999/2000 tariff application refiling - part D : line losses calculation methodology
- Date
- 2000
- Title
- Decision 2000-27: ESBI Alberta Ltd. 1999/2000 tariff application refiling - part D : line losses calculation methodology
- Date
- 2000
- Applicant
- ESBI Alberta Ltd.
- Application Number
- 990005
- Hearing Panel
- McManus BT
- Berg AJ
- MacDonald NW
- Hearing Type
- Utilities
- Category
- Electric power rate
- Descriptors
- Public utility
- Electric power rate
- Electric power generation
- General rate application
- Refiling
- Supply (economics)
- Decision D2000-01
- Notes
- Decision on tariff application refiling respecting lines losses calculation methodology