Decision 77-04
https://had.aer.ca/link/decision2144
- Applicant
- IPEX Oil and Gas Ltd.
- Application Number
- 9980
- Title
- Decision on application by IPEX Oil and Gas Ltd., 1977 (licence to drill a well in LS 14-36-26-1 W5M Crossfield and Airdrie areas)
- Date
- 1977
- Title
- Decision on application by IPEX Oil and Gas Ltd., 1977 (licence to drill a well in LS 14-36-26-1 W5M Crossfield and Airdrie areas)
- Date
- 1977
- Applicant
- IPEX Oil and Gas Ltd.
- Application Number
- 9980
- Hearing Panel
- Craig DR
- Millard V
- DeSorcy GJ
- Hearing Type
- Board
- Category
- Well licence
- Descriptors
- Airdrie area
- Sour gas
- Well licence
- Emergency procedure
- Gas producing
- Gas well
- Hydrogen sulphide
- Isopach map
- Land use
- Locating
- NTS 82O
- Safety
- Turner Valley Fm
- Urban development
- Notes
- Decision 77-4 on application No. 9980 to drill the well, Ipex Czar et al Cross 14-36-26-1 (W5M), to produce gas from Elkton member of the Turner Valley formation; Board hearing 1977-02-23/24
- Interveners
- Town of Airdrie
- Nu-West Development Corporation
- Calgary Regional Planning Commission
- Cooper, G.S.
- Cirrus Land Corporation Ltd.
- Location
- 14-36-026-01W5
Decision 80-22
https://had.aer.ca/link/decision2017
- Applicant
- Energy Resources Conservation Board
- Application Number
- 800369
- Title
- Decision on application by Tebb (Mr. A.C. Tebb), 1980 (138 KV substation - Airdrie area)
- Date
- 1980
- Title
- Decision on application by Tebb (Mr. A.C. Tebb), 1980 (138 KV substation - Airdrie area)
- Date
- 1980
- Applicant
- Energy Resources Conservation Board
- Application Number
- 800369
- Hearing Panel
- DeSorcy GJ
- Bohme VE
- Bray JA
- Hearing Type
- Board
- Utilities
- Category
- Electric power
- Legal References
- Hydro and Electric Energy Act S13
- Notes
- Decision 80-22 on application No. 800369 by Mr. A.C. Tebb to relocate the Calgary power Ltd. east Airdrie substation CP 199S from its presently approved location in section 14-27-29 W4M to either of 2 locations in the east Airdrie industrial park; Board hearing 1980-09-03/04
- Interveners
- Tebb, A.C.
- Calgary Power Ltd.
- G.I.C. Industries Ltd.
- Woodland Properties Ltd.
- Burnco Industries Ltd.
- Don Beddoes Construction ltd.
- Comanche Drilling Ltd.
- Hamilton, H.A.
Decision 81-10
https://had.aer.ca/link/decision1757
- Applicant
- Calgary Power Ltd.
- Application Number
- 810159
- Title
- Examiners report on application by Calgary Power Ltd., 1981 (138 KV transmission line east Airdrie - Turbo)
- Date
- 1981
- Title
- Examiners report on application by Calgary Power Ltd., 1981 (138 KV transmission line east Airdrie - Turbo)
- Date
- 1981
- Applicant
- Calgary Power Ltd.
- Application Number
- 810159
- Hearing Panel
- Bray JA
- Fox EG
- Remmer WG
- Hearing Type
- Examiners
- Utilities
- Category
- Transmission line
- Descriptors
- Airdrie area
- Electric substation
- Transmission line
- Electric power demand
- Gas processing plant
- Land value
- NTS 82P
- Oil refinery
- Route selection
- Legal References
- Hydro and Electric Energy Act S9
- Hydro and Electric Energy Act S11
- Hydro and Electric Energy Act S14
- Hydro and Electric Energy Act S15
- Notes
- ERCB Examiners report No. E81-10 on application No. 810159 to construct and operate a 138 KV line (No. CP 752L) from east Airdrie substation (No. CP 199S) to proposed Turbo substation (No. CP 391S) (TP.25-27, R.28-29, W4M).
- Interveners
- Town of Airdrie
- Matlock, J.E.
- Comanche Drilling Ltd.
- Turbo Resources Limited
- Goerlitz, A.
- DeWaal, H.
- Tebb, C.
- Armada Builders Ltd.
- Qualico Developments
Decision 82-34
https://had.aer.ca/link/decision1118
- Applicant
- TransAlta Utilities Corporation
- Application Number
- 820875
- Title
- Examiners report on application by TransAlta Utilities Corporation, 1982 (240/138 KV Crossfield substation CP 64S)
- Date
- 1982
- Title
- Examiners report on application by TransAlta Utilities Corporation, 1982 (240/138 KV Crossfield substation CP 64S)
- Date
- 1982
- Applicant
- TransAlta Utilities Corporation
- Application Number
- 820875
- Hearing Panel
- Pow JR
- Homeniuk TF
- Paterson RG
- Hearing Type
- Examiners
- Utilities
- Category
- Electric power
- Descriptors
- Crossfield Airdrie area
- Electric substation
- Capacity
- Electric power demand
- Expansion
- Noise (sound)
- Pollution
- Reliability
- Legal References
- Hydro and Electric Energy Act S12
- Hydro and Electric Energy Act S14
- Hydro and Electric Energy Act S16
- Hydro and Electric Energy Act S17
- Hydro and Electric Energy Act S20
- Notes
- ERCB Examiners report E82-34 on application No. 820875 to expand & operate Crossfield substation 64S.
- Interveners
- Sackett, K.G.
Decision 83-17
https://had.aer.ca/link/decision2316
- Applicant
- ICG Resources Ltd.
- Canadian Occidental Petroleum Ltd.
- Petrogas Processing Ltd.
- Application Number
- 830165
- 830166
- 830167
- 830460
- 830461
- 830488
- 830489
- Title
- Decision on application by ICG Resources Ltd., 1983 (to drill well and construct pipelines in Crossfield Airdrie area); Decision on application by Canadian Occidental Petroleum Ltd., 1983 (special drilling spacing unit and licence to drill a well in Crossfield Airdrie area); Decision on application by Petrogas Processing Ltd., 1983 (to construct two pipelines in Crossfiled Airdrie area) 1983
- Date
- 1983
- Title
- Decision on application by ICG Resources Ltd., 1983 (to drill well and construct pipelines in Crossfield Airdrie area); Decision on application by Canadian Occidental Petroleum Ltd., 1983 (special drilling spacing unit and licence to drill a well in Crossfield Airdrie area); Decision on application by Petrogas Processing Ltd., 1983 (to construct two pipelines in Crossfiled Airdrie area) 1983
- Date
- 1983
- Application Number
- 830165
- 830166
- 830167
- 830460
- 830461
- 830488
- 830489
- Hearing Panel
- DeSorcy GJ
- Strom NA
- Bellows LA
- Hearing Type
- Board
- Category
- Well licence
- Descriptors
- Crossfield Airdrie area
- Crossfield East field
- Drilling spacing unit
- Fuel gas pipeline
- Gas pipeline
- Gathering line
- Pipeline construction permit
- Sour gas
- Well licence
- Blowout control
- Blowout preventer
- Design criteria
- Emergency procedure
- Equity
- ID-81-03
- ID-OG-76-02
- Gas producing
- Geologic interpretation
- Hydrogen sulphide
- NTS 82O
- NTS 82P
- Pipeline route
- Route selection
- Safety
- Target area
- Wabamun Gp
- Legal References
- Oil and Gas Conservation Regulations S2.020
- Oil and Gas Conservation Regulations S4.020
- Oil and Gas Conservation Regulations S4.050
- Pipeline Act
- Notes
- Decision on application No. 830167 by ICG to drill a well on application No. 830165 by ICG to construct sweet fule gas pipeline to the well, on application No. 830166 by ICG to construct sour gas pipeline to tie well into existing Canoxy gas gathering system on application No. 830461 by Canoxy for a special drilling spacing unit and on application No. 830460 by Canoxy to drill a well, on application No. 830488 by Petrogas for sour gas pipeline proposed well to existing Canoxy gathering system and application No. 830489 by Petrogas to construct sweet fuel gas pipeline to the well sites (all in TP.27, R.28 W4 to R.1 W5)
- Interveners
- Austin Exploration Ltd.
- Associated Engineering Services Ltd.
- Fletcher, A.T.
- Fletcher, H.
Decision 2012-05
https://had.aer.ca/link/decision4480
- Applicant
- Kallisto Energy Corporation
- Application Number
- 1697898
- Title
- Decision 2012-005 : Kallisto Energy Corp. application for a well licence Crossfield East Field
- Date
- 2012
- Title
- Decision 2012-005 : Kallisto Energy Corp. application for a well licence Crossfield East Field
- Date
- 2012
- Applicant
- Kallisto Energy Corporation
- Application Number
- 1697898
- Hearing Panel
- McManus RC
- Eynon G
- Warren WA
- Hearing Type
- Board
- Category
- Well licence
- Descriptors
- Communication (well)
- Emergency response plan
- Emergency procedure
- Airdrie area
- Basal Quartz FM
- Hydrogen sulphide
- Well licence
- Position (location)
- Legal References
- Oil and Gas Conservation Regulations S2.020
- 2012 ABERCB 005
- Notes
- Change to legal citation effective January 2011
- Interveners
- CrossAlta Gas Storate & Service
- BP Canada Energy
- BPCanada Energy Company
- GransCanaada Pipelines Limited
- Approval
- Approved with conditions
- Conditions
- CONDITIONS
- The licensee must obtain and immediately submit stabilized initial pressure data to the ERCB and CrossAlta.
- The licensee must not use fracture stimulation on the well that exceeds 40 tonnes unless consent has been given by the Board.
- The licensee must obtain and submit stabilized pre- and post-frac pressure data to the ERCB and CrossAlta.
- Location
- 11-26-027-01W5
Decision 2013-13
https://had.aer.ca/link/decision4510
- Applicant
- Kallisto Energy Corp.
- Application Number
- 1735722
- Title
- Decision 2013-013 : Kallisto Energy Corp. application for a well licence Crossfield East field
- Date
- 2013
- Title
- Decision 2013-013 : Kallisto Energy Corp. application for a well licence Crossfield East field
- Date
- 2013
- Applicant
- Kallisto Energy Corp.
- Application Number
- 1735722
- Hearing Panel
- Watson TL
- McManus BT
- Eynon G
- Hearing Type
- Board
- Category
- Well licence
- Storage facility
- Descriptors
- Well licence
- Crude oil
- Elkton FM
- Hydrogen sulphide
- Emergency response plan
- Airdrie area
- Land use
- Risk
- Gas storage
- Legal References
- Oil and Gas Conservation Regulations S2.020
- Responsible Energy Development Act (REDA)
- Oil and Gas Conservation Regulations S7.001
- Notes
- Change to legal citation effective January 2011
- Interveners
- CrossAlta Gas Storage & Service Ltd.
- TransCanada Pipelines Ltd.
- TransCanada Energy Ltd
- Taks M
- Verbeurgt K
- Approval
- Approved with conditions
- Conditions
- CONDITIONS Drilling and Completion 1) Kallisto must not fracture stimulate the 16-26 well. 2) Kallisto must a) run an initial full-length cement integrity log before completion. b) conduct a hydraulic isolation log after completion and stimulation Abandonment 3) Kallisto must a) for open hole abandonment, run a continuous cement plug from total depth to a minimum of 30 metres above the top of the Elkton Formation. The cement plug top must be confirmed by tagging, not logging. b) in the event that the well is cased, completed, and abandoned, conduct a cement squeeze of the perforated interval and fill the casing with cement to a minimum of 15 metres above the top of the Elkton Formation. If future well abandonment requirements exceed these conditions, the more stringent requirements will apply. Measurement 4) Kallisto must a) submit an initial pressure test completed in accordance with Directive 040: Pressure and Deliverability Testing Oil and Gas Wells. b) install a three phase separator to separate the gas, emulsion, and water before commingling with other well effluent. c) install appropriate measurement devices to measure the three phases according to the delivery point requirements in Directive 017: Measurement Requirements for Oil and Gas Operations, except for water measurement. d) approve, inspect, and calibrate the measurement devices according to the delivery point requirements in Directive 017: Measurement Requirements for Oil and Gas Operations, except for water measurement. e) install continuous sampling devices for the gas phase after separation according to requirements in Directive 017: Measurement Requirements for Oil and Gas Operations and analyze the gas sample once every two weeks, at a minimum. f) install proportional sampling devices to determine the water cut at least once per week for the emulsion phase according to requirements in Directive 017: Measurement Requirements for Oil and Gas Operations or install a continuous water-cut analyzer. g) ensure the well head separator does not have an operating pressure greater than 4200 kPa (600 psi). Disclosure of Confidential Information 5) Kallisto must provide all confidential information related to the 16-26 well to CrossAlta and the Freehold mineral owners (Jensen and Taks families). Production Reporting 6) Kallisto must report any production from the 16-26 well to PETRINEX as a single oil well battery. 2013
- Location
- 16-26-027-01W5
Decision E62-(p.001)
https://had.aer.ca/link/decision996
- Applicant
- Energy Resources Conservation Board
- Application Number
- 712
- Title
- Examiners report on a proposal by the Board staff regarding well spacing in the Crossfield - Calgary area, 1962
- Date
- 1962
- Title
- Examiners report on a proposal by the Board staff regarding well spacing in the Crossfield - Calgary area, 1962
- Date
- 1962
- Applicant
- Energy Resources Conservation Board
- Application Number
- 712
- Hearing Panel
- Craig DR
- Bohme VE
- Hearing Type
- Examiners
- Category
- Spacing
- Descriptors
- Spacing unit
- Well spacing
- Cardium Fm
- Allowable production
- Crossfield Airdrie area
- NTS 82J
- Oil producing
- Notes
- Examiners report on application proposing that for a two year period commencing February 1, 1962, the spacing for oil wells in the Cardium FM within A designated area be one half section; the target area would be beneath either LSD 6 or 16; Examiners approve the application.
Decision E78-(p.176)
https://had.aer.ca/link/decision1093
- Applicant
- Bow Valley Industries Ltd.
- Application Number
- 770877
- 770878
- Title
- Examiners report on application by Bow Valley Industries Limited, 1978 (construction of sour natural gas pipelines, Airdrie area)
- Date
- 1978
- Title
- Examiners report on application by Bow Valley Industries Limited, 1978 (construction of sour natural gas pipelines, Airdrie area)
- Date
- 1978
- Applicant
- Bow Valley Industries Ltd.
- Application Number
- 770877
- 770878
- Hearing Panel
- Bellows LA
- Antonio HA
- Fox EG
- Hearing Type
- Examiners
- Category
- Pipelines
- Descriptors
- Airdrie area
- Gas pipeline
- Pipeline construction permit
- Sour gas
- Notes
- ERCB Examiners report on application No. 770878 by Bow Valley Industries Ltd. for the construction of secondary sour natural gas lines which are the gathering system for wells in LSD 7-34-26-1 W5M, LSD 11-35-26-1 W5M, and LSD 6-2-27-1 W5M to the point of connection with gas line in LSD 11-35-26-1 W5M; application No. 770877 for the construction of gas line for the transmission of sour natural gas from LSD 11-35-26-1 W5M to a point in LSD 16-34-25-29 W4M; Examiners hearing 1978-03-28 & 1978-05-23.
- Interveners
- Amoco Canada Petroleum Company Ltd.
- Petrogas Processing Ltd.
- Town of Airdrie
- Bonner, L.G.
- Bonner, D.E.
- Church, B.C.
- Church, A.W.
- Church, C.G.
- Chruch, R.
- Cooper, G.S.
- Cook, K.
- Chitwood, H.
- Doherty, K.C.
- Farries, J.K.
- Harry Yamamoto Holdings Ltd.
- Melcor Developments Ltd.
- Morden, C.R. and Family
- Nixon, B.R.
- Nixon, C.
- Nu-West Corporation Ltd.
- Reynolds, F.S.
- Adina Holdings
Decision E79-(p.110)
https://had.aer.ca/link/decision1767
- Applicant
- Calgary Power Ltd.
- Application Number
- 790247
- Title
- Examiners report on application by Calgary Power Ltd., 1979 (138 KV transmission line CP 752L)
- Date
- 1979
- Title
- Examiners report on application by Calgary Power Ltd., 1979 (138 KV transmission line CP 752L)
- Date
- 1979
- Applicant
- Calgary Power Ltd.
- Application Number
- 790247
- Hearing Panel
- Homeniuk TF
- Antonio HA
- Yu JNG
- Hearing Type
- Examiners
- Utilities
- Category
- Transmission line
- Descriptors
- Airdrie area
- Crossfield Airdrie area
- Electric substation
- Transmission line
- Electric power demand
- Locating
- NTS 82O
- NTS 82P
- Route selection
- Legal References
- Hydro and Electric Energy Act S9
- Hydro and Electric Energy Act S11
- Hydro and Electric Energy Act S13
- Hydro and Electric Energy Act S14
- Hydro and Electric Energy Act S17
- Notes
- ERCB Examiners report on application No. 790247 to construct & operate a 138 KV transmission line in the Airdrie-Crossfield area and a substation near Airdrie (TP.27-29, R.28-29, W4M); permit and licence No. CP 79-51 and No. CP 79-52
- Interveners
- Hawkey, C.
- Hawkey, M.
- Shaftsbury Management Ltd.
- Hamilton, H.
- MacDonald, W.
- Fletcher, A.
- Carlson, B.
- Tebb, A.C.
- Kalmbach, R.
- Garland, A.
- Lubbers, W.
- Hamilton Group