10 records – page 1 of 1.

Decision 77-04

https://had.aer.ca/link/decision2144
Applicant
IPEX Oil and Gas Ltd.
Application Number
9980
Title
Decision on application by IPEX Oil and Gas Ltd., 1977 (licence to drill a well in LS 14-36-26-1 W5M Crossfield and Airdrie areas)
Date
1977
Title
Decision on application by IPEX Oil and Gas Ltd., 1977 (licence to drill a well in LS 14-36-26-1 W5M Crossfield and Airdrie areas)
Date
1977
Applicant
IPEX Oil and Gas Ltd.
Application Number
9980
Hearing Panel
Craig DR
Millard V
DeSorcy GJ
Hearing Type
Board
Category
Well licence
Descriptors
Airdrie area
Sour gas
Well licence
Emergency procedure
Gas producing
Gas well
Hydrogen sulphide
Isopach map
Land use
Locating
NTS 82O
Safety
Turner Valley Fm
Urban development
Notes
Decision 77-4 on application No. 9980 to drill the well, Ipex Czar et al Cross 14-36-26-1 (W5M), to produce gas from Elkton member of the Turner Valley formation; Board hearing 1977-02-23/24
Interveners
Town of Airdrie
Nu-West Development Corporation
Calgary Regional Planning Commission
Cooper, G.S.
Cirrus Land Corporation Ltd.
Location
14-36-026-01W5
Less detail

Decision 80-22

https://had.aer.ca/link/decision2017
Applicant
Energy Resources Conservation Board
Application Number
800369
Title
Decision on application by Tebb (Mr. A.C. Tebb), 1980 (138 KV substation - Airdrie area)
Date
1980
Title
Decision on application by Tebb (Mr. A.C. Tebb), 1980 (138 KV substation - Airdrie area)
Date
1980
Applicant
Energy Resources Conservation Board
Application Number
800369
Hearing Panel
DeSorcy GJ
Bohme VE
Bray JA
Hearing Type
Board
Utilities
Category
Electric power
Descriptors
Airdrie area
Electric substation
Relocation
Land value
Locating
Urban development
Legal References
Hydro and Electric Energy Act S13
Notes
Decision 80-22 on application No. 800369 by Mr. A.C. Tebb to relocate the Calgary power Ltd. east Airdrie substation CP 199S from its presently approved location in section 14-27-29 W4M to either of 2 locations in the east Airdrie industrial park; Board hearing 1980-09-03/04
Interveners
Tebb, A.C.
Calgary Power Ltd.
G.I.C. Industries Ltd.
Woodland Properties Ltd.
Burnco Industries Ltd.
Don Beddoes Construction ltd.
Comanche Drilling Ltd.
Hamilton, H.A.
Less detail

Decision 81-10

https://had.aer.ca/link/decision1757
Applicant
Calgary Power Ltd.
Application Number
810159
Title
Examiners report on application by Calgary Power Ltd., 1981 (138 KV transmission line east Airdrie - Turbo)
Date
1981
Title
Examiners report on application by Calgary Power Ltd., 1981 (138 KV transmission line east Airdrie - Turbo)
Date
1981
Applicant
Calgary Power Ltd.
Application Number
810159
Hearing Panel
Bray JA
Fox EG
Remmer WG
Hearing Type
Examiners
Utilities
Category
Transmission line
Descriptors
Airdrie area
Electric substation
Transmission line
Electric power demand
Gas processing plant
Land value
NTS 82P
Oil refinery
Route selection
Legal References
Hydro and Electric Energy Act S9
Hydro and Electric Energy Act S11
Hydro and Electric Energy Act S14
Hydro and Electric Energy Act S15
Notes
ERCB Examiners report No. E81-10 on application No. 810159 to construct and operate a 138 KV line (No. CP 752L) from east Airdrie substation (No. CP 199S) to proposed Turbo substation (No. CP 391S) (TP.25-27, R.28-29, W4M).
Interveners
Town of Airdrie
Matlock, J.E.
Comanche Drilling Ltd.
Turbo Resources Limited
Goerlitz, A.
DeWaal, H.
Tebb, C.
Armada Builders Ltd.
Qualico Developments
Less detail

Decision 82-34

https://had.aer.ca/link/decision1118
Applicant
TransAlta Utilities Corporation
Application Number
820875
Title
Examiners report on application by TransAlta Utilities Corporation, 1982 (240/138 KV Crossfield substation CP 64S)
Date
1982
Title
Examiners report on application by TransAlta Utilities Corporation, 1982 (240/138 KV Crossfield substation CP 64S)
Date
1982
Applicant
TransAlta Utilities Corporation
Application Number
820875
Hearing Panel
Pow JR
Homeniuk TF
Paterson RG
Hearing Type
Examiners
Utilities
Category
Electric power
Descriptors
Crossfield Airdrie area
Electric substation
Capacity
Electric power demand
Expansion
Noise (sound)
Pollution
Reliability
Legal References
Hydro and Electric Energy Act S12
Hydro and Electric Energy Act S14
Hydro and Electric Energy Act S16
Hydro and Electric Energy Act S17
Hydro and Electric Energy Act S20
Notes
ERCB Examiners report E82-34 on application No. 820875 to expand & operate Crossfield substation 64S.
Interveners
Sackett, K.G.
Less detail

Decision 83-17

https://had.aer.ca/link/decision2316
Applicant
ICG Resources Ltd.
Canadian Occidental Petroleum Ltd.
Petrogas Processing Ltd.
Application Number
830165
830166
830167
830460
830461
830488
830489
Title
Decision on application by ICG Resources Ltd., 1983 (to drill well and construct pipelines in Crossfield Airdrie area); Decision on application by Canadian Occidental Petroleum Ltd., 1983 (special drilling spacing unit and licence to drill a well in Crossfield Airdrie area); Decision on application by Petrogas Processing Ltd., 1983 (to construct two pipelines in Crossfiled Airdrie area) 1983
Date
1983
Title
Decision on application by ICG Resources Ltd., 1983 (to drill well and construct pipelines in Crossfield Airdrie area); Decision on application by Canadian Occidental Petroleum Ltd., 1983 (special drilling spacing unit and licence to drill a well in Crossfield Airdrie area); Decision on application by Petrogas Processing Ltd., 1983 (to construct two pipelines in Crossfiled Airdrie area) 1983
Date
1983
Applicant
ICG Resources Ltd.
Canadian Occidental Petroleum Ltd.
Petrogas Processing Ltd.
Application Number
830165
830166
830167
830460
830461
830488
830489
Hearing Panel
DeSorcy GJ
Strom NA
Bellows LA
Hearing Type
Board
Category
Well licence
Descriptors
Crossfield Airdrie area
Crossfield East field
Drilling spacing unit
Fuel gas pipeline
Gas pipeline
Gathering line
Pipeline construction permit
Sour gas
Well licence
Blowout control
Blowout preventer
Design criteria
Emergency procedure
Equity
ID-81-03
ID-OG-76-02
Gas producing
Geologic interpretation
Hydrogen sulphide
NTS 82O
NTS 82P
Pipeline route
Route selection
Safety
Target area
Wabamun Gp
Legal References
Oil and Gas Conservation Regulations S2.020
Oil and Gas Conservation Regulations S4.020
Oil and Gas Conservation Regulations S4.050
Pipeline Act
Notes
Decision on application No. 830167 by ICG to drill a well on application No. 830165 by ICG to construct sweet fule gas pipeline to the well, on application No. 830166 by ICG to construct sour gas pipeline to tie well into existing Canoxy gas gathering system on application No. 830461 by Canoxy for a special drilling spacing unit and on application No. 830460 by Canoxy to drill a well, on application No. 830488 by Petrogas for sour gas pipeline proposed well to existing Canoxy gathering system and application No. 830489 by Petrogas to construct sweet fuel gas pipeline to the well sites (all in TP.27, R.28 W4 to R.1 W5)
Interveners
Austin Exploration Ltd.
Associated Engineering Services Ltd.
Fletcher, A.T.
Fletcher, H.
Less detail

Decision 2012-05

https://had.aer.ca/link/decision4480
Applicant
Kallisto Energy Corporation
Application Number
1697898
Title
Decision 2012-005 : Kallisto Energy Corp. application for a well licence Crossfield East Field
Date
2012
Title
Decision 2012-005 : Kallisto Energy Corp. application for a well licence Crossfield East Field
Date
2012
Applicant
Kallisto Energy Corporation
Application Number
1697898
Hearing Panel
McManus RC
Eynon G
Warren WA
Hearing Type
Board
Category
Well licence
Descriptors
Communication (well)
Emergency response plan
Emergency procedure
Airdrie area
Basal Quartz FM
Hydrogen sulphide
Well licence
Position (location)
Legal References
Oil and Gas Conservation Regulations S2.020
2012 ABERCB 005
Notes
Change to legal citation effective January 2011
Interveners
CrossAlta Gas Storate & Service
BP Canada Energy
BPCanada Energy Company
GransCanaada Pipelines Limited
Approval
Approved with conditions
Conditions
CONDITIONS
The licensee must obtain and immediately submit stabilized initial pressure data to the ERCB and CrossAlta.
The licensee must not use fracture stimulation on the well that exceeds 40 tonnes unless consent has been given by the Board.
The licensee must obtain and submit stabilized pre- and post-frac pressure data to the ERCB and CrossAlta.
Location
11-26-027-01W5
Less detail

Decision 2013-13

https://had.aer.ca/link/decision4510
Applicant
Kallisto Energy Corp.
Application Number
1735722
Title
Decision 2013-013 : Kallisto Energy Corp. application for a well licence Crossfield East field
Date
2013
Title
Decision 2013-013 : Kallisto Energy Corp. application for a well licence Crossfield East field
Date
2013
Applicant
Kallisto Energy Corp.
Application Number
1735722
Hearing Panel
Watson TL
McManus BT
Eynon G
Hearing Type
Board
Category
Well licence
Storage facility
Descriptors
Well licence
Crude oil
Elkton FM
Hydrogen sulphide
Emergency response plan
Airdrie area
Land use
Risk
Gas storage
Legal References
Oil and Gas Conservation Regulations S2.020
Responsible Energy Development Act (REDA)
Oil and Gas Conservation Regulations S7.001
Notes
Change to legal citation effective January 2011
Interveners
CrossAlta Gas Storage & Service Ltd.
TransCanada Pipelines Ltd.
TransCanada Energy Ltd
Taks M
Verbeurgt K
Approval
Approved with conditions
Conditions
CONDITIONS Drilling and Completion 1) Kallisto must not fracture stimulate the 16-26 well. 2) Kallisto must a) run an initial full-length cement integrity log before completion. b) conduct a hydraulic isolation log after completion and stimulation Abandonment 3) Kallisto must a) for open hole abandonment, run a continuous cement plug from total depth to a minimum of 30 metres above the top of the Elkton Formation. The cement plug top must be confirmed by tagging, not logging. b) in the event that the well is cased, completed, and abandoned, conduct a cement squeeze of the perforated interval and fill the casing with cement to a minimum of 15 metres above the top of the Elkton Formation. If future well abandonment requirements exceed these conditions, the more stringent requirements will apply. Measurement 4) Kallisto must a) submit an initial pressure test completed in accordance with Directive 040: Pressure and Deliverability Testing Oil and Gas Wells. b) install a three phase separator to separate the gas, emulsion, and water before commingling with other well effluent. c) install appropriate measurement devices to measure the three phases according to the delivery point requirements in Directive 017: Measurement Requirements for Oil and Gas Operations, except for water measurement. d) approve, inspect, and calibrate the measurement devices according to the delivery point requirements in Directive 017: Measurement Requirements for Oil and Gas Operations, except for water measurement. e) install continuous sampling devices for the gas phase after separation according to requirements in Directive 017: Measurement Requirements for Oil and Gas Operations and analyze the gas sample once every two weeks, at a minimum. f) install proportional sampling devices to determine the water cut at least once per week for the emulsion phase according to requirements in Directive 017: Measurement Requirements for Oil and Gas Operations or install a continuous water-cut analyzer. g) ensure the well head separator does not have an operating pressure greater than 4200 kPa (600 psi). Disclosure of Confidential Information 5) Kallisto must provide all confidential information related to the 16-26 well to CrossAlta and the Freehold mineral owners (Jensen and Taks families). Production Reporting 6) Kallisto must report any production from the 16-26 well to PETRINEX as a single oil well battery. 2013
Location
16-26-027-01W5
Less detail

Decision E62-(p.001)

https://had.aer.ca/link/decision996
Applicant
Energy Resources Conservation Board
Application Number
712
Title
Examiners report on a proposal by the Board staff regarding well spacing in the Crossfield - Calgary area, 1962
Date
1962
Title
Examiners report on a proposal by the Board staff regarding well spacing in the Crossfield - Calgary area, 1962
Date
1962
Applicant
Energy Resources Conservation Board
Application Number
712
Hearing Panel
Craig DR
Bohme VE
Hearing Type
Examiners
Category
Spacing
Descriptors
Spacing unit
Well spacing
Cardium Fm
Allowable production
Crossfield Airdrie area
NTS 82J
Oil producing
Notes
Examiners report on application proposing that for a two year period commencing February 1, 1962, the spacing for oil wells in the Cardium FM within A designated area be one half section; the target area would be beneath either LSD 6 or 16; Examiners approve the application.
Less detail

Decision E78-(p.176)

https://had.aer.ca/link/decision1093
Applicant
Bow Valley Industries Ltd.
Application Number
770877
770878
Title
Examiners report on application by Bow Valley Industries Limited, 1978 (construction of sour natural gas pipelines, Airdrie area)
Date
1978
Title
Examiners report on application by Bow Valley Industries Limited, 1978 (construction of sour natural gas pipelines, Airdrie area)
Date
1978
Applicant
Bow Valley Industries Ltd.
Application Number
770877
770878
Hearing Panel
Bellows LA
Antonio HA
Fox EG
Hearing Type
Examiners
Category
Pipelines
Descriptors
Airdrie area
Gas pipeline
Pipeline construction permit
Sour gas
Notes
ERCB Examiners report on application No. 770878 by Bow Valley Industries Ltd. for the construction of secondary sour natural gas lines which are the gathering system for wells in LSD 7-34-26-1 W5M, LSD 11-35-26-1 W5M, and LSD 6-2-27-1 W5M to the point of connection with gas line in LSD 11-35-26-1 W5M; application No. 770877 for the construction of gas line for the transmission of sour natural gas from LSD 11-35-26-1 W5M to a point in LSD 16-34-25-29 W4M; Examiners hearing 1978-03-28 & 1978-05-23.
Interveners
Amoco Canada Petroleum Company Ltd.
Petrogas Processing Ltd.
Town of Airdrie
Bonner, L.G.
Bonner, D.E.
Church, B.C.
Church, A.W.
Church, C.G.
Chruch, R.
Cooper, G.S.
Cook, K.
Chitwood, H.
Doherty, K.C.
Farries, J.K.
Harry Yamamoto Holdings Ltd.
Melcor Developments Ltd.
Morden, C.R. and Family
Nixon, B.R.
Nixon, C.
Nu-West Corporation Ltd.
Reynolds, F.S.
Adina Holdings
Less detail

Decision E79-(p.110)

https://had.aer.ca/link/decision1767
Applicant
Calgary Power Ltd.
Application Number
790247
Title
Examiners report on application by Calgary Power Ltd., 1979 (138 KV transmission line CP 752L)
Date
1979
Title
Examiners report on application by Calgary Power Ltd., 1979 (138 KV transmission line CP 752L)
Date
1979
Applicant
Calgary Power Ltd.
Application Number
790247
Hearing Panel
Homeniuk TF
Antonio HA
Yu JNG
Hearing Type
Examiners
Utilities
Category
Transmission line
Descriptors
Airdrie area
Crossfield Airdrie area
Electric substation
Transmission line
Electric power demand
Locating
NTS 82O
NTS 82P
Route selection
Legal References
Hydro and Electric Energy Act S9
Hydro and Electric Energy Act S11
Hydro and Electric Energy Act S13
Hydro and Electric Energy Act S14
Hydro and Electric Energy Act S17
Notes
ERCB Examiners report on application No. 790247 to construct & operate a 138 KV transmission line in the Airdrie-Crossfield area and a substation near Airdrie (TP.27-29, R.28-29, W4M); permit and licence No. CP 79-51 and No. CP 79-52
Interveners
Hawkey, C.
Hawkey, M.
Shaftsbury Management Ltd.
Hamilton, H.
MacDonald, W.
Fletcher, A.
Carlson, B.
Tebb, A.C.
Kalmbach, R.
Garland, A.
Lubbers, W.
Hamilton Group
Less detail

10 records – page 1 of 1.