3 records – page 1 of 1.

Decision 79-01

https://had.aer.ca/link/decision2095
Applicant
Fekete and Associates
Michigan Wisconsin Pipe Line Company
Application Number
780374
Title
Decision on application by Fekete and Associates on behalf of Michigan Wisconsin Pipe Line Company, 1979 (compulsory pooling - an order pooling tracts for the production of gas from the Erskine Glauconitic C Pool)
Date
1979
Title
Decision on application by Fekete and Associates on behalf of Michigan Wisconsin Pipe Line Company, 1979 (compulsory pooling - an order pooling tracts for the production of gas from the Erskine Glauconitic C Pool)
Date
1979
Applicant
Fekete and Associates
Michigan Wisconsin Pipe Line Company
Application Number
780374
Hearing Panel
Pow JR
Edgecombe RW
Yu JNG
Hearing Type
Examiners
Category
Compulsory pooling
Descriptors
Compulsory pooling
Erskine field
Drilling cost
Geologic interpretation
Glauconitic sandstone
NTS 83A
Operating cost
Legal References
Oil and Gas Conservation Act S82
Notes
Decision 79-1 with Examiners report appended on application No. 780374 for an Order that all tracts within section 8-39-20 W4M be operated as a unit for the production of gas from the Glauconitic Sandstone.
Interveners
Gulf Canada Limited
Madison Oils Limited
Less detail

Decision E61-(p.181)

https://had.aer.ca/link/decision761
Applicant
Cancrude Oil and Gas Co. Ltd.
Michigan Wisconsin Pipe Line Company
Application Number
514
Title
Examiners report on application by Cancrude Oil and Gas Co. Ltd. and Michigan Wisconsin Pipe Line Company, 1961 (for approval of a scheme of partial pressure maintenance by the injection of separator gas in a part of the Pembina Cardium pool)
Date
1961
Title
Examiners report on application by Cancrude Oil and Gas Co. Ltd. and Michigan Wisconsin Pipe Line Company, 1961 (for approval of a scheme of partial pressure maintenance by the injection of separator gas in a part of the Pembina Cardium pool)
Date
1961
Applicant
Cancrude Oil and Gas Co. Ltd.
Michigan Wisconsin Pipe Line Company
Application Number
514
Hearing Panel
Stabback JG
Matthews MW
Hearing Type
Examiners
Category
Pressure maintenance
Descriptors
Pressure maintenance
Gas injection
Pembina field
NTS 83G
Cardium Fm
Allowable production
Gas liquid separation
Gas oil ratio
Notes
Examiners report on application for approval of a scheme of partial pressure maintenance by injection of raw separator gas to a part of the Pembina Cardium pool, and for permission to use the net gas oil ratio in allowable penalty factor calculations.
Less detail

Decision E69-(p.134)

https://had.aer.ca/link/decision1662
Applicant
Michigan Wisconsin Pipe Line Company
Application Number
4527
Title
Examiners report on application by Michigan Wisconsin Pipe Line Company, 1969 (special drilling spacing unit Duhamel field)
Date
1969
Title
Examiners report on application by Michigan Wisconsin Pipe Line Company, 1969 (special drilling spacing unit Duhamel field)
Date
1969
Applicant
Michigan Wisconsin Pipe Line Company
Application Number
4527
Hearing Panel
Strom NA
Bellows LA
Hearing Type
Examiners
Category
Spacing
Descriptors
Drilling spacing unit
Duhamel field
Oil producing
Nisku Fm
Leduc Fm
Target area
Notes
ERCB Examiners report on application No. 4527 by Michigan Wisconsin pipe line Company for the establishment of special drilling spacing unit for the production of oil from the Nisku and Leduc formations.
Interveners
Mobil Oil Canda, Ltd.
Approval
Denied
Less detail