Decision E77-(p.137)
https://had.aer.ca/link/decision1922
- Applicant
- Amerada Minerals Corporation of Canada Limited
- Application Number
- 9693
- Title
- Examiners report on application by Amerada Minerals Corporation of Canada Ltd., 1977 (gas processing plant Sturgeon Lake field)
- Date
- 1977
- Title
- Examiners report on application by Amerada Minerals Corporation of Canada Ltd., 1977 (gas processing plant Sturgeon Lake field)
- Date
- 1977
- Application Number
- 9693
- Hearing Panel
- Webber HJ
- Brushett ER
- Strom NA
- Hearing Type
- Examiners
- Category
- Gas processing
- Descriptors
- Gas processing plant
- Sour gas
- Sturgeon Lake field
- Acidification
- Airborne waste
- Dissolved gas
- Emission
- Environmental impact
- Flare
- Gas conservation
- Gas flaring
- NTS 83N
- Soil pollution
- Sulphur dioxide
- Sulphur recovery
- Notes
- ERCB Examiners report on application No. 9693 for gas processing plant to process sour gas in LSD 10-29-71-23 W5M in the Sturgeon Lake field; approval No. 2548
- Interveners
- National Farmers Union
- New Fish Creek Community Association
- Beddis, A.J.
- Drozda, J.
- McDonagh, C.
- Roschlaub, J.
Decision 77-04
https://had.aer.ca/link/decision2144
- Applicant
- IPEX Oil and Gas Ltd.
- Application Number
- 9980
- Title
- Decision on application by IPEX Oil and Gas Ltd., 1977 (licence to drill a well in LS 14-36-26-1 W5M Crossfield and Airdrie areas)
- Date
- 1977
- Title
- Decision on application by IPEX Oil and Gas Ltd., 1977 (licence to drill a well in LS 14-36-26-1 W5M Crossfield and Airdrie areas)
- Date
- 1977
- Applicant
- IPEX Oil and Gas Ltd.
- Application Number
- 9980
- Hearing Panel
- Craig DR
- Millard V
- DeSorcy GJ
- Hearing Type
- Board
- Category
- Well licence
- Descriptors
- Airdrie area
- Sour gas
- Well licence
- Emergency procedure
- Gas producing
- Gas well
- Hydrogen sulphide
- Isopach map
- Land use
- Locating
- NTS 82O
- Safety
- Turner Valley Fm
- Urban development
- Notes
- Decision 77-4 on application No. 9980 to drill the well, Ipex Czar et al Cross 14-36-26-1 (W5M), to produce gas from Elkton member of the Turner Valley formation; Board hearing 1977-02-23/24
- Interveners
- Town of Airdrie
- Nu-West Development Corporation
- Calgary Regional Planning Commission
- Cooper, G.S.
- Cirrus Land Corporation Ltd.
- Location
- 14-36-026-01W5
Decision E78-(p.176)
https://had.aer.ca/link/decision1093
- Applicant
- Bow Valley Industries Ltd.
- Application Number
- 770877
- 770878
- Title
- Examiners report on application by Bow Valley Industries Limited, 1978 (construction of sour natural gas pipelines, Airdrie area)
- Date
- 1978
- Title
- Examiners report on application by Bow Valley Industries Limited, 1978 (construction of sour natural gas pipelines, Airdrie area)
- Date
- 1978
- Applicant
- Bow Valley Industries Ltd.
- Application Number
- 770877
- 770878
- Hearing Panel
- Bellows LA
- Antonio HA
- Fox EG
- Hearing Type
- Examiners
- Category
- Pipelines
- Descriptors
- Airdrie area
- Gas pipeline
- Pipeline construction permit
- Sour gas
- Notes
- ERCB Examiners report on application No. 770878 by Bow Valley Industries Ltd. for the construction of secondary sour natural gas lines which are the gathering system for wells in LSD 7-34-26-1 W5M, LSD 11-35-26-1 W5M, and LSD 6-2-27-1 W5M to the point of connection with gas line in LSD 11-35-26-1 W5M; application No. 770877 for the construction of gas line for the transmission of sour natural gas from LSD 11-35-26-1 W5M to a point in LSD 16-34-25-29 W4M; Examiners hearing 1978-03-28 & 1978-05-23.
- Interveners
- Amoco Canada Petroleum Company Ltd.
- Petrogas Processing Ltd.
- Town of Airdrie
- Bonner, L.G.
- Bonner, D.E.
- Church, B.C.
- Church, A.W.
- Church, C.G.
- Chruch, R.
- Cooper, G.S.
- Cook, K.
- Chitwood, H.
- Doherty, K.C.
- Farries, J.K.
- Harry Yamamoto Holdings Ltd.
- Melcor Developments Ltd.
- Morden, C.R. and Family
- Nixon, B.R.
- Nixon, C.
- Nu-West Corporation Ltd.
- Reynolds, F.S.
- Adina Holdings
Decision E79-(p.110)
https://had.aer.ca/link/decision1767
- Applicant
- Calgary Power Ltd.
- Application Number
- 790247
- Title
- Examiners report on application by Calgary Power Ltd., 1979 (138 KV transmission line CP 752L)
- Date
- 1979
- Title
- Examiners report on application by Calgary Power Ltd., 1979 (138 KV transmission line CP 752L)
- Date
- 1979
- Applicant
- Calgary Power Ltd.
- Application Number
- 790247
- Hearing Panel
- Homeniuk TF
- Antonio HA
- Yu JNG
- Hearing Type
- Examiners
- Utilities
- Category
- Transmission line
- Descriptors
- Airdrie area
- Crossfield Airdrie area
- Electric substation
- Transmission line
- Electric power demand
- Locating
- NTS 82O
- NTS 82P
- Route selection
- Legal References
- Hydro and Electric Energy Act S9
- Hydro and Electric Energy Act S11
- Hydro and Electric Energy Act S13
- Hydro and Electric Energy Act S14
- Hydro and Electric Energy Act S17
- Notes
- ERCB Examiners report on application No. 790247 to construct & operate a 138 KV transmission line in the Airdrie-Crossfield area and a substation near Airdrie (TP.27-29, R.28-29, W4M); permit and licence No. CP 79-51 and No. CP 79-52
- Interveners
- Hawkey, C.
- Hawkey, M.
- Shaftsbury Management Ltd.
- Hamilton, H.
- MacDonald, W.
- Fletcher, A.
- Carlson, B.
- Tebb, A.C.
- Kalmbach, R.
- Garland, A.
- Lubbers, W.
- Hamilton Group
Decision 80-22
https://had.aer.ca/link/decision2017
- Applicant
- Energy Resources Conservation Board
- Application Number
- 800369
- Title
- Decision on application by Tebb (Mr. A.C. Tebb), 1980 (138 KV substation - Airdrie area)
- Date
- 1980
- Title
- Decision on application by Tebb (Mr. A.C. Tebb), 1980 (138 KV substation - Airdrie area)
- Date
- 1980
- Applicant
- Energy Resources Conservation Board
- Application Number
- 800369
- Hearing Panel
- DeSorcy GJ
- Bohme VE
- Bray JA
- Hearing Type
- Board
- Utilities
- Category
- Electric power
- Legal References
- Hydro and Electric Energy Act S13
- Notes
- Decision 80-22 on application No. 800369 by Mr. A.C. Tebb to relocate the Calgary power Ltd. east Airdrie substation CP 199S from its presently approved location in section 14-27-29 W4M to either of 2 locations in the east Airdrie industrial park; Board hearing 1980-09-03/04
- Interveners
- Tebb, A.C.
- Calgary Power Ltd.
- G.I.C. Industries Ltd.
- Woodland Properties Ltd.
- Burnco Industries Ltd.
- Don Beddoes Construction ltd.
- Comanche Drilling Ltd.
- Hamilton, H.A.
Decision 81-10
https://had.aer.ca/link/decision1757
- Applicant
- Calgary Power Ltd.
- Application Number
- 810159
- Title
- Examiners report on application by Calgary Power Ltd., 1981 (138 KV transmission line east Airdrie - Turbo)
- Date
- 1981
- Title
- Examiners report on application by Calgary Power Ltd., 1981 (138 KV transmission line east Airdrie - Turbo)
- Date
- 1981
- Applicant
- Calgary Power Ltd.
- Application Number
- 810159
- Hearing Panel
- Bray JA
- Fox EG
- Remmer WG
- Hearing Type
- Examiners
- Utilities
- Category
- Transmission line
- Descriptors
- Airdrie area
- Electric substation
- Transmission line
- Electric power demand
- Gas processing plant
- Land value
- NTS 82P
- Oil refinery
- Route selection
- Legal References
- Hydro and Electric Energy Act S9
- Hydro and Electric Energy Act S11
- Hydro and Electric Energy Act S14
- Hydro and Electric Energy Act S15
- Notes
- ERCB Examiners report No. E81-10 on application No. 810159 to construct and operate a 138 KV line (No. CP 752L) from east Airdrie substation (No. CP 199S) to proposed Turbo substation (No. CP 391S) (TP.25-27, R.28-29, W4M).
- Interveners
- Town of Airdrie
- Matlock, J.E.
- Comanche Drilling Ltd.
- Turbo Resources Limited
- Goerlitz, A.
- DeWaal, H.
- Tebb, C.
- Armada Builders Ltd.
- Qualico Developments
Decision 81-09
https://had.aer.ca/link/decision1758
- Applicant
- Panther Resources Ltd.
- Application Number
- 800651
- Title
- Examiners report on application by Panther Resources Ltd., 1981 (gas processing plant)
- Date
- 1981
- Title
- Examiners report on application by Panther Resources Ltd., 1981 (gas processing plant)
- Date
- 1981
- Applicant
- Panther Resources Ltd.
- Application Number
- 800651
- Hearing Panel
- Evans RG
- Pearson DG
- Remmer WG
- Hearing Type
- Examiners
- Category
- Gas processing
- Descriptors
- Duhamel field
- Gas processing plant
- Sour gas
- Acidification
- Air quality
- Economic analysis
- Emission
- Environmental impact
- Flare
- Hydrogen sulphide removal
- Livestock
- Locating
- Monitoring
- NTS 83A
- Sulphur dioxide
- Sulphur recovery
- Water quality
- Legal References
- Oil and Gas Conservation Act S38
- Notes
- ERCB Examiners report No. E81-9 on application No. 800651 to construct and operate a sour gas processing plant southwest of Camrose in LSD 5-31-45-20 W4M; Examiners' hearing 81-01-15 adjourned to 81-03-17/18/19
- Interveners
- City of Camrose
- County of Camrose No.22
- Cordes, K.
- Calvin, G.
- Noden, D.
- Luz, W.
- Klapstein, W.
- Sauer, J.
- Sauer, K.
- Weyhausen, H.
- Weyga Farming Ltd.
- Watterodt, T.
- Watterodt, W.
- Watterodt, M.
- Schroeder, D.
- Schroeder, K.
- Schroeder, P.
- Schroeder, H.
- Graefin Von Helldorf, V.
- Schroeser, I.
- Baumgarten, E.
- Braim, B.
- Krangnes, D.
- Snider, R.
- Tate, R.
Decision 82-D
https://had.aer.ca/link/decision2313
- Applicant
- Energy Resources Conservation Board
- Application Number
- 810520
- 810092
- Title
- Sour gas processing in Alberta : a review of evidence presented at recent ERCB hearings respecting the impacts and surveillance of sour gas plants
- Date
- 1982
- Title
- Sour gas processing in Alberta : a review of evidence presented at recent ERCB hearings respecting the impacts and surveillance of sour gas plants
- Date
- 1982
- Applicant
- Energy Resources Conservation Board
- Application Number
- 810520
- 810092
- Category
- Gas processing
- Descriptors
- Air pollution
- Emission
- Environmental impact
- Gas processing
- Nitrogen oxide
- Soil pollution
- Sour gas
- Sulphur
- Sulphur dioxide
- Sulphur dioxide removal
- Sulphur recovery
- Water pollution
- Acidification
- Airborne waste
- Alberta
- Deposition
- Exhaust gas
- Health
- Hydrogen sulphide
- Injection
- Livestock
- Monitoring
- Selenium
- Trace element
- Underground
- Waste disposal
- Notes
- ERCB report 82-D arising from hearing to consider application for sour gas processing at Jumping Pound and Quirk Creek gas plants and pipeline to connect Moose and Whiskey sour gas reserves to Quirk Creek plant. for Decisions on these applications see ERCB Decisions 82-3, 82-12 and report 82-E
Decision 84-20
https://had.aer.ca/link/decision1156
- Applicant
- Texaco Canada Resources Ltd.
- Application Number
- 830725
- Title
- Examiners report on application by Texaco Canada Resources Ltd., 1984 (Open Creek gas processing plant)
- Date
- 1984
- Title
- Examiners report on application by Texaco Canada Resources Ltd., 1984 (Open Creek gas processing plant)
- Date
- 1984
- Applicant
- Texaco Canada Resources Ltd.
- Application Number
- 830725
- Hearing Panel
- Webber HJ
- Bray JA
- Homeniuk TF
- Hearing Type
- Examiners
- Category
- Gas processing
- Descriptors
- Gas processing plant
- Open Creek field
- Sour gas
- Acidification
- Air quality
- Atmospheric diffusion
- Basal Quartz Fm
- Deposition
- Emission
- Environmental impact
- Gas producing
- Health
- Hydrogen sulphide
- Mathematical model
- Monitoring
- NTS 83B
- Revision
- Soil analysis
- Selenium
- Sulphur content
- Sulphur dioxide
- Notes
- ERCB Examiners report E84-20 on application No. 830725 for approval to amend approval 3079 to increase the sulphur inlet rate to the open Creek gas plant located in LSD 10-34-42-5 W4M.
- Interveners
- Gibson, H.
- Bauer, J.
- Bauer, L.
- Bryanton, W.
- Eklund, C.
- Eklund, P.
Decision 2012-05
https://had.aer.ca/link/decision4480
- Applicant
- Kallisto Energy Corporation
- Application Number
- 1697898
- Title
- Decision 2012-005 : Kallisto Energy Corp. application for a well licence Crossfield East Field
- Date
- 2012
- Title
- Decision 2012-005 : Kallisto Energy Corp. application for a well licence Crossfield East Field
- Date
- 2012
- Applicant
- Kallisto Energy Corporation
- Application Number
- 1697898
- Hearing Panel
- McManus RC
- Eynon G
- Warren WA
- Hearing Type
- Board
- Category
- Well licence
- Descriptors
- Communication (well)
- Emergency response plan
- Emergency procedure
- Airdrie area
- Basal Quartz FM
- Hydrogen sulphide
- Well licence
- Position (location)
- Legal References
- Oil and Gas Conservation Regulations S2.020
- 2012 ABERCB 005
- Notes
- Change to legal citation effective January 2011
- Interveners
- CrossAlta Gas Storate & Service
- BP Canada Energy
- BPCanada Energy Company
- GransCanaada Pipelines Limited
- Approval
- Approved with conditions
- Conditions
- CONDITIONS
- The licensee must obtain and immediately submit stabilized initial pressure data to the ERCB and CrossAlta.
- The licensee must not use fracture stimulation on the well that exceeds 40 tonnes unless consent has been given by the Board.
- The licensee must obtain and submit stabilized pre- and post-frac pressure data to the ERCB and CrossAlta.
- Location
- 11-26-027-01W5
Decision 2013-13
https://had.aer.ca/link/decision4510
- Applicant
- Kallisto Energy Corp.
- Application Number
- 1735722
- Title
- Decision 2013-013 : Kallisto Energy Corp. application for a well licence Crossfield East field
- Date
- 2013
- Title
- Decision 2013-013 : Kallisto Energy Corp. application for a well licence Crossfield East field
- Date
- 2013
- Applicant
- Kallisto Energy Corp.
- Application Number
- 1735722
- Hearing Panel
- Watson TL
- McManus BT
- Eynon G
- Hearing Type
- Board
- Category
- Well licence
- Storage facility
- Descriptors
- Well licence
- Crude oil
- Elkton FM
- Hydrogen sulphide
- Emergency response plan
- Airdrie area
- Land use
- Risk
- Gas storage
- Legal References
- Oil and Gas Conservation Regulations S2.020
- Responsible Energy Development Act (REDA)
- Oil and Gas Conservation Regulations S7.001
- Notes
- Change to legal citation effective January 2011
- Interveners
- CrossAlta Gas Storage & Service Ltd.
- TransCanada Pipelines Ltd.
- TransCanada Energy Ltd
- Taks M
- Verbeurgt K
- Approval
- Approved with conditions
- Conditions
- CONDITIONS Drilling and Completion 1) Kallisto must not fracture stimulate the 16-26 well. 2) Kallisto must a) run an initial full-length cement integrity log before completion. b) conduct a hydraulic isolation log after completion and stimulation Abandonment 3) Kallisto must a) for open hole abandonment, run a continuous cement plug from total depth to a minimum of 30 metres above the top of the Elkton Formation. The cement plug top must be confirmed by tagging, not logging. b) in the event that the well is cased, completed, and abandoned, conduct a cement squeeze of the perforated interval and fill the casing with cement to a minimum of 15 metres above the top of the Elkton Formation. If future well abandonment requirements exceed these conditions, the more stringent requirements will apply. Measurement 4) Kallisto must a) submit an initial pressure test completed in accordance with Directive 040: Pressure and Deliverability Testing Oil and Gas Wells. b) install a three phase separator to separate the gas, emulsion, and water before commingling with other well effluent. c) install appropriate measurement devices to measure the three phases according to the delivery point requirements in Directive 017: Measurement Requirements for Oil and Gas Operations, except for water measurement. d) approve, inspect, and calibrate the measurement devices according to the delivery point requirements in Directive 017: Measurement Requirements for Oil and Gas Operations, except for water measurement. e) install continuous sampling devices for the gas phase after separation according to requirements in Directive 017: Measurement Requirements for Oil and Gas Operations and analyze the gas sample once every two weeks, at a minimum. f) install proportional sampling devices to determine the water cut at least once per week for the emulsion phase according to requirements in Directive 017: Measurement Requirements for Oil and Gas Operations or install a continuous water-cut analyzer. g) ensure the well head separator does not have an operating pressure greater than 4200 kPa (600 psi). Disclosure of Confidential Information 5) Kallisto must provide all confidential information related to the 16-26 well to CrossAlta and the Freehold mineral owners (Jensen and Taks families). Production Reporting 6) Kallisto must report any production from the 16-26 well to PETRINEX as a single oil well battery. 2013
- Location
- 16-26-027-01W5