1 records – page 1 of 1.

Decision 87-14|87-14 Addendum

https://had.aer.ca/link/decision201
Applicant
Alberta Power Limited
Application Number
870308
Title
Decision on application by Alberta Power Ltd., 1987 (Alberta- Saskatchewan interconnection Empress area) (and addendum)
Date
1987
Title
Decision on application by Alberta Power Ltd., 1987 (Alberta- Saskatchewan interconnection Empress area) (and addendum)
Date
1987
Applicant
Alberta Power Limited
Application Number
870308
Hearing Panel
Goodman CJ
Mink FJ
Prince JP
Hearing Type
Board
Utilities
Category
Transmission line
Descriptors
Empress area
Power system interconnection
Transmission line
Alberta
Benefit cost analysis
Electric power demand
Forecasting
NTS 72L
Saskatchewan
Legal References
Hydro and Electric Energy Act S12
Hydro and Electric Energy Act S13
Hydro and Electric Energy Act S14
Hydro and Electric Energy Act S15
Hydro and Electric Energy Act S16
Hydro and Electric Energy Act S17
Notes
Decision D87-14 on application No. 870308 to construct and operate a DC back-to-back converter station near Empress AB, to be called McNeill DC converter station 840S; to construct and operate a 138-KV single circuit transmission line, 830L, from the existing Dome Empress substation 163S to the McNeill station; to construct and operate a 230-KV single circuit transmission line, S1M from the McNeill station to the Alberta-Saskatchewan border; to connect the 138-KV line and McNeill station to TAU Empress substation; to interconnect the 230-KV line and McNeill station with the electric system of Saskatchewan power; to make alterations to the Dome Empress substation 163S and transmission line 760L; addendum dated 1987-11-20 approving the amendment for the construction and operation of a 150 -MW interconnection and the 230-KV line route between the McNeill station and the border
Interveners
Industrial Power Consumers Association of Alberta
TransAlta Utilities Planning Council
Less detail