65 records – page 1 of 4.

Decision 57-02

https://had.aer.ca/link/decision2418
Applicant
Saskatchewan Power Corporation
Application Number
000079 (HEARING)
Title
Decision on application by Saskatchewan Power Corporation, 1957 (removal of gas produced from the Medicine Hat field)
Date
1957
Title
Decision on application by Saskatchewan Power Corporation, 1957 (removal of gas produced from the Medicine Hat field)
Date
1957
Applicant
Saskatchewan Power Corporation
Application Number
000079 (HEARING)
Hearing Panel
McKinnon IN
Goodall DP
Govier GW
Hearing Type
Board
Category
Gas removal
Descriptors
Gas removal
Alberta
Etzikom field
Gas demand
Gas reserve
Gas supply
Medicine Hat area
Legal References
Gas Resources Preservation Act 1956
Notes
ERCB Report 57-2 on Hearing No. 79 on an application by Saskatchewan Power to remove gas from the Medicine Hat and Etzikom fields; Board hearing 1956-12-11 and 1957-01-15/16/17/18
Less detail

Decision 57-UNNUMBERED (57-08-30)

https://had.aer.ca/link/decision106
Applicant
Energy Resources Conservation Board
Application Number
000085 (HEARING)
Title
Decision on the proration plan and the economic allowance (letter to all operators)
Date
1957
Title
Decision on the proration plan and the economic allowance (letter to all operators)
Date
1957
Applicant
Energy Resources Conservation Board
Application Number
000085 (HEARING)
Hearing Type
Board
Category
Prorationing
Descriptors
Marketing
MPR
Proration
Alberta
Notes
Decision (released as letter to all operators) on proceeding no.85 to review the main principles of the Board's plan for proration to market demand and to consider the role and method of computation of the economic allowance
Less detail

Decision 2011-01

https://had.aer.ca/link/decision4440
Applicant
Husky Oil Operations Limited
Application Number
1629298
1637168
1637171
1643275
1643376
1643382
1644489
1644050
1644051
1644368
1644391
1644503
1645047
1647694
Title
Decision 2011-001 : Husky Oil Operations Limited applications for wells and pipelines Provost Field
Date
2011
Title
Decision 2011-001 : Husky Oil Operations Limited applications for wells and pipelines Provost Field
Date
2011
Applicant
Husky Oil Operations Limited
Application Number
1629298
1637168
1637171
1643275
1643376
1643382
1644489
1644050
1644051
1644368
1644391
1644503
1645047
1647694
Hearing Panel
Eynon G
Hearing Type
Board
No Hearing
Category
Well licence
Pipelines
Descriptors
Sour gas
Hydrogen sulphide
Pipeline transportation
Provost field
Horizontal well
Well licence
Pipeline
Pipeline licence
Dispute resolution
Cummings FM
Effluent
Legal References
Pipeline Act Part 4
Oil and Gas Conservation Regulations S2.020
2011 ABERCB 001
Notes
Change to legal citation effective January 2011
Interveners
Anderson LE
Anderson EG
Approval
Approved
Less detail

Decision 2011-02

https://had.aer.ca/link/decision4441
Applicant
West Energy Limited
Daylight Energy Limited
Application Number
1647499
Title
Decision 2011-002 : West Energy Ltd./Daylight Energy Ltd. review application no. 1647499 : a section 39 review of Linda McGinn's status under section 26 of the ERCA re Hearing of application no. 1623169 Pembina Field
Date
2011
Title
Decision 2011-002 : West Energy Ltd./Daylight Energy Ltd. review application no. 1647499 : a section 39 review of Linda McGinn's status under section 26 of the ERCA re Hearing of application no. 1623169 Pembina Field
Date
2011
Applicant
West Energy Limited
Daylight Energy Limited
Application Number
1647499
Hearing Panel
Watson TL
Dilay JD
Eynon G
Hearing Type
Written hearing
Board
Category
Well licence
Descriptors
NTS 83G
Hydrogen sulphide
Review and variance
Directive 071
Directive 060
Emergency response plan
Health
Safety
Gas flaring
Pembina field
Legal References
Energy Resources Conservation Act S39
Energy Resources Conservation Act S26
Oil and Gas Conservation Regulations S7.060
2011 ABERCB 002
Notes
Change to legal citation effective January 2011
Approval
No approval required
Location
16-05-050-06W5
Less detail

Decision 2011-03

https://had.aer.ca/link/decision4442
Applicant
Daylight Energy Limited
Application Number
1645059
Title
Decision 2011-003: Daylight Energy Ltd. application for special oil well spacing Pembina
Date
2011
Title
Decision 2011-003: Daylight Energy Ltd. application for special oil well spacing Pembina
Date
2011
Applicant
Daylight Energy Limited
Application Number
1645059
Hearing Panel
Hubbard BC
Hearing Type
Board
No Hearing
Category
Spacing
Descriptors
Drainage
Dispute resolution
Well spacing
NTS 83G
Directive 065
Cardium FM
Pembina Field
Legal References
Oil and Gas Conservation Act S79
Oil and Gas Conservation Regulations S5.190
2011 ABERCB 003
Notes
Change to legal citation effective January 2011
Interveners
Owl River Resources Ltd.
Approval
Approved
Location
xx-34-048-06W5
Less detail

Decision 2011-04

https://had.aer.ca/link/decision4443
Applicant
Enbridge Pipelines (Athabasca) Incorporated
Application Number
1675154
1653762
1653763
1653765
1675268
Title
Decision 2011-004 : Enbridge Pipelines (Athabasca) Inc. applications for a pipeline and pipeline installation licences Athabasca Oil Sands area
Date
2011
Title
Decision 2011-004 : Enbridge Pipelines (Athabasca) Inc. applications for a pipeline and pipeline installation licences Athabasca Oil Sands area
Date
2011
Applicant
Enbridge Pipelines (Athabasca) Incorporated
Application Number
1675154
1653762
1653763
1653765
1675268
Hearing Panel
McManus BT
Hearing Type
Board
No Hearing
Category
Pipelines
Descriptors
Hydrogen sulphide
Crude oil
Pipeline
Pipeline licence
Pipeline construction
Pump station
Legal References
Pipeline Act Part 4
Energy Resources Conservation Act S26
2011 ABERCB 004
Notes
Change to legal citation effective January 2011
Interveners
Mikisew Cree First Nation (MCFN)
Approval
Approved
Less detail

Decision 2011-05

https://had.aer.ca/link/decision4445
Applicant
Total E&P Limited
Application Number
1445535
Title
Decision 2011-005 : Total E&P Joslyn Ltd. application for an oil sands mine and bitumen processing facility Joslyn North mine project Fort McMurray area
Date
2011
Title
Decision 2011-005 : Total E&P Joslyn Ltd. application for an oil sands mine and bitumen processing facility Joslyn North mine project Fort McMurray area
Date
2011
Applicant
Total E&P Limited
Application Number
1445535
Hearing Panel
Dilay JD
Ross B
McFadyen D
Hearing Type
Board
Category
Oil sands
Descriptors
Oil sands oil recovery
Bitumen
Oil sands
Directive 074
Environmental impact assessment
Conservation
Environmental impact
Wildlife
Vegetation
Wetland
Water
Fish
History
Paleontology
Land use
Socio-economic effect
Economic development
Noise (sound)
Reclamation
Liability (law)
Tailings - storage
Settling pond
Residential building
Public consultation
Cumulative impact assessment
Legal References
2011 ABERCB 005
Oil Sands Conservation Act S3
Oil Sands Conservation Act S24
Oil Sands Conservation Act S26
Oil Sands Conservation Regulation
Environmental Protection and Enhancement Act
Water Act
Energy Resources Conservation Act
Canadian Environmental Assessment Act
Notes
Report of the joint review panel established by the Federal Minister of the Environment and the Energy Resources Conservation Board
Change to legal citation effective January 2011
Interveners
BP Canada Energy Company
Shell Canada Limited
Syncrude Canada Limited
Belanger F member of the Dene Sioux First Nation
Regional Municipality of Wood Buffalo (RMWB)
Oil Sands Environmental Coalition (OSEC)
Mikisew Cree First Nation (MCFN)
Fort McKay First Nation and Metis Nation Local #63 (Fort McKay)
Athabasca Chipewyan First Nation (ACFN)
Non-Status Fort McMurray Band Descendents, and Off-Reserve Fort McMurray Band Descendants
Sierra Club Prairie
Guertin M
Clearwater River Band No. 175
Government of Canada
Government of Alberta
Joint Review Panel (Panel) staff
Approval
Approved with conditions
Conditions
Condition 1 – TOTAL will submit a detailed tailings management plan two years before commencement of operations, and TOTAL will clearly demonstrate its ability to meet all requirements of Directive 074. (Section 5.1.3) Condition 2 – TOTAL will devise methods for measuring fines at the project in accordance with Energy Resources Conservation Board requirements. (Section 5.1.3) Condition 3 – TOTAL will notify the Energy Resources Conservation Board in writing of any proposed pilot plants and/or demonstration plants for all technology development at least six months before construction of those facilities begins. (Section 5.1.3) Condition 4 – TOTAL will provide written updates of any previously submitted test reports by no later than February 28 each year, or as otherwise specified by the Energy Resources Conservation Board. (Section 5.1.3) Condition 5 – TOTAL will not exceed three million cubic metres of fluid in the sand beach area sumps. (Section 5.1.3) Condition 6 – One year prior to plant start-up, TOTAL will privide measurement plans to the Energy Resources Conservation Board for review and approval, including process and instrumentation diagrams, metering, sampling methods, analytical methods and, material balance procedures that satisfy Energy Resources Conservation Board measurement requirements. (Section 5.2.2) Condition 7 – TOTAL will not discharge any untreated froth treatment tailings to the tailings disposal area. (Section 5.3.2) Condition 8 – On an annual average basis, TOTAL will limit site-wide solvent losses to not more than four volumes per thousand volumes of bitumen production under any operating conditions. (Section 5.3.2) Condition 9 – On an annual average basis, TOTAL will limit the amount of asphaltene rejection to 10 mass per cent based on bitumen production. (Section 5.4.2) Condition 10 – TOTAL will submit detailed geotechnical designs for all external overburden disposal areas and reclamation stockpiles to the Energy Resources Conservation Board at least six months prior to conducting any field preparation in these areas. (Section 5.5.3) Condition 11 – TOTAL will submit to the Energy Resources Conservation Board, for its review and approval, detailed geotechnical designs and setback distances for critical infrastructure two years prior to site preparation activities for the ore preparation plant pit, the west and southern final pitwall, and for the final pitwall design and assessed setback from the Ells River. (Section 5.5.3) Condition 12 – TOTAL will provide Alberta Environment with a wildlife mitigation plan for approval prior to clearing any vegetation. The plan must achieve no net significant adverse effect on species at risk and deal with mitigating impacts to not only species at risk, but also valued wildlife. (Section 6.1.3) Condition 13 – TOTAL will monitor noise levels at James Grandejambe’s cabin. Should noise levels exceed those outlined in Directive 038, TOTAL will ensure that mitigation measures are implemented and that Directive 038 compliance is met. (Section 9.6.3) Condition 14 – TOTAL will maintain unimpeded access required for stakeholders to areas west of the project until the Moose Lake access management plan, or an equivalent, is implemented. (Section 9.7.3) Condition 15 – TOTAL will actively support and participate in the Cumulative Environmental Management Association and other regional committees to develop and use its strategies to mitigate both development and regional cumulative environmental effects. (Section 10.1.3) Condition 16 – TOTAL will limit the area of disturbance to 5000 hectares or less. (Section 10.1.3) Condition 17 – TOTAL will remove all benching on mine discard structures prior to reclaiming them. (Section 10.1.3) Condition 18 – TOTAL will provide sustainable watershed designs with vegetated watercourses for geotechnical design applications for mine discard structures. Landform watershed designs should be consistent with regionally recognized guidelines for the purpose of erosion management. (Section 10.1.3) Condition 19 – TOTAL will provide an amended mine plan to demonstrate an integrated landform and landscape design for the Canadian Natural Resources Limited – TOTAL common mine boundary to the Energy Resources Conservation Board for approval five years prior to development. The amended plan must include a discussion of the feasibility of filling the trench area between the Joslyn North and Horizon projects with mine discard. The plan must also include a discussion of the alternatives considered by TOTAL. (Section 10.2.3) Condition 20 – TOTAL will submit an annual report to the Energy Resources Conservation Board, starting two years prior to commencing mining operations, that describes its end pit lake research and development efforts for the previous year, and the current plans and timelines for determining the efficacy of its end pit lake within seven years of mine closure. This report will include all of TOTAL’s efforts and contributions with respect to collaboration on the demonstration of a full scale end pit lake. (Section 12.3)
Less detail

Decision 2011-06

https://had.aer.ca/link/decision4444
Applicant
Cequence Energy Ltd.
Application Number
1639824
Title
Decision 2011-006 : Cequence Energy Ltd. application for a pipeline licence Gordondale Field
Date
2011
Title
Decision 2011-006 : Cequence Energy Ltd. application for a pipeline licence Gordondale Field
Date
2011
Applicant
Cequence Energy Ltd.
Application Number
1639824
Hearing Panel
Willard RJ
Hearing Type
Board
No Hearing
Category
Pipelines
Descriptors
NTS 83M
Gordondale field
Natural gas
Hydrogen sulphide
Pipeline
Pipeline licence
Pipeline construction
Pump station
Legal References
Pipeline Act Part 4
2011 ABERCB 006
Notes
Change to legal citation effective January 2011
Interveners
Klimek Law
Approval
Approved
Location
16-18-079-11W6
Less detail

Decision 2011-07

https://had.aer.ca/link/decision4447
Applicant
Shell Canada Limited
Application Number
1614134
1614144
1614145
1614198
1614210
Title
Decision 2011-007 : Shell Canada Limited applications for well, facility, and pipelines licences Waterton Field
Date
2011
Title
Decision 2011-007 : Shell Canada Limited applications for well, facility, and pipelines licences Waterton Field
Date
2011
Applicant
Shell Canada Limited
Application Number
1614134
1614144
1614145
1614198
1614210
Hearing Panel
Bruni MJ
Watson TL
McManus BT
Hearing Type
Board
Category
Pipelines
Well licence
Descriptors
Waterton Field
NTS 82G
Well licence
Pipeline licence
Facility licence
Directive 071
Directive 060
Directive 056
Natural gas
Hydrogen sulphide
Risk
Corrosion control
Carbondale area
Environmental impact
Mississippian FM
Rundle FM
Emergency response plan
Vegetation
Wildlife
Sulphur dioxide
Legal References
Energy Resources Conservation Act
Oil and Gas Conservation Regulations S2.020
Oil and Gas Conservation Regulations S7.002(1)
Pipeline Act Part 4
2011 ABERCB 007
Notes
Change to legal citation effective January 2011
Interveners
Castle-Crown Wilderness Coalition
Sheppard-Barbero group
Orich-Fisher group
Judd-Latham group
McDowall S
Healy H
Crowshoe E
Plain Eagle M
Smith F
Yellow Wings W
Little Wolf M
Small Legs E
Ryan W
Laskin D
Approval
Approved with conditions
Conditions
The Board understands the frustration of residents about the time they spend dealing with matters arising from oil and gas development in the area; therefore, the Board advises that it will look to the quality of outcomes and not the quantity of consultation as a demonstration of success.
The Board directs Shell to conduct a drilling and completions ERP exercise prior to spudding the WT68 well and to involve interested stakeholders in the development and implementation of and follow-up to that exercise.
The Board directs Shell to control dust on the Seven Gates Road by watering the road as required based on the weather, road use, and road condition during drilling and completion of the well.
The Board directs Shell to have a traffic monitor close to the junction of Seven Gates Road and Highway 507 during drilling and completions of the well.
The ERCB directs that if Shell needs to test the well, the operational plans for this test, either in-line or by flaring, must be submitted to the ERCB for approval.
Location
10-01-006-03W5
06-12-006-03W5
Less detail

Decision 2011-08

https://had.aer.ca/link/decision4446
Applicant
Compton Petroleum Corporation
Darian Resources Limited
Application Number
1634570
1634572
1634573
1634574
1634576
1634580
1634581
1634583
1634584
Title
Decision 2011-008 : Compton Petroleum Corporation and Darian Resources Ltd. section 39 and 40 review of seven well licences, two pipeline licences, and one facility licence Ensign, Parkland Northeast, and Vulcan Fields
Date
2011
Title
Decision 2011-008 : Compton Petroleum Corporation and Darian Resources Ltd. section 39 and 40 review of seven well licences, two pipeline licences, and one facility licence Ensign, Parkland Northeast, and Vulcan Fields
Date
2011
Applicant
Compton Petroleum Corporation
Darian Resources Limited
Application Number
1634570
1634572
1634573
1634574
1634576
1634580
1634581
1634583
1634584
Hearing Panel
McManus BT
Watson TL
McGee TM
Hearing Type
Board
Category
Pipelines
Well licence
Descriptors
Well licence
NTS 82I
Hydrogen sulphide
Review and variance
Directive 056
Directive 060
Air quality
Safety
Gas flaring
Vulcan field
Sunburst FM
Pipeline licence
Natural gas
Ensign field
Parkland Northeast field
Rierdon FM
Emission
Health
Legal References
Energy Resources Conservation Act S39
Energy Resources Conservation Act S40
Oil and Gas Conservation Regulations S2.020
Oil and Gas Conservation Regulations S7.001
Pipeline Act Part 4
2011 ABERCB 008
Notes
Change to legal citation effective January 2011
Interveners
Questerre Energy
Alstn Freeholders
Approval
Approved (partial)
Location
11-13-016-26W4
12-09-016-25W4
11-30-015-25W4
09-29-015-25W4
06-12-016-25W4
05-04-017-25W4
02-29-016-25W4
16-36-015-26W4
02-29-015-25W4
Less detail

Decision 2011-09

https://had.aer.ca/link/decision4448
Applicant
Royal Park Energy Limited
Application Number
1658391
Title
Decision 2011-009 : Royal Park Energy Ltd. application for compulsory pooling Royal field
Date
2011
Title
Decision 2011-009 : Royal Park Energy Ltd. application for compulsory pooling Royal field
Date
2011
Applicant
Royal Park Energy Limited
Application Number
1658391
Hearing Panel
Dilay JD
Hearing Type
Board
No Hearing
Category
Compulsory pooling
Descriptors
NTS 83H
Royal Field
Compulsory pooling
Drilling spacing unit
Mannville GP
Well spacing
Legal References
Oil and Gas Conservation Act S80
ERCB Rules of Practice S21
Notes
Change to legal citation effective January 2011
Approval
Withdrawn
Location
xx-03-053-16W4
Less detail

Decision 2011-10

https://had.aer.ca/link/decision4449
Applicant
Signalta Resources Limited
Application Number
1663997
Title
Decision 2011-010 : Examiner report respecting Signalta Resources Limited application for special gas well spacing Ukalta Field
Date
2011
Title
Decision 2011-010 : Examiner report respecting Signalta Resources Limited application for special gas well spacing Ukalta Field
Date
2011
Applicant
Signalta Resources Limited
Application Number
1663997
Hearing Panel
Dilay GW
Hearing Type
Examiner Report
No Hearing
Category
Spacing
Descriptors
Ukalta field
Well spacing
Spacing unit
Gas well
Gas producing
NTS 83H
Colony Member
Sparky Member
Notes
Change to legal citation effective January 2011
Approval
Withdrawn
Location
XX-22-056-16W4
Less detail

Decision 2011-12

https://had.aer.ca/link/decision4451
Applicant
Athabasca Oil Sands Corp.
Application Number
1647807
Title
Decision 2011-012 : Athabasca Oil Sands Corp. requests for interim shut-in of gas Liege Field Athabasca Oil Sands area
Date
2011
Title
Decision 2011-012 : Athabasca Oil Sands Corp. requests for interim shut-in of gas Liege Field Athabasca Oil Sands area
Date
2011
Applicant
Athabasca Oil Sands Corp.
Application Number
1647807
Hearing Panel
Dilay JD
McManus BT
Willard RJ
Hearing Type
Board
Category
Gas/Bitumen
Descriptors
Bitumen
Liege field
Athabasca Oil Sands
Communication
Steam assisted gravity drainage
Shutin well
Legal References
Oil and Gas Conservation Regulations S3
Oil and Gas Conservation Regulations11.150
Oil Sands Conservation Regulation S3
2011 ABERCB 012
Notes
Change to legal citation effective January 2011
Interveners
Canadian Natural Resources Limited (CNRL)
Japan Canada OIl Sands Limited
Paramount Energy Operating Corp.
EnCana Oil and Gas Ltd.
Approval
Approved
Less detail

Decision 2011-13

https://had.aer.ca/link/decision4450
Applicant
Baytex Energy Ltd.
Application Number
1663364
Title
Decision 2011-013 : Baytex Energy Ltd. application for a pipeline licence Pembina Field
Date
2011
Title
Decision 2011-013 : Baytex Energy Ltd. application for a pipeline licence Pembina Field
Date
2011
Applicant
Baytex Energy Ltd.
Application Number
1663364
Hearing Panel
Watson TL
Hearing Type
Board
No Hearing
Category
Pipelines
Descriptors
NTS 83G
Pembina field
Natural gas
Hydrogen sulphide
Pipeline
Pipeline licence
Drayton Valley area
Legal References
Pipeline Act Part 4
2011 ABERCB 013
Notes
Change to legal citation effective January 2011
Approval
Withdrawn
Location
10-19-048-08W5
Less detail

Decision 2011-14

https://had.aer.ca/link/decision4452
Applicant
Quicksilver Resources Canada Inc.
Application Number
1662419
Title
Decision 2011-014 : Quicksilver Resources Canada Inc. application for a pipeline licence Entice Field
Date
2011
Title
Decision 2011-014 : Quicksilver Resources Canada Inc. application for a pipeline licence Entice Field
Date
2011
Applicant
Quicksilver Resources Canada Inc.
Application Number
1662419
Hearing Panel
Watson TL
Hearing Type
Board
No Hearing
Category
Pipelines
Descriptors
NTS 82P
Entice Field
Beiseker area
Pipeline
Pipeline licence
Pipeline construction
Legal References
Pipeline Act Part 4
2011 ABERCB 014
Approval
Approved
Location
12-15-028-26W4
Less detail

Decision 2011-15

https://had.aer.ca/link/decision4453
Applicant
EnCana Corporation
Application Number
1653996
1618077
1623426
1679184
Title
Decision 2011-015 : EnCana Corporation applications for two well licences and two pipeline licences Entice Field
Date
2011
Title
Decision 2011-015 : EnCana Corporation applications for two well licences and two pipeline licences Entice Field
Date
2011
Applicant
EnCana Corporation
Application Number
1653996
1618077
1623426
1679184
Hearing Panel
Miller GJ
Hearing Type
Board
No Hearing
Category
Well licence
Pipelines
Descriptors
Sour gas
Hydrogen sulphide
Pipeline transportation
Provost field
Horizontal well
Well licence
Pipeline
Pipeline licence
Dispute resolution
Cummings FM
Effluent
Legal References
Pipeline Act Part 4
Oil and Gas Conservation Regulations S2.020
2011 ABERCB 015
Notes
Change to legal citation effective January 2011
Approval
Approved
Location
03-02-028-23W4
05-02-028-24W4
Less detail

Decision 2011-16

https://had.aer.ca/link/decision4454
Applicant
Taqa North Limited
Application Number
1642820
Title
Decision 2011-016 : Taqa North Ltd application for good production practice Huxley Field
Date
2011
Title
Decision 2011-016 : Taqa North Ltd application for good production practice Huxley Field
Date
2011
Applicant
Taqa North Limited
Application Number
1642820
Hearing Panel
Hubbard BC
McFadyen D
Hearing Type
Board
No Hearing
Descriptors
MRL
Huxley Field
Good Production Practice
Directive 065
Legal References
Oil and Gas Conservation Regulations S10.060
Approval
Approved
Less detail

Decision 2011-17

https://had.aer.ca/link/decision4455
Applicant
Crocotta Energy Inc.
Application Number
1659767
Title
Decision 2011-017 : Crocotta Energy Inc. application for special gas well spacing Edson Field
Date
2011
Title
Decision 2011-017 : Crocotta Energy Inc. application for special gas well spacing Edson Field
Date
2011
Applicant
Crocotta Energy Inc.
Application Number
1659767
Hearing Panel
Hubbard BC
Hearing Type
Board
No Hearing
Category
Spacing
Descriptors
Edson field
Well spacing
Spacing unit
Gas well
Gas producing
NTS
Smoky River Gp
Dunvegan FM
Fort St. John GP
Gething FM
Cadomin FM
Bluesky FM
Notes
Change to legal citation effective January 2011
Approval
Approved (partial)
Location
08-19-054-18W5
09-19-054-18W5
17-19-054-18W5
18-19-054-18W5
19-19-054-18W5
Less detail

Decision 2011-18

https://had.aer.ca/link/decision4456
Applicant
Primrose Drilling Ventures Limited
Application Number
1680101
Title
Decision 2011-018 : Primrose Drilling Ventures Ltd. section 39 review of well licence no. 0405699 Wildwood Field
Date
2011
Title
Decision 2011-018 : Primrose Drilling Ventures Ltd. section 39 review of well licence no. 0405699 Wildwood Field
Date
2011
Applicant
Primrose Drilling Ventures Limited
Application Number
1680101
Hearing Panel
Watson TL
Hearing Type
Board
No Hearing
Category
Pipelines
Well licence
Descriptors
NTS 83G
Well licence
Review and variance
Directive 056
Legal References
Energy Resources Conservation Act S39
ERCB Rules of Practice S48
2011 ABERCB 018
Notes
Change to legal citation effective January 2011
Interveners
Shuttle K
Kalinowski A
Kalinowski V
Approval
Approved
Location
06-26-053-09W5
Less detail

Decision 2011-19

https://had.aer.ca/link/decision4457
Applicant
Canadian Natural Resources Limited (CNRL)
Application Number
1629922
1629923
1629924
1629926
1629927
1629929
1629930
1629931
1629933
1629934
1629935
1629936
1629938
1648948
1648949
1634352
Title
Decision 2011-019 : Canadian Natural Resources Limited applications for 15 well and 8 facility licences Sugden Field
Date
2011
Title
Decision 2011-019 : Canadian Natural Resources Limited applications for 15 well and 8 facility licences Sugden Field
Date
2011
Applicant
Canadian Natural Resources Limited (CNRL)
Application Number
1629922
1629923
1629924
1629926
1629927
1629929
1629930
1629931
1629933
1629934
1629935
1629936
1629938
1648948
1648949
1634352
Hearing Panel
Eynon G
McManus RC
Gilmour J
Hearing Type
Written hearing
Category
Pipelines
Well licence
Descriptors
Sugden Field
NTS 73L
Well licence
Facility licence
Directive 008
Directive 009
Directive 051
Directive 056
Directive 019
Environmental impact
Socio-economic effect
Groundwater
Surface water
Water conservation
Odor
Emission
Wildlife
Evaluation
Compliance
Consultation
Traffic survey
Sparky FM
Mannville GP
Colorado GP
Cold Lake area
Legal References
Oil and Gas Conservation Regulations S2.020
Oil and Gas Conservation Regulations S7.001
2011 ABERCB 019
Notes
Amendment issued 13 September 2011
Change to legal citation effective January 2011
Interveners
Minnie Lake Conservation Society
Approval
Approved with conditions
Conditions
The panel instructs CNRL to
set surface casing for all wells at an elevation no shallower than 440 m above mean sea level,
conduct cement evaluation logs of the surface casing in each well after drilling to total depth and provide them to the Board for review and approval after setting the production casing,
run cement evaluation logs of the production casing in each well and provide them to the Board for review and approval before perforating the wells, and
refrain from conducting drilling operations, with the exception of well site construction operations, from June 1 until after September 5 (Labour Day).
CNRL committed to
complete a minimum of two bottoms-up circulations to ensure that the hole is clean,
conduct wiper trips using a stabilizer blade assembly to ensure that the hole is properly cleaned of drilling mud and cuttings and has sufficient filter cake to protect the shallow aquifers or permeable zones, minimizing the potential for bridging-off or loss of circulation,
use semirigid centralizers on every collar on both casing strings,
use a minimum of 6 m3 of good cement returns prior to displacement of the cement from the inside of the casing string with a wiper plug,
perform gas migration and surface casing vent flow tests within 90 days of rig release to confirm its procedures will successfully provide hydraulic isolation, and
promptly address concerns with odours, through either its own internal processes or external partners such as LICA, where appropriate.
Location
15-10-061-08W4
13-10-061-08W4
08-15-061-08W4
15-22-061-08W4
10-16-061-08W4
07-22-061-08W4
15-15-061-08W4
13-15-061-08W4
09-15-060-04W4
Less detail

65 records – page 1 of 4.