77 records – page 1 of 4.

Decision 57-02

https://had.aer.ca/link/decision2418
Applicant
Saskatchewan Power Corporation
Application Number
000079 (HEARING)
Title
Decision on application by Saskatchewan Power Corporation, 1957 (removal of gas produced from the Medicine Hat field)
Date
1957
Title
Decision on application by Saskatchewan Power Corporation, 1957 (removal of gas produced from the Medicine Hat field)
Date
1957
Applicant
Saskatchewan Power Corporation
Application Number
000079 (HEARING)
Hearing Panel
McKinnon IN
Goodall DP
Govier GW
Hearing Type
Board
Category
Gas removal
Descriptors
Gas removal
Alberta
Etzikom field
Gas demand
Gas reserve
Gas supply
Medicine Hat area
Legal References
Gas Resources Preservation Act 1956
Notes
ERCB Report 57-2 on Hearing No. 79 on an application by Saskatchewan Power to remove gas from the Medicine Hat and Etzikom fields; Board hearing 1956-12-11 and 1957-01-15/16/17/18
Less detail

Decision 57-UNNUMBERED (57-08-30)

https://had.aer.ca/link/decision106
Applicant
Energy Resources Conservation Board
Application Number
000085 (HEARING)
Title
Decision on the proration plan and the economic allowance (letter to all operators)
Date
1957
Title
Decision on the proration plan and the economic allowance (letter to all operators)
Date
1957
Applicant
Energy Resources Conservation Board
Application Number
000085 (HEARING)
Hearing Type
Board
Category
Prorationing
Descriptors
Marketing
MPR
Proration
Alberta
Notes
Decision (released as letter to all operators) on proceeding no.85 to review the main principles of the Board's plan for proration to market demand and to consider the role and method of computation of the economic allowance
Less detail

Decision 98-20 Addendum

https://had.aer.ca/link/decision3067
Applicant
Nova Pipeline Ventures Ltd.
Application Number
1026917
Title
Decision 98-20 addendum: Nova Pipeline Ventures Ltd. application to construct and operate a natural gas pipeline, Wood Buffalo Lake to Fort McMurray area
Date
1999
Title
Decision 98-20 addendum: Nova Pipeline Ventures Ltd. application to construct and operate a natural gas pipeline, Wood Buffalo Lake to Fort McMurray area
Date
1999
Applicant
Nova Pipeline Ventures Ltd.
Application Number
1026917
Hearing Panel
Dilay JD
McGee TM
Rahnama F
Hearing Type
Board
Category
Pipelines
Descriptors
Competition
Demand (economics)
Gas pipeline
Pipeline construction permit
Legal References
Energy Resources Conservation Act S29
Notes
EUB Decision D98-20 Addendum on application no 1026917 by Nova Pipeline Ventures (Ventures) to construct and operate a 110-kilometer, 610 millimeter outside diameter pipeline for the purpose of transporting natural gas from Lsd 13 Sec 18 Twp 86 Rge18 W4M to meter station at Lsd 16 Sec 15 Twp 92 Rge 10 W4M; Reasons for decision issued in addendum considering need for the pipeline, location of the meter station, and the corporate relationship between Ventures and NOVA Gas Transmission Limited
Board hearing (pursuant to sections 29 of the Energy Resources Conservation Act) held 1998-11-13/17
Interveners
Suncor Energy Inc.
Simmons Group Inc.
Clan Duncan Resources
Canadian Association of Petroleum Producers
Canadian Western Natural Gas Limited
Northwestern Utilities Ltd.
Approval
Approved
Less detail

Decision 99-01

https://had.aer.ca/link/decision2973
Applicant
Gulf Canada Limited
Nova Gas Transmission Ltd.
Application Number
1007769
1030551
1030552
1033762
Title
Decision 99-01: Gulf Canada Resources Limited application to construct and operate a sour gas processing plant, sour natural gas and fuel pipelines, Steen River area; [and] Nova Gas Transmission Ltd. application to construct and operate a sweet natural gas pipeline and meter station, Steen River area
Date
1999
Title
Decision 99-01: Gulf Canada Resources Limited application to construct and operate a sour gas processing plant, sour natural gas and fuel pipelines, Steen River area; [and] Nova Gas Transmission Ltd. application to construct and operate a sweet natural gas pipeline and meter station, Steen River area
Date
1999
Applicant
Gulf Canada Limited
Nova Gas Transmission Ltd.
Application Number
1007769
1030551
1030552
1033762
Hearing Panel
Berg AJ
Bietz BF
Hurst TM
Hearing Type
Board
Category
Gas processing
Pipelines
Descriptors
Dizzy field
Gas pipeline
Gas processing plant
NTS 84N
Pipeline construction permit
Proliferation
Sour gas
Steen River area
Legal References
Energy Resources Conservation Act S29
Energy Resources Conservation Act S42
Oil and Gas Conservation Act S26
Energy Resources Conservation Act S43
Pipeline Act Part 4
Notes
EUB Decision 99-01 on applications no. 1007769, 1030551, 103552, and 1033762 by Gulf to construct and operate a sour gas processing plant in the Dizzy field (Lsd 9 Sec 17 Twp 122 Rge 20 W5M) [and] by Nova to construct and operate pipeline to transport natural gas to proposed Steen River Plant.
Interveners
Bearspaw Petroleum Ltd.
Paramount Resources Ltd.
Location
09-17-122-20W5
Less detail

Decision 99-01

https://had.aer.ca/link/decision2980
Applicant
Bonavista Petroleum Ltd.
Pacific Cassiar Limited
Application Number
1020308
1022809
1022978
1023336
Title
Examiner report on application by Bonavista Petroleum Ltd., Pacific Cassiar Limited - compulsory pooling and pipelines, Blood and Magrath areas
Date
1999
Title
Examiner report on application by Bonavista Petroleum Ltd., Pacific Cassiar Limited - compulsory pooling and pipelines, Blood and Magrath areas
Date
1999
Applicant
Bonavista Petroleum Ltd.
Pacific Cassiar Limited
Application Number
1020308
1022809
1022978
1023336
Hearing Panel
Sharp KG
Shirley EA
Willard RJ
Hearing Type
Examiners
Category
Compulsory pooling
Pipelines
Descriptors
Compulsory pooling
Blood field
Gas pipeline
Gas producing
Magrath area
NTS 82H
Pipeline construction permit
Bow Island Fm
Legal References
Oil and Gas Conservation Act S72
Pipeline Act Part 4
Notes
Examiners report E99-01 on application 1020308 by Pinnacle Resources for an order prescribing all tracts within dsu be operated as a unit for the production of gas from the Bow Island Fm; on application 1022809 by Pinnacle to construction sweet natural gas pipeline from well to Lsd 9 Sec 23 Twp 6 Rge 22 W4M; on application 1022978 by Pinnacle to construct sweet gas pipeline from Lsd 1 Sec 27 Twp 6 Rge 21 W4M to Lsd 5 Sec 20 Twp 6 Rge 21 W4M and on application 1023336 by Pacific Cassiar to construct sweet gas pipeline from well located in Lsd 8 Sec 19 Twp 6 Rge 21 W4M to Lsd 1 Sec 19 Twp 6 Rge 21 W4M; Examiners hearing: 1998-12-07/08/09 (3 days)
Location
06-23-006-22W4
01-27-006-21W4
05-20-006-21W4
08-19-006-21W4
01-19-006-21W4
Less detail

Decision 99-01 Addendum

https://had.aer.ca/link/decision2976
Applicant
Gulf Canada Limited
Nova Gas Transmission Ltd.
Application Number
1007769
1030551
1030552
1033762
Title
Decision 99-01 Addendum: Gulf Canada Resources Limited application to construct and operate a sour gas processing plant, sour natural gas and fuel gas pipelines, Steen River area; [and] Nova Gas Transmission Ltd. application to construct and operate a sweet natural gas pipeline and meter station, Steen River area
Date
1999
Title
Decision 99-01 Addendum: Gulf Canada Resources Limited application to construct and operate a sour gas processing plant, sour natural gas and fuel gas pipelines, Steen River area; [and] Nova Gas Transmission Ltd. application to construct and operate a sweet natural gas pipeline and meter station, Steen River area
Date
1999
Applicant
Gulf Canada Limited
Nova Gas Transmission Ltd.
Application Number
1007769
1030551
1030552
1033762
Hearing Panel
Berg AJ
Bietz BF
Hurst TM
Hearing Type
Board
Category
Gas processing
Pipelines
Descriptors
Gas pipeline
Gas processing plant
Pipeline construction permit
Proliferation
Sour gas
Legal References
Energy Resources Conservation Act S29
Energy Resources Conservation Act S42
Energy Resources Conservation Act S43
Oil and Gas Conservation Act S26
Pipeline Act Part 4
Notes
EUB Decision 99-01 on applications no. 1007769, 1030551, 103552, and 1033762 by Gulf to construct and operate a sour gas processing plant in the Dizzy field (Lsd 9 Sec 17 Twp 122 Rge20 W5M) [and] by Nova to construct and operate pipeline to transport natural gas to proposed Steen River Plant.
Addendum (dated 19 January 1999) details the Board's findings and reasons for its decision.
Interveners
Bearspaw Petroleum Ltd.
Paramount Resources Ltd.
Less detail

Decision 99-02

https://had.aer.ca/link/decision2989
Applicant
Shell Canada Limited
Application Number
970588
Title
Decision 99-02: Shell Canada Limited application to construct and operate an oil sands mine in the Fort McMurray area (Shell Canada Limited Muskeg River Mine Project)
Date
1999
Title
Decision 99-02: Shell Canada Limited application to construct and operate an oil sands mine in the Fort McMurray area (Shell Canada Limited Muskeg River Mine Project)
Date
1999
Applicant
Shell Canada Limited
Application Number
970588
Hearing Panel
Bietz BF
Berg AJ
Lillo HO
Hearing Type
Board
Category
Oil sands
Descriptors
Bitumen
Environmental impact
Fort McMurray area
Land reclamation
Muskeg River Mine Project
Native land claims
NTS 74E
Oil mining
Regional planning
Socio-economic effect
Oil sands oil recovery
Oil sands project
Legal References
Oil Sands Conservation Act S10
Notes
EUB Decision 99-02 on application no. 970588 by Shell for approval to construct, operate, and reclaim oil sands mine and associated bitumen extraction facilities (Muskeg River Mine) in the Fort McMurray area. The mine would be located east of the Athabasca River, in Twp 98, Ranges 9/10, W4M. The project includes the mining and processing of oil sands from the western portion of Lease 13. The application consists of approval for a truck and shovel operation, a bitumen extraction plant, a bitumen froth treatment plant and supporting infrastructure. The project consists of three components, the mine and extraction plant on Lease 13, the proposed Scotford Upgrader, and a pipeline connecting the two. D99-02 relates only to the Lease 13 application.
Board hearing (Fort McMurray) held 1998-11-16/17/18/19.
Interveners
Athabasca Chipewyan First Nation
Oil Sands Environmental Coalition
Anzac Metis Local 334
Corridor Pipeline
Syncrude Canada Limited
Less detail

Decision 99-02

https://had.aer.ca/link/decision3068
Applicant
Talisman Energy Inc.
Application Number
1031007
Title
Examiner report on application by Talisman Energy Inc. application for a gas battery and pipeline permit Gordondale field
Date
1999
Title
Examiner report on application by Talisman Energy Inc. application for a gas battery and pipeline permit Gordondale field
Date
1999
Applicant
Talisman Energy Inc.
Application Number
1031007
Hearing Panel
Remmer WG
Lillo HO
Pesta TJ
Hearing Type
Examiners
Category
Gas processing
Descriptors
Battery
Community relations
Gas pipeline
Gordondale field
Environmental impact
NTS 83M
Pipeline route
Sour gas
Sulphur dioxide
Legal References
Oil and Gas Conservation Act S26
Oil and Gas Conservation Regulations S7.001
Pipeline Act Part 4
Notes
EUB Examiners report on application no. 1031007 to install a 0.004 tonne per day sulphur single well battery at Lsd 7-32-79-10 W6M and to construct and operate a sour gas pipeline from Lsd 7-32-79-W6M to Lsd 8-33-79-10 W6M.
Interveners
Day C
Approval
Approved
Location
07-32-079-10W6
08-33-079-10W6
Less detail

Decision 99-03

https://had.aer.ca/link/decision3028
Applicant
Matrix Resources Ltd.
Application Number
980143
Title
Decision 99-03: Matrix Resources Ltd. application to transfer well and pipeline licences
Date
1999
Title
Decision 99-03: Matrix Resources Ltd. application to transfer well and pipeline licences
Date
1999
Applicant
Matrix Resources Ltd.
Application Number
980143
Hearing Panel
Mink FJ
McCrank MN
Dilay JD
Hearing Type
Board
Category
Legal changes
Descriptors
Abandonment
Bankruptcy
ID 93 2
Legal changes
Pipeline licence
Well licence
Legal References
Energy Resources Conservation Act S43
Oil and Gas Conservation Act S18
Oil and Gas Conservation Act S13
Pipeline Act S24
Notes
EUB Decision 99-03 on application 981043 by Matrix Resources to transfer the well and pipeline licences and facilities from Legacy Petroleum Ltd. to Matrix, (237 well licences, 28 pipeline licences and 6 facilities). Letters of objection were received from Alberta Treasury and Alberta Justice, because substantial debts were owed by Legacy and transfer was opposed until arrangements were made to resolve the debts.
Interveners
Canadian Association of Petroleum Producers / Small Explorers and Producers Association of Canada
Alberta Special Areas Board
Alberta Environment Protection
Cypress County Municipal District
Gas & Oil Accounting Ltd.
M. Pidherney's Trucking Ltd.
KPMG Inc.
Approval
Denied
Less detail

Decision 99-03

https://had.aer.ca/link/decision3116
Applicant
Union Pacific Resources Inc.
Application Number
1026077
1036629
1038235
1038236
1038237
1038810
1038811
1038820
Title
Examiner report on application by Union Pacific Inc. applications for well licences and to construct and operate sour gas processing facility and associated pipelines, Telefordville field
Date
1999
Title
Examiner report on application by Union Pacific Inc. applications for well licences and to construct and operate sour gas processing facility and associated pipelines, Telefordville field
Date
1999
Applicant
Union Pacific Resources Inc.
Application Number
1026077
1036629
1038235
1038236
1038237
1038810
1038811
1038820
Hearing Panel
Schnitzler WJ
Waisman DD
Elle R
Hearing Type
Examiners
Category
Gas processing
Descriptors
Gas processing plant
Sour gas
Well licence
Legal References
Oil and Gas Conservation Act S26
Oil and Gas Conservation Regulations S2.020
Notes
EUB Examiners report on application no. 1026077, 1036629, 1038235, 1038236, 1038237, 1038810, 1038811, and 1038820 to contsruct and operate a sour gas facility and associated pipelines at Lsd 16 Sec 29 Twp 50 Rge 2W5M.
Interveners
Union Pacific Resources Inc.
Gilmour B
Evans A
Poole G
Poole L
Edmonton Power Generation Inc.
Fording Coal Limited
Davis TR
Hemy W
Graca JF
Litun RO
Hass D
Virginillo B
Smith L
Tartan Engineering Ltd.
Patching RG
Dowsett I
DeNeve B
Topping D
Munroe T
Johnston B
Approval
Approved
Less detail

Decision 99-04

https://had.aer.ca/link/decision3041
Applicant
Imperial Oil Resources Limited
Application Number
970488
Title
Decision 99-04: Imperial Oil Resources Limited industrial system designation Cold Lake Expansion Project
Date
1999
Title
Decision 99-04: Imperial Oil Resources Limited industrial system designation Cold Lake Expansion Project
Date
1999
Applicant
Imperial Oil Resources Limited
Application Number
970488
Hearing Panel
Belanger C
Miller GJ
Mink FJ
Hearing Type
Board
Utilities
Category
Electric power
Descriptors
Cogeneration
Cold Lake heavy oil project
Electric power generation
Electric power transmission
Industrial plant
Power system interconnection
Legal References
Electric Utilities Act S2
Electric Utilities Act S73
Hydro and Electric Energy Act S1
Hydro and Electric Energy Act S2
Hydro and Electric Energy Act S12
Hydro and Electric Energy Act S14
Hydro and Electric Energy Act S17
Notes
EUB Decision D99-04 on application 970488 to designate Imperial's new electrical generation, transmission, and distribution systems serving its Cold Lake operations as an "industrial system"; and make rules exempting from the operation of the Electric Utilities Act, electric energy produced from and consumed by the proposed "industrial system", pursuant to section 73(4) of the Electric Utilities Act;
Interveners
Alberta Power Limited
ENMAX Corporation
Industrial Power Consumers Association of Alberta
TransAlta Energy
TransAlta Utilities
Independent Power Producers Society of Alberta And Senior Petroleum Producers Association of Alberta
NOVA Chemicals Limited
ESBI Alberta Limited
Alberta Federation of REAs Limited
Alberta Association of Municipal Districts and Counties And Public Institutional Consumers Association
Less detail

Decision 99-04

https://had.aer.ca/link/decision3135
Applicant
Talisman Energy Inc.
Application Number
1041416
1047693
Title
Examiner report on application by Talisman Energy Inc. application for a pipeline permit, temporary compressor and permanent booster compressor, Medicine River field
Date
1999
Title
Examiner report on application by Talisman Energy Inc. application for a pipeline permit, temporary compressor and permanent booster compressor, Medicine River field
Date
1999
Applicant
Talisman Energy Inc.
Application Number
1041416
1047693
Hearing Panel
Pesta TJ
Hubbard BC
Abel TG
Hearing Type
Examiners
Category
Pipelines
Descriptors
Compressor station
Medicine River field
Noise (sound)
NTS 83B
Pipeline construction permit
Surface water
Legal References
Oil and Gas Conservation Regulations S7.001
Oil and Gas Conservation Regulations S15.210
Pipeline Act S4
Notes
Examiner report E99-4 on applications no. 1041416 and 1047693 by Talisman Energy Inc. for a pipeline permit and compressors at Lsd 10 Sec 12 Twp 39 Rge 3 W5M
Interveners
Hietala A
Campbell D
Approval
Approved
Approved with conditions
Conditions
Conduct comprehensive sound level survey after compressors are operational
submit results of sound survey to the Board and provide a copy to Mr. Campbell
operate temporary compressor only during well testing
Location
10-12-039-03W5
Less detail

Decision 99-05

https://had.aer.ca/link/decision3046
Applicant
Post Energy Corporation
Application Number
1031434
Title
Decision 99-05: Post Energy Corporation application for a sweet well Armisie Field, 11-30-51-25 W4M
Date
1999
Title
Decision 99-05: Post Energy Corporation application for a sweet well Armisie Field, 11-30-51-25 W4M
Date
1999
Applicant
Post Energy Corporation
Application Number
1031434
Hearing Panel
Mink FJ
McGee TM
Bruni MJ
Hearing Type
Board
Category
Well licence
Descriptors
Armisie field
Edmonton area
Environmental impact
Guide 56
Hydrogen sulphide
ID 94-04
ID 97-06
IL 89-04
Land value
NTS 83H
Public consultation
Decision D1983 F
Risk
Sour gas
Well licence
Legal References
Oil and Gas Conservation Regulations S2.020
Notes
EUB Decision D99-05 on application 1031434 by Post Energy for a license for a sweet well in lsd 11 Sec 30 Twp 51 Rge 25 W4M to obtain gas production from the Basal Quartz Fm;
Interveners
Yau, Man-Yee
Location
11-30-051-25W4
Less detail

Decision 99-06

https://had.aer.ca/link/decision3031
Applicant
South Alta Rural Electrification Association
Application Number
980580
Title
Decision 99-06: South Alta REA service area boundary extension to serve SE 20-11-15 W4M
Date
1999
Title
Decision 99-06: South Alta REA service area boundary extension to serve SE 20-11-15 W4M
Date
1999
Applicant
South Alta Rural Electrification Association
Application Number
980580
Hearing Panel
Berg AJ
Bietz BF
Nichol JR
Hearing Type
Board
Utilities
Category
Electric power
Descriptors
Service area
Boundary
Expansion
NTS 72E
Electric power
Legal References
Hydro and Electric Energy Act S26
Hydro and Electric Energy Act S28
Hydro and Electric Energy Act S29
Notes
EUB Decision D99-06 on Application No. 980580 by South Alta Rural Electrification Association (REA) for an extension of its service area boundary to include the SE quarter of Section 20-11-15 W4M which is currently within the service area of TransAlta Utilities Corporation;
Interveners
TransAlta Utilities Corporation
Alberta Power Limited
Cameron Farms Colony Limited
Location
##-20-011-15W4
Less detail

Decision 99-07

https://had.aer.ca/link/decision3029
Applicant
Suncor Energy Inc.
Application Number
980197
Title
Decision 99-07: application by Suncor Energy Inc. for amendment of Approval No. 8101 for the proposed Project Millenium development
Date
1999
Title
Decision 99-07: application by Suncor Energy Inc. for amendment of Approval No. 8101 for the proposed Project Millenium development
Date
1999
Applicant
Suncor Energy Inc.
Application Number
980197
Hearing Panel
Mink FJ
Dilay JD
McGee TM
Hearing Type
Board
Category
Oil sands
Descriptors
Athabasca oil sands
Expansion
Fort McMurray area
NTS 74D
Steepbank mine
Suncor Millenium project
Oil sands project
Legal References
Oil Sands Conservation Act S14
Notes
EUB Decision D99-07 on application no. 980197 to amend Approval no. 8101 in respect of its existing oil sands mine and processing facilities in the Fort McMurray area. The Project, referred to as Project Millenium, consists of an expansion to the Steepbank Mine; an oil sands extraction plant on the east side of the Athabasca River; modifications to the existing extraction plant on the west side of the Athabasca River; addition of a second processing train to upgrade oil sands products; utilities and other related infrastructure; an integrated reclamation plan for all of Suncor's mining areas;
Integrated process with AEP includes Application No. 014-494 to AEP under EPEA to amend Suncor's exising EPEA approval No. 94-91-00 to authorise proposed development and reclamation; and Application under the WRA to amend Licence No. 10400 to increase consumption of water from the Athabasca River and to amend Licence to Divert and Use Water No. 27549 and 27551 to increase the diversion annually from surface and groundwater;
Board Hearing (Fort McMurray) 1999-01-12/13/14/15; (Calgary) 1999-02-02
Interveners
Oil Sands Environmental Coalition
Smith D
Kitagawa M
Dort-McLean A
Marr-Laing T
Friends of the Athabasca
Scott H
Anzac Metis Local #334
Malcolm J
Coulter R
Cardinal P
Cree E
Powder J
Government of Canada
Faulknor S
Hnytka F
Hamilton G
McDonald K
Lockhart L
Government of Alberta
McDonald WA
Nagendran J
Harquail MA
Singh KK
Hale A
MacKenzie A
Less detail

Decision 99-07 Addendum A

https://had.aer.ca/link/decision3075
Applicant
Suncor Energy Inc.
Application Number
980197
Title
Decision 99-07 Addendum A: Application by Suncor Energy Inc. for amendment of Approval No. 8101 for the proposed Project Millenium development
Date
1999
Title
Decision 99-07 Addendum A: Application by Suncor Energy Inc. for amendment of Approval No. 8101 for the proposed Project Millenium development
Date
1999
Applicant
Suncor Energy Inc.
Application Number
980197
Hearing Panel
Mink FJ
Dilay JD
McGee TM
Hearing Type
Board
Category
Oil sands
Descriptors
Athabasca oil sands
Expansion
Fort McMurray area
NTS 74D
Steepbank mine
Suncor Millenium project
Oil sands project
Legal References
Oil Sands Conservation Act S14
Notes
EUB Decision D99-07 Addendum A on application no. 980197 to amend Approval no. 8101 in respect of its existing oil sands mine and processing facilities in the Fort McMurray area. This Project, referred to as Project Millenium, consists of an expansion to the Steepbank Mine; an oil sands extraction plant on the east side of the Athabasca River; modifications to the existing extraction plant on the west side of the Athabasca River; addition of a second processing train to upgrade oil sands products; utilities and other related infrastructure; an integrated reclamation plan for all of Suncor's mining areas;
This Addendum sets out the Board's reasons for its decision and the conditions associated with the extraction froth treatment plant;
Board Hearing (Fort McMurray) 1999-01-12/13/14/15; (Calgary) 1999-02-02
Less detail

Decision 99-07 Addendum B

https://had.aer.ca/link/decision3083
Applicant
Suncor Energy Inc.
Application Number
980197
Title
Decision 99-07 Addendum B: Application by Suncor Energy Inc. for amendment of Approval No. 8101 for the proposed Project Millenium development
Date
1999
Title
Decision 99-07 Addendum B: Application by Suncor Energy Inc. for amendment of Approval No. 8101 for the proposed Project Millenium development
Date
1999
Applicant
Suncor Energy Inc.
Application Number
980197
Hearing Panel
Mink FJ
Dilay JD
McGee TM
Hearing Type
Board
Category
Oil sands
Descriptors
Athabasca oil sands
Expansion
Fort McMurray area
NTS 74D
Steepbank mine
Suncor Millenium project
Oil sands project
Legal References
Oil Sands Conservation Act S14
Notes
EUB Decision D99-07 Addendum B on application no. 980197 to amend Approval no. 8101 in respect of its existing oil sands mine and processing facilities in the Fort McMurray area. This Project, referred to as Project Millenium, consists of an expansion to the Steepbank Mine; an oil sands extraction plant on the east side of the Athabasca River; modifications to the existing extraction plant on the west side of the Athabasca River; addition of a second processing train to upgrade oil sands products; utilities and other related infrastructure; an integrated reclamation plan for all of Suncor's mining areas;
This Addendum sets out the Board's detailed reasons for its decision and the conditions for the entire project
Board Hearing (Fort McMurray) 1999-01-12/13/14/15; (Calgary) 1999-02-02
Decision includes: Appendix 1 Decision 99-07; Appendix 2 Decision 99-07 addendum A; Appendix 3 Committees and Organizations in the Athabasca Oil Sands Region Addressing Environmental, Health, and Socio-Economic Issues
Interveners
Oil Sands Environmental Coalition
Friends of the Athabasca
Anzac Metis Local #334
Canada. Dept. of Fisheries and Oceons
Canada. Dept. of Environment Canada
Alberta. Dept. of Environment
Alberta. Dept. of Health
Approval
Approved
Approved with conditions
Conditions
Use of TV/BIP ratio equal to 15 to measure ongoing performance with regards to determination of appropriate pit limits.
Suncor must submit evaluation that determines final mining limit and detailed geotechnical designs for the north and northeast dumps prior to construction of the dumps
Suncor must submit an assessment of the impact of relocated extraction plant on resource recovery, environmental, and mine and extraction operations
Suncor must study ways to minimize size of in situ plug
Suncor must submit designs of dykes and external tailings pond
Suncor must submit annual progress reports on tailings research until trafficable tailings have been established
Suncor is required to achieve an annual diluent recovery of not less than 99.5 per cent.
Release of untreated froth treatment tailings and upgrader wastewater into tailings pond not acceptable
Suncor must monitor project emissions
Suncor must report on its commitment to use low NOx emissions technology
Less detail

Decision 99-08

https://had.aer.ca/link/decision3042
Applicant
Shell Canada Limited
Shell Canada Products Limited
Application Number
980137
980337
Title
Decision 99-08: Shell Canada Limited application to construct and operate an oil sands bitumen upgrader in the Fort Saskatchewan area and Shell Canada Products Limited application to amend refinery approval in the Fort Saskatchewan area
Date
1999
Title
Decision 99-08: Shell Canada Limited application to construct and operate an oil sands bitumen upgrader in the Fort Saskatchewan area and Shell Canada Products Limited application to amend refinery approval in the Fort Saskatchewan area
Date
1999
Applicant
Shell Canada Limited
Shell Canada Products Limited
Application Number
980137
980337
Hearing Panel
Dilay JD
Mink FJ
Lillo HO
Hearing Type
Board
Category
Oil sands
Descriptors
Air quality
Environmental impact
Fort Saskatchewan area
Industrial development permit
Land use
Noise (sound)
NTS 83H
Sulphur recovery
Oil sands oil recovery
Upgrading
Legal References
Oil Sands Conservation Act S11
Oil Sands Conservation Act S13
Notes
EUB Decision D99-08 on application 9980137 by Shell Canada Limtied to construct and operate an oil sands bitumen upgrader on Shell's property adjoining the existing Scotford refinery (Section 31 and 32, 55-21 W4M) to process bitumen from Shell's proposed Muskeg River Mine; and on application 980337 by Shell Canada Products to amend the existing Scotford refinery approval (IDP 89-10) for the processing of 3.75 million cubic metres per year of sour conversion feedstock;
Board hearing (Josephburg): 1998-10-26/27/28
Interveners
Strathcona County
Zayac, W.
Demeule, N.
Schotte, E
Dzurny, A.
Corridor Pipeline Limited
Redwater Water Disposal Company Limited
Lakeland Regional Health Authority
Location
##-31-055-21W4
##-32-055-21W4
Less detail

Decision 99-09

https://had.aer.ca/link/decision3049
Applicant
Rio Alto Exploration Ltd.
Application Number
1030648
Title
Decision 99-09: Rio Alto Exploration Ltd. application to modify a sweet gas processing facility McLeod Field
Date
1999
Title
Decision 99-09: Rio Alto Exploration Ltd. application to modify a sweet gas processing facility McLeod Field
Date
1999
Applicant
Rio Alto Exploration Ltd.
Application Number
1030648
Hearing Panel
Bietz BF
Berg AJ
Hurst TM
Hearing Type
Board
Category
Gas processing
Descriptors
Environmental impact
Expansion
Gas processing plant
Guide 56
ID 94-04
McLeod Field
Noise (sound)
NTS 83F
Public consultation
Legal References
Energy Resources Conservation Act S29
Oil and Gas Conservation Act S26
Notes
EUB Decision D99-09 on application 1030648 by Rio Alto Exploration to modify a sweet gas processing plant (Lsd 16 Sec 36 Twp 55 Rge15 W5M) by installing 3 additional gas compressors in order to fully utilize the plant's existing processing capacity
Interveners
McLeod Coalition
King L
King W
Ficht J
Ficht B
See J
Approval
Denied
Location
16-36-055-15W5
Less detail

Decision 99-10

https://had.aer.ca/link/decision3048
Applicant
TransAlta Utilities Corporation
Application Number
980631
980632
980633
980634
Title
Decision 99-10: TransAlta Utilities Corporation 138-kV Transmission Facilities in the Joffre - Ellis - Gaetz Areas
Date
1999
Title
Decision 99-10: TransAlta Utilities Corporation 138-kV Transmission Facilities in the Joffre - Ellis - Gaetz Areas
Date
1999
Applicant
TransAlta Utilities Corporation
Application Number
980631
980632
980633
980634
Hearing Panel
Bietz BF
Sharp KG
Nichol JR
Hearing Type
Board
Utilities
Category
Transmission line
Descriptors
Electric substation
Joffre area
NTS 83A
Red Deer area
Transmission line
Legal References
Hydro and Electric Energy Act S12
Hydro and Electric Energy Act S14
Hydro and Electric Energy Act S17
Notes
EUB Decision D99-10 on applications by TransAlta: Application 980631 to construct Ellis substation CB 332S, alter existing Union Carbide Prentiss substation CP 276S and re-designate as Prentiss substation CP 276S, construct 138-kV transmission line from Union Carbide Prentiss substation to Ellis substation; Application 980632 to alter existing Joffre substation CP 535S; Application 980633 to construct 138-kV transmission line CP 784L from Joffre to Ellis; Application 980634 to salvage existing 138-kV line CP 756L from Joffre to Gaetz substation and construct double-circuit 138-kV transmission line CP 756L/793L along same right of way and to alter the Gaetz substation CP 87S. The facilities are required to serve plant expansions at both Nova Chemicals Joffre plant site and Union Carbide's Prentiss plant; and some of the facilities would be used to transport electrical energy from Nova's cogeneration plant (currently under construction) into the Alberta Interconnected System for sale to the Power Pool;
Board Hearing (Red Deer): 1999-04-20/21
Approved (980631, 980632, 980633)
Deferred (980634)
Interveners
Transmission Administrator (TA)
Oakley C
NOVA Chemicals Corporation (NOVA)
Bourdon P
Ferris D
Steffan R
Union Carbide Incorporated (Union Carbide)
Cooke M
Moore F
Slaughter R
County of Lacombe (the County)
Sharp M
774L Interveners:
Cameron L
Phillips S
Risser C
756L/793L Interveners:
Bower D
Featherstone D
Morrison P
Morrison S
Munce J
Poettcker J
Solick H
Approval
Approved
Deferred
Less detail

77 records – page 1 of 4.