2010 records – page 1 of 101.

Application 1000865

https://had.aer.ca/link/application38617
Applicant
Stampeder Exploration Ltd.
Ballistic Energy Corporation
Summary
Requesting approval to expand the Enchant Arcs J and V V pools, add the wells located in 14-20, 14-29, 7-30 and 1-31-13-16W4 to the list of approved water injectors and delete the well located in 2/3-32-13-16W4 from the list of approved water injectors. Transfer Approval No. 7772 from Ballistic Energy Corporation to Stampeder Exploration Ltd.
Decision/Order/Approval
Approval 7772B
Approval 7772C
Date Registered
Jun 04, 1997
Applicant
Stampeder Exploration Ltd.
Ballistic Energy Corporation
Summary
Requesting approval to expand the Enchant Arcs J and V V pools, add the wells located in 14-20, 14-29, 7-30 and 1-31-13-16W4 to the list of approved water injectors and delete the well located in 2/3-32-13-16W4 from the list of approved water injectors. Transfer Approval No. 7772 from Ballistic Energy Corporation to Stampeder Exploration Ltd.
Category
Oil
Descriptors
Enhanced recovery
Amendment
Water injection
Legal changes
Approval operator change
Area
Enchant Arcs J
Enchant Arcs VV
Date Registered
Jun 04, 1997
Decision/Order/Approval
Approval 7772B
Approval 7772C
Less detail

Application 1000892

https://had.aer.ca/link/application38619
Applicant
Mobil Oil Canada
Summary
Requesting approval to amend Approval No. 6476 by lowering the approved operating pressure, remove the water producer 2-14-110-6W6 and remove the minimum solvent bank size, for the Rainbow Keg River AA pool.
Decision/Order/Approval
Approval 6476A
Date Registered
Jun 05, 1997
Applicant
Mobil Oil Canada
Summary
Requesting approval to amend Approval No. 6476 by lowering the approved operating pressure, remove the water producer 2-14-110-6W6 and remove the minimum solvent bank size, for the Rainbow Keg River AA pool.
Category
Oil
Descriptors
Enhanced recovery
Amendment
Water injection
Area
Rainbow Keg River AA
Date Registered
Jun 05, 1997
Decision/Order/Approval
Approval 6476A
Less detail

Application 1000984

https://had.aer.ca/link/application38618
Applicant
Rio Alto Exploration Ltd.
Summary
Requesting approval to rescind the enhanced recovery scheme by water injection Approval No. 5749, which also involves concurrent production for the Waskahigan Dunvegan A pool.
Decision/Order/Approval
Approval 5449A
Date Registered
Jun 11, 1997
Applicant
Rio Alto Exploration Ltd.
Summary
Requesting approval to rescind the enhanced recovery scheme by water injection Approval No. 5749, which also involves concurrent production for the Waskahigan Dunvegan A pool.
Category
Oil
Descriptors
Concurrent production
Enhanced recovery
Amendment
Water injection
Area
Waskahigan Dunvegan A
Date Registered
Jun 11, 1997
Decision/Order/Approval
Approval 5449A
Less detail

Application 1001602

https://had.aer.ca/link/application38620
Applicant
Samedan Oil of Canada Inc.
Summary
Requesting approval to commingle gas production from the Kaybob South Bluesky P and Kaybob South Gething CC pools through the 10-22-61-20W5 well.
Decision/Order/Approval
MU 1481
Date Registered
Jul 18, 1997
Applicant
Samedan Oil of Canada Inc.
Summary
Requesting approval to commingle gas production from the Kaybob South Bluesky P and Kaybob South Gething CC pools through the 10-22-61-20W5 well.
Category
Gas
Descriptors
Commingled production
Area
Kaybob South Bluesky P
Kaybob South Gething CC
Date Registered
Jul 18, 1997
Decision/Order/Approval
MU 1481
Less detail

Application 1004218

https://had.aer.ca/link/application37633
Applicant
Amoco Canada Petroleum Company Ltd.
Summary
Requesting approval to construct and operate a sour gas processing facility in the Big Bend field. The facility would be located in 8-15-67-2W5.
Decision/Order/Approval
Withdrawn by letter dated 19970225. Hearing cancelled by Notice dated 19970306
Date Registered
Feb 06, 1997
Applicant
Amoco Canada Petroleum Company Ltd.
Summary
Requesting approval to construct and operate a sour gas processing facility in the Big Bend field. The facility would be located in 8-15-67-2W5.
Category
Gas
Descriptors
Gas processing
Gas plant
Sour gas
Area
Big Bend
Date Registered
Feb 06, 1997
Decision/Order/Approval
Withdrawn by letter dated 19970225. Hearing cancelled by Notice dated 19970306
Hearing Location
AEUB, 640 - 5 Avenue S.W., Calgary, Ab
Interventions
1
Less detail

Application 1004737

https://had.aer.ca/link/application37584
Applicant
Response Energy Corporation
Summary
Requesting approval to establish a holding in the S.E. quarter of section 14-49-1W4, for the production of oil from the Lloydminster field.
Decision/Order/Approval
SU 2807
Date Registered
Jan 06, 1997
Applicant
Response Energy Corporation
Summary
Requesting approval to establish a holding in the S.E. quarter of section 14-49-1W4, for the production of oil from the Lloydminster field.
Category
Oil
Descriptors
Spacing units
Holding
Area
Lloydminster
Date Registered
Jan 06, 1997
Decision/Order/Approval
SU 2807
Related Application
1005504
Less detail

Application 1004742

https://had.aer.ca/link/application37952
Applicant
Baytex Energy Ltd.
Summary
Requesting approval for reduced drilling spacing units of two legal subdivisions and to establish a holding in section 17-46-1W5, for the production of oil from the Pembina Belly River Group.
Decision/Order/Approval
SU 2794C
Date Registered
Jan 06, 1997
Applicant
Baytex Energy Ltd.
Summary
Requesting approval for reduced drilling spacing units of two legal subdivisions and to establish a holding in section 17-46-1W5, for the production of oil from the Pembina Belly River Group.
Category
Oil
Descriptors
Spacing units
Holding
Special drilling spacing units
Area
Pembina
Date Registered
Jan 06, 1997
Decision/Order/Approval
SU 2794C
Related Application
1004097
1004561
1004742
Less detail

Application 1004745

https://had.aer.ca/link/application37799
Applicant
J.M. Huber Canada Limited
Summary
Requesting approval to amend Approval No. 3283 by expanding Project No. 2 by including the well at 10-18-51-9W5, located in the Bigoray Cardium B pool.
Decision/Order/Approval
Approval 3283G
Date Registered
Jan 06, 1997
Applicant
J.M. Huber Canada Limited
Summary
Requesting approval to amend Approval No. 3283 by expanding Project No. 2 by including the well at 10-18-51-9W5, located in the Bigoray Cardium B pool.
Category
Oil
Descriptors
Enhanced recovery
Amendment
Water injection
Area
Bigoray Cardium B
Date Registered
Jan 06, 1997
Decision/Order/Approval
Approval 3283G
Less detail

Application 1004763

https://had.aer.ca/link/application38233
Applicant
Gulf Canada Resources Limited
Summary
Requesting approval to amend Approval No. 7364 by adding the well S0/4-17-65-10W5 (surface location 7-7-65-10W5) to the list of approved solvent injectors in Area 2, Swan Hills South Beaverhill Lake A and B pools.
Decision/Order/Approval
Approval 7364B
Date Registered
Jan 07, 1997
Applicant
Gulf Canada Resources Limited
Summary
Requesting approval to amend Approval No. 7364 by adding the well S0/4-17-65-10W5 (surface location 7-7-65-10W5) to the list of approved solvent injectors in Area 2, Swan Hills South Beaverhill Lake A and B pools.
Category
Oil
Descriptors
Enhanced recovery
Amendment
Miscible flood
Area
Swan Hills South Beaverhill Lake A
Swan Hills South Beaverhill Lake B
Date Registered
Jan 07, 1997
Decision/Order/Approval
Approval 7364B
Related Application
1006836
Notes
This Application is filed with the Related Application 1006836
Less detail

Application 1004764

https://had.aer.ca/link/application38131
Applicant
Fletcher Challenge Energy Canada Inc.
Summary
Requesting approval to establish a holding in Lsd's 9, 14, 15 and 16-11-37-7W4, for the production of oil from the Provost field.
Decision/Order/Approval
SU 2775D
Date Registered
Jan 06, 1997
Applicant
Fletcher Challenge Energy Canada Inc.
Summary
Requesting approval to establish a holding in Lsd's 9, 14, 15 and 16-11-37-7W4, for the production of oil from the Provost field.
Category
Oil
Descriptors
Spacing units
Holding
Amendment
Area
Provost
Date Registered
Jan 06, 1997
Decision/Order/Approval
SU 2775D
Related Application
1003070
1003225
1003417
1003494
1003679
1003680
1003806
1004234
1004235
1004594
1004764
1004784
1005065
Less detail

Application 1004774

https://had.aer.ca/link/application37582
Applicant
PanCanadian Petroleum Limited
Summary
Requesting approval for reduced spacing units to one legal subdivision and to establish a holding in the west half and in the S.W. quarter in section 3-41-1W4, for the production of oil from the Hayter field.
Decision/Order/Approval
SU 2213E
Date Registered
Jan 06, 1997
Applicant
PanCanadian Petroleum Limited
Summary
Requesting approval for reduced spacing units to one legal subdivision and to establish a holding in the west half and in the S.W. quarter in section 3-41-1W4, for the production of oil from the Hayter field.
Category
Oil
Descriptors
Spacing units
Special drilling spacing units
Holding
Area
Hayter
Date Registered
Jan 06, 1997
Decision/Order/Approval
SU 2213E
Less detail

Application 1004784

https://had.aer.ca/link/application38132
Applicant
OGY Petroleums Ltd.
Marlex Engineering Ltd.
Summary
Requesting approval to establish a holding in parts of sections 24, 25, 30, 31 and 36-36-5W5, for the production of oil from the Provost field.
Decision/Order/Approval
SU 2775D
Date Registered
Jan 07, 1997
Applicant
OGY Petroleums Ltd.
Marlex Engineering Ltd.
Summary
Requesting approval to establish a holding in parts of sections 24, 25, 30, 31 and 36-36-5W5, for the production of oil from the Provost field.
Category
Oil
Descriptors
Spacing units
Amendment
Holding
Area
Provost
Date Registered
Jan 07, 1997
Decision/Order/Approval
SU 2775D
Related Application
1003070
1003225
1003417
1003494
1003679
1003680
1003806
1004234
1004235
1004594
1004764
1004784
1005065
Less detail

Application 1004799

https://had.aer.ca/link/application37876
Applicant
Hartwell Petroleums Ltd.
Summary
Requesting approval to modify the Doris gas plant located at 2-23-64-6W5. The modifications include the installation of a de-ethanizer tower, reboiler, aerial cooler and LPG storage bullet.
Decision/Order/Approval
Approval 1997-659
Date Registered
Jan 07, 1997
Applicant
Hartwell Petroleums Ltd.
Summary
Requesting approval to modify the Doris gas plant located at 2-23-64-6W5. The modifications include the installation of a de-ethanizer tower, reboiler, aerial cooler and LPG storage bullet.
Category
Gas
Descriptors
Gas processing
Amendment of gas plant facilities
Area
Doris
Date Registered
Jan 07, 1997
Decision/Order/Approval
Approval 1997-659
Less detail

Application 1004834

https://had.aer.ca/link/application38529
Applicant
Canadian 88 Energy Corp.
Summary
Requesting approval to construct and operate two pipelines which would run in parallel in the same ditch from the Burmis well surface location 16-7-7-3W5, to connect to the Shell Waterton pipeline infrastructure located at Junction J in 1-7-6-2W5. The pipelines would be used to transport sour natural gas.
Decision/Order/Approval
Decision 97-16
Addendum to Decision 97-16
Date Registered
Jan 09, 1997
Applicant
Canadian 88 Energy Corp.
Summary
Requesting approval to construct and operate two pipelines which would run in parallel in the same ditch from the Burmis well surface location 16-7-7-3W5, to connect to the Shell Waterton pipeline infrastructure located at Junction J in 1-7-6-2W5. The pipelines would be used to transport sour natural gas.
Category
Pipeline
Descriptors
Pipelines
Permit
Area
Burmis
Date Registered
Jan 09, 1997
Decision/Order/Approval
Decision 97-16
Addendum to Decision 97-16
Hearing Location
Heritage Inn, 919 Waterton Avenue, Pincher Creek, Ab
Interventions
15
Exhibits
42
Related Application
1004834
1010138
Special Report
Burmis Pipeline Environmental Assessment, by Axys Environmental Consulting Ltd., dated December 1996
Gas Composition Determination, by Chapman Petroleum Engineering Ltd., dated 199709
Single Point Deliverability Test Report, by Chapman Petroleum Engineering Ltd., dated 199701
Single Point Deliverability Test Report, by Chapman Petroleum Engineering Ltd., dated 199612
Single Point Deliverability Test Report, by Chapman Petroleum Engineering Ltd., dated 199
Pipeline Maintenance Plans, by Neo Corr Engineering Ltd., dated 199709
Sour Gas Line Failure, by Canspec Group Inc., dated 19970905
Less detail

Application 1004857

https://had.aer.ca/link/application37935
Applicant
The Wiser Oil Company Canada Ltd.
Summary
Requesting approval to establish a holding in the north half of section 4 and in the south half of section 9, Township 87-11W5, for the production of oil from the Evi Keg River and Evi Granite Wash formations.
Decision/Order/Approval
Deregistered by letter dated 19980303
Date Registered
Jan 08, 1997
Applicant
The Wiser Oil Company Canada Ltd.
Summary
Requesting approval to establish a holding in the north half of section 4 and in the south half of section 9, Township 87-11W5, for the production of oil from the Evi Keg River and Evi Granite Wash formations.
Category
Oil
Descriptors
Spacing units
Holding
Area
Evi
Date Registered
Jan 08, 1997
Decision/Order/Approval
Deregistered by letter dated 19980303
Related Application
1008530
Notes
This Application is filed with the Related Application(s)
Less detail

Application 1004858

https://had.aer.ca/link/application37574
Applicant
Baytex Energy Ltd.
Summary
Requesting approval to establish a holding and reduced drilling spacing units in section 10-41-19W4, for the production of oil from the Donalda field.
Decision/Order/Approval
SU 2189A
Date Registered
Jan 08, 1997
Applicant
Baytex Energy Ltd.
Summary
Requesting approval to establish a holding and reduced drilling spacing units in section 10-41-19W4, for the production of oil from the Donalda field.
Category
Oil
Descriptors
Spacing units
Special drilling spacing units
Holding
Area
Donalda
Date Registered
Jan 08, 1997
Decision/Order/Approval
SU 2189A
Less detail

Application 1004859

https://had.aer.ca/link/application37620
Applicant
Ocelot Energy Inc.
Summary
Requesting approval to establish a holding in the south half of section 14-37-3W5, for the production of oil from the Sylvan Lake Pekisko U pool.
Decision/Order/Approval
SU 2781D
Date Registered
Jan 08, 1997
Applicant
Ocelot Energy Inc.
Summary
Requesting approval to establish a holding in the south half of section 14-37-3W5, for the production of oil from the Sylvan Lake Pekisko U pool.
Category
Oil
Descriptors
Spacing units
Holding
Area
Sylvan Lake Pekisko U
Date Registered
Jan 08, 1997
Decision/Order/Approval
SU 2781D
Related Application
1004665
Notes
This Application is filed with/under Application # 1004665
Less detail

Application 1004860

https://had.aer.ca/link/application37652
Applicant
EnerMark Inc.
Summary
Transfer of the enhanced recovery Approval No. 2812 from Koch Exploration Canada Ltd. to EnerMark Inc.
Decision/Order/Approval
Approval 2812D
Date Registered
Jan 08, 1997
Applicant
EnerMark Inc.
Summary
Transfer of the enhanced recovery Approval No. 2812 from Koch Exploration Canada Ltd. to EnerMark Inc.
Category
Oil
Descriptors
Legal changes
Approval operator change
Area
Wildmere Lloydminster A
Date Registered
Jan 08, 1997
Decision/Order/Approval
Approval 2812D
Less detail

Application 1004874

https://had.aer.ca/link/application38096
Applicant
PanCanadian Petroleum Limited
Summary
Requesting approval to increase the natural gas inlet rate at the Empress Straddle Plant located at 15 and 16-2-20-1W4, Approval No. 7390.
Decision/Order/Approval
Denied by letter dated 19970115
Date Registered
Jan 10, 1997
Applicant
PanCanadian Petroleum Limited
Summary
Requesting approval to increase the natural gas inlet rate at the Empress Straddle Plant located at 15 and 16-2-20-1W4, Approval No. 7390.
Category
Gas
Descriptors
Gas processing
Amendment
Gas plant
Area
Empress
Date Registered
Jan 10, 1997
Decision/Order/Approval
Denied by letter dated 19970115
Less detail

Application 1004886

https://had.aer.ca/link/application37798
Applicant
Blackwolf Resources Inc.
Summary
Requesting approval to establish a holding in the north half of section 5-21-8W4, located in the Jenner area.
Decision/Order/Approval
SU 2276I
Date Registered
Jan 10, 1997
Applicant
Blackwolf Resources Inc.
Summary
Requesting approval to establish a holding in the north half of section 5-21-8W4, located in the Jenner area.
Category
Oil
Descriptors
Spacing units
Holding
Area
Jenner
Date Registered
Jan 10, 1997
Decision/Order/Approval
SU 2276I
Less detail

2010 records – page 1 of 101.