Decision 91-03
https://had.aer.ca/link/decision55
- Applicant
- TransAlta Utilities Corporation
- Application Number
- 901809
- Title
- Examiner report on application by TransAlta Utilities Corporation, 1991 (138-KV transmission line facilities Edson-Hinton area)
- Date
- 1991
- Title
- Examiner report on application by TransAlta Utilities Corporation, 1991 (138-KV transmission line facilities Edson-Hinton area)
- Date
- 1991
- Applicant
- TransAlta Utilities Corporation
- Application Number
- 901809
- Hearing Panel
- Homeniuk TF
- Mazurek LA
- Henderson DIR
- Hearing Type
- Examiners
- Utilities
- Category
- Transmission line
- Descriptors
- Edson area
- Electric substation
- Hinton area
- Transmission line
- Environmental impact
- Land use
- Locating
- NTS 83F
- Residential building
- Route selection
- Legal References
- Hydro and Electric Energy Act S12
- Hydro and Electric Energy Act S14
- Hydro and Electric Energy Act S16
- Hydro and Electric Energy Act S17
- Hydro and Electric Energy Act S18
- Hydro and Electric Energy Act S20
- Notes
- ERCB Examiners report E91-3 on application No. 901809 to construct 75 km of 138-KV transmission line between existing Bickerdike substation 39S and proposed Cold Creek substation 602S and designate it as transmission line 847L; construct 4 km of 138-KV transmission line from existing transmission line 745L, where it crosses highway 16 in the Town of Hinton, to proposed Cold Creek substation 602S; construct a 138-KV substation near Hinton and designate it as Cold Creek substation 602S; alter Bickerdike substation 39S; salvage Hinton substation 386S; salvage that portion of transmission line 745L between highway 16 and Hinton substation 386S; connect the aforementioned facilities with the applicant's transmission system and operate them.
- Interveners
- Evergreen Properties Inc.
- North Road Lumber and Building Supplies Ltd.