Decision 91-06|91-06 Addendum
https://had.aer.ca/link/decision47
- Applicant
- Imperial Pipe Line Company Limited
- ESSO Resources (1989) Limited
- Northwestern Utilities Limited
- Application Number
- 910114
- 910115
- 910116
- 910505
- Title
- Decision 91-06 : Imperial Pipe Line Company Limited, ESSO Resources (1989) Limited and Northwestern Utilities Limited : Application to change substance in Edmonton to Sundre pipeline from blended bitumen to natural gas and for associated pipeline facilities and connections, and to reconsider approval Federated Pipe Lines Limited natural gas liquids pipeline (and addendum)
- Date
- 1991
- Title
- Decision 91-06 : Imperial Pipe Line Company Limited, ESSO Resources (1989) Limited and Northwestern Utilities Limited : Application to change substance in Edmonton to Sundre pipeline from blended bitumen to natural gas and for associated pipeline facilities and connections, and to reconsider approval Federated Pipe Lines Limited natural gas liquids pipeline (and addendum)
- Date
- 1991
- Applicant
- Imperial Pipe Line Company Limited
- ESSO Resources (1989) Limited
- Northwestern Utilities Limited
- Application Number
- 910114
- 910115
- 910116
- 910505
- Hearing Panel
- Mink FJ
- Sharp KG
- Nichol JR
- Hearing Type
- Board
- Category
- Pipelines
- Descriptors
- Caroline area
- Caroline field
- Gas pipeline
- Gathering line
- Pipeline construction permit
- Oil pipeline
- Product pipeline
- Blowdown
- Capacity
- Deliverability
- Economic factor
- Gas removal
- Golden Spike area
- Golden Spike field
- Leduc field
- NTS 83B
- NTS 83H
- Reservoir pressure
- Standard
- Transportation system
- Legal References
- Pipeline Act S8
- Notes
- Decision D91-6 on application No. 910114 by Imperial for a permit to construct .80 km of 168.3 MM OD pipeline to connect the Edmonton to Sundre expansion pipeline (ESEP) to an existing pipeline in the Bonnie Glen area; on application No. 910115 by ESSO to discontinue the use of 9.5 km portion of its existing 168.3 MM OD ethane pipeline in the Bonnie Glen area, licence No. 21001; on application No. 910116 by Imperial to amend licence No. 21719 to convert 95 km portion of the 323.9 MM OD ESEP between Ellerslie and Homeglen from crude oil to natural gas service, to convert .03 km crude oil pipeline, licence No. 15440 to natural gas service in the Ellerslie area, to convert 9.9 km portion of existing ESSO ethane pipeline, licence No. 21001 to natural gas service in the Bonnie Glen area; on application No. 910357 by NUL to vary ERCB D90-8 with respect to application No. 891483 by Federated to transport natural gas liquids to an existing Federated pipeline near the ESSO Bonnie Glen gas plant; on application No. 910505 to construct a 3.3 MW compressor station and related facilities in LSD 14-11-49-25 W4M; Board hearing held 1991-04-30, 1991-05-1/2; addendum dated 1992-02-28 reviews the location and effects of the proposed compressor station
- Interveners
- Northwestern Utilities Limited
- Federated Pipe Lines Limited
- Shell Canada Limited
- Morrison, T.W.
- Young, P.A.
- Conoco Inc.
- Location
- 14-11-049-25W4