Decision 2013-13
https://had.aer.ca/link/decision4510
- Applicant
- Kallisto Energy Corp.
- Application Number
- 1735722
- Title
- Decision 2013-013 : Kallisto Energy Corp. application for a well licence Crossfield East field
- Date
- 2013
- Title
- Decision 2013-013 : Kallisto Energy Corp. application for a well licence Crossfield East field
- Date
- 2013
- Applicant
- Kallisto Energy Corp.
- Application Number
- 1735722
- Hearing Panel
- Watson TL
- McManus BT
- Eynon G
- Hearing Type
- Board
- Category
- Well licence
- Storage facility
- Descriptors
- Well licence
- Crude oil
- Elkton FM
- Hydrogen sulphide
- Emergency response plan
- Airdrie area
- Land use
- Risk
- Gas storage
- Legal References
- Oil and Gas Conservation Regulations S2.020
- Responsible Energy Development Act (REDA)
- Oil and Gas Conservation Regulations S7.001
- Notes
- Change to legal citation effective January 2011
- Interveners
- CrossAlta Gas Storage & Service Ltd.
- TransCanada Pipelines Ltd.
- TransCanada Energy Ltd
- Taks M
- Verbeurgt K
- Approval
- Approved with conditions
- Conditions
- CONDITIONS Drilling and Completion 1) Kallisto must not fracture stimulate the 16-26 well. 2) Kallisto must a) run an initial full-length cement integrity log before completion. b) conduct a hydraulic isolation log after completion and stimulation Abandonment 3) Kallisto must a) for open hole abandonment, run a continuous cement plug from total depth to a minimum of 30 metres above the top of the Elkton Formation. The cement plug top must be confirmed by tagging, not logging. b) in the event that the well is cased, completed, and abandoned, conduct a cement squeeze of the perforated interval and fill the casing with cement to a minimum of 15 metres above the top of the Elkton Formation. If future well abandonment requirements exceed these conditions, the more stringent requirements will apply. Measurement 4) Kallisto must a) submit an initial pressure test completed in accordance with Directive 040: Pressure and Deliverability Testing Oil and Gas Wells. b) install a three phase separator to separate the gas, emulsion, and water before commingling with other well effluent. c) install appropriate measurement devices to measure the three phases according to the delivery point requirements in Directive 017: Measurement Requirements for Oil and Gas Operations, except for water measurement. d) approve, inspect, and calibrate the measurement devices according to the delivery point requirements in Directive 017: Measurement Requirements for Oil and Gas Operations, except for water measurement. e) install continuous sampling devices for the gas phase after separation according to requirements in Directive 017: Measurement Requirements for Oil and Gas Operations and analyze the gas sample once every two weeks, at a minimum. f) install proportional sampling devices to determine the water cut at least once per week for the emulsion phase according to requirements in Directive 017: Measurement Requirements for Oil and Gas Operations or install a continuous water-cut analyzer. g) ensure the well head separator does not have an operating pressure greater than 4200 kPa (600 psi). Disclosure of Confidential Information 5) Kallisto must provide all confidential information related to the 16-26 well to CrossAlta and the Freehold mineral owners (Jensen and Taks families). Production Reporting 6) Kallisto must report any production from the 16-26 well to PETRINEX as a single oil well battery. 2013
- Location
- 16-26-027-01W5