Decision 99-19
https://had.aer.ca/link/decision3088
- Applicant
- Fletcher Challenge Energy Canada Inc.
- Application Number
- 1033164
- 1033789
- Title
- Decision 99-19 : Fletcher Challenge Energy Canada Inc. application for an approval to construct a sweet multiwell battery Leduc area
- Date
- 1999
- Title
- Decision 99-19 : Fletcher Challenge Energy Canada Inc. application for an approval to construct a sweet multiwell battery Leduc area
- Date
- 1999
- Applicant
- Fletcher Challenge Energy Canada Inc.
- Application Number
- 1033164
- 1033789
- Hearing Panel
- Miller GJ
- Dunn GC
- Houlihan RN
- Hearing Type
- Board
- Category
- Oil production
- Descriptors
- Battery
- Environmental impact
- Guide 60
- Leduc area
- NTS 83H
- Locating
- Gas flaring
- Groundwater
- Public consultation
- Legal References
- Oil and Gas Conservation Regulations S7.001
- Notes
- EUB decision D99-19 on applications no. 1033164 and 1033789 by Fletcher Challenge Energy Canada Inc. to construct a sweet multiwell battery located at 11-26-48-26 W4M
- Interveners
- Loose G
- Loose C
- Bucsis L
- Peter E
- Balzer D
- Beck B
- Capital Health Authority
- Dupierry R
- Knull G
- Faulkner G
- Langert H
- Labrecque A
- Benfeld C
- Peden I
- Jasper M
- Approval
- Approved
- Approved with conditions
- Conditions
- Battery design will include vapour recovery unit
- Fletcher will finalize agreement with Probe to receive and treat oil emulsion at Probe facility at 13-8-49-25- W4M when ATCO Watelet plant is unable
- Lease site will be bermed to prevent surface runoff
- Fletcher will test the water wells of residents if requested
- Fletcher will address the adequacy of culverts on access road
- Fletcher will use electric drive compressors to reduce noise from theh battery
- Fletcher will establish committee to address commitments, including the development of an air monitoring program
- Location
- 11-26-048-26W4