Decision 98-02
https://had.aer.ca/link/decision2911
- Applicant
- Thunder Energy Inc.
- Application Number
- 1007719
- 1013399
- Title
- Examiner report on application by Thunder Energy Inc., 1998 (applications to modify an existing sweet gas processing facility and increase the hydrogen sulphide concentration of existing pipelines Kelsey area)
- Date
- 1998
- Title
- Examiner report on application by Thunder Energy Inc., 1998 (applications to modify an existing sweet gas processing facility and increase the hydrogen sulphide concentration of existing pipelines Kelsey area)
- Date
- 1998
- Applicant
- Thunder Energy Inc.
- Application Number
- 1007719
- 1013399
- Hearing Panel
- Langlo CA
- Habib GA
- Pesta TJ
- Hearing Type
- Examiners
- Category
- Gas processing
- Pipelines
- Notes
- EUB Examiner Report 98-02 on application no. 1007719 to modify an existing sweet gas processing facility located in Lsd 11 of Sec 16 Twp 44, Rge 18, W4M (the Kelsey plant) to a sour gas processing facility and on application no. 1013399 to increase the hydrogen sulphide content of natural gas in three existing sweet gas pipelines in Townships 43 and 44, Range 18, W4M; Examiners hearing 1998-01-20/21
- Interveners
- Canadian Natural Resources Limited
- Signalta Resources Limited
- Alberta Surface Rights Federation
- Anderson D
- Anderson R
- Bowie T
- Enright R
- Approval
- Approved
- Location
- 11-16-044-18W4