Decision 97-18
https://had.aer.ca/link/decision2895
- Applicant
- ANG Gathering and Processing Limited
- Application Number
- 1007783
- Title
- Decision 97-18: ANG Gathering & Processing Ltd. : Application to construct sour natural gas pipelines Edson area
- Date
- 1997
- Title
- Decision 97-18: ANG Gathering & Processing Ltd. : Application to construct sour natural gas pipelines Edson area
- Date
- 1997
- Applicant
- ANG Gathering and Processing Limited
- Application Number
- 1007783
- Hearing Panel
- Prince JP
- Miller GJ
- Hurst TM
- Hearing Type
- Board
- Category
- Pipelines
- Descriptors
- Pipeline construction permit
- Edson area
- Emergency procedure
- Gas pipeline
- Land value
- Risk
- Route selection
- Safety
- Sour gas
- NTS 83F
- NTS 83K
- Legal References
- Pipeline Act Part 4
- Notes
- EUB Decision D97-18 on application no. 1007783 by ANG Gathering & Processing Ltd. for a permit to construct a sour gas (up to 275 mol/kmol) pipeline for a 222 km gas gathering system from Lsd 5, Sec 19 Twp 57 Rge 5 W5M to existing facilities at Lsd 8 Sec 4 Twp 59 Rge 23 W5M, Lsd 5 Sec 25 Twp 51 Rge 22 W5m and Lsd 5 Sec 1 Twp 53 Rge18 W5M
- Preliminary approval given to pipeline route except for 35 km section that terminates at Talisman Edson gas processing plant; detailed reasons for decision to be issued at later date
- Board hearing 1997-10-21 and 1997-12-09
- Interveners
- Bev Collin Holdings Ltd.
- Smith K
- Behrens W
- Bugg H
- Rautio R
- Approval
- Denied
- Approved with conditions
- Conditions
- To follow
- Location
- 05-19-057-05W5
- 08-04-059-23W5
- 05-25-051-22W5
- 05-01-053-18W5