Decision 94-04
https://had.aer.ca/link/decision2519
- Applicant
- Baloil Resources Ltd.
- Application Number
- 931409
- Title
- Examiner report on application by Baloil Resources Ltd., 1994 (Zama Lake power plant)
- Date
- 1994
- Title
- Examiner report on application by Baloil Resources Ltd., 1994 (Zama Lake power plant)
- Date
- 1994
- Applicant
- Baloil Resources Ltd.
- Application Number
- 931409
- Hearing Panel
- Prince JP
- Evans RG
- Barfett AC
- Dunstan NJR
- Hearing Type
- Examiners
- Utilities
- Category
- Electric power
- Descriptors
- Electric power generation
- Electric power rate
- Non-utility generation
- Power system interconnection
- Zama Virgo basin
- Compensation
- Legal References
- Hydro and Electric Energy Act S17
- Notes
- ERCB decision D94-7 and examiners report E94-4 on application no. 931409 to order Alberta Power to connect with and take the electric energy generated by Baloil's proposed power plant at Zama Lake; to establish terms and conditions for determining the basis for payment of compensation by APL for the electric power that would be generated; and adopt the views and recommendations in the ERCB/PUB Small Power Inquiry Report as the basis for setting compensation; and to determine the amount of compensation payable for the electric power that would be generated and set the price for that energy at 4.7 cents per kWh; Concurrent ERCB/PUB hearing 1994-02-08
- Interveners
- Alberta Power Limited
- The City of Lethbridge
- The Town of Fort MacLeod
- TransAlta Utilities Corporation
- Industrial Power Consumers Association
- Municipal Intervenors
- City of Calgary
- Edmonton Power
- Alberta Cogenerators Council