Decision 82-G
https://had.aer.ca/link/decision2464
- Applicant
- Canadian Hunter Exploration Ltd.
- Sulpetro Limited
- Chevron Standard Limited
- Application Number
- 820323
- 820354
- 820101
- Title
- Gas processing plant expansions Decision on application by Canadian Hunter Exploration Ltd., 1982 (gas plant expansion, Elmworth field); Decision on application by Sulpetro Limited, 1982 (gas plant expansion, Wapiti, Elmworth area); Decision on application by Chevron Standard Limited, 1982 (gas plant expansion, Kaybob south field)
- Date
- 1982
- Title
- Gas processing plant expansions Decision on application by Canadian Hunter Exploration Ltd., 1982 (gas plant expansion, Elmworth field); Decision on application by Sulpetro Limited, 1982 (gas plant expansion, Wapiti, Elmworth area); Decision on application by Chevron Standard Limited, 1982 (gas plant expansion, Kaybob south field)
- Date
- 1982
- Application Number
- 820323
- 820354
- 820101
- Hearing Panel
- DeSorcy GJ
- Goodman CJ
- Mink FJ
- Hearing Type
- Board
- Category
- Gas processing
- Descriptors
- Elmworth field
- Ethane
- Gas processing plant
- Kaybob South field
- Wapiti field
- Demand (economics)
- Economic analysis
- Energy development
- Enhanced recovery scheme
- Expansion
- Forecasting
- Liquefied natural gas
- Marketing
- Miscible displacement
- NTS 83K
- NTS 83L
- NTS 83M
- Petrochemical industry
- Legal References
- Oil and Gas Conservation Act S26
- Notes
- paper copy missing as of December 2006, see scanned copy in Hummingbird (Document Number 442451)
- 2 volumes (main report and supplement released 1983-08-15)
- Report on application no. 820323 by Canadian Hunter to expand raw gas inlet capacity and extract a mixture of ethane and heavier hydrocarbons (ethane-plus) from gas processed at its Elmworth gas plant located in section 8-70-11 W6M and application no. 820354 by Sulpetro to extract ethane-plus at its Wapiti gas plant in LSD 4-8-69-8 W6M and on application no. 820101 by Chevron to extract ethane-plus at the Kaybob south Beaverhill Lake unit no. 3 plant located in section 15-59-18 W5M
- Board hearing 1982-06-15/16/17/18/21/22/23
- See related decision D87-6 for decision on part 2 application by Sulpetro