Decision 76-D
https://had.aer.ca/link/decision2384
- Applicant
- Calgary Power Ltd.
- Application Number
- 8709
- Title
- Decision on application by Calgary Power Ltd, 1976 (extension of time for additional environmental studies regarding the discharge of cooling water from the Wabamun power plant)
- Date
- 1976
- Title
- Decision on application by Calgary Power Ltd, 1976 (extension of time for additional environmental studies regarding the discharge of cooling water from the Wabamun power plant)
- Date
- 1976
- Applicant
- Calgary Power Ltd.
- Application Number
- 8709
- Hearing Panel
- Millard V
- Berkowitz N
- DeSorcy GJ
- Hearing Type
- Board
- Utilities
- Category
- Electric power
- Descriptors
- Electric power plant
- Lake Wabamun
- Wabamun power plant
- Waste heat
- Cooling system
- Environment protection
- NTS 83G
- Weed control
- Notes
- ERCB report 76-D on application No. 8709 to amend approval No. HE 7307 respecting the Wabamun power plant to delay date by which applicant must report on environmental effects of discharge of warm water and the date by which cooling facilities for makeup and blowdown water must be in operation (if they are required).