Decision 87-06
https://had.aer.ca/link/decision221
- Applicant
- Sulpetro Limited
- Application Number
- 850272
- Title
- Decision on application by Sulpetro Limited, 1987 (increased throughput and ethane recovery Wapiti gas plant)
- Date
- 1987
- Title
- Decision on application by Sulpetro Limited, 1987 (increased throughput and ethane recovery Wapiti gas plant)
- Date
- 1987
- Applicant
- Sulpetro Limited
- Application Number
- 850272
- Hearing Panel
- Goodman CJ
- Mink FJ
- Morin EJ
- Hearing Type
- Board
- Category
- Gas processing
- Descriptors
- Elmworth field
- Ethane
- Gas processing plant
- Wapiti field
- Benefit cost analysis
- Demand (economics)
- Design criteria
- Economic analysis
- NTS 83L
- Plant design
- Supply (economics)
- Legal References
- Oil and Gas Conservation Act S26
- Oil and Gas Conservation Regulations S9.020
- Notes
- Decision D87-6 on application No. 850272 to extract ethane- plus from the natural gas processed at the Wapiti gas plant in LSD 4-8-69-8 W6M; Board hearing 1987-01-27/28/29/30 and 1987-02-05/06; see related documents Memorandum of Decision on this application released 1987-01-20 and earlier Decision ERCB report 82-G on part I application
- Interveners
- Dow Chemical Canada Inc.
- Union Carbide Ethylene Oxide/Glycol Company
- C-I-L Inc.
- Novacor Chemicals Ltd.
- Celanese Canada Inc.
- Alberta Gas Ethylene Company Ltd.
- Amoco Canada Petroleum Company Ltd.
- Canadian Hunter Exploration Ltd.
- Dome Petroleum Limited
- Esso Resources Canada Limited
- Gulf Canada Corporation
- Scurry-Rainbow Oil Limited
- Location
- 04-08-069-08W6