Decision 79-16
https://had.aer.ca/link/decision2080
- Applicant
- Calgary Power Ltd.
- Application Number
- 790279
- Title
- Decision on application by Calgary Power Ltd., 1979 (Keephills power plant units 1 and 2 amendment report)
- Date
- 1979
- Title
- Decision on application by Calgary Power Ltd., 1979 (Keephills power plant units 1 and 2 amendment report)
- Date
- 1979
- Applicant
- Calgary Power Ltd.
- Application Number
- 790279
- Hearing Panel
- Millard V
- Goodman CJ
- Warne GA
- Hearing Type
- Board
- Utilities
- Category
- Electric power
- Descriptors
- Electric power project
- Keephills power project
- Thermal power plant
- Coal reserve
- Conflict
- Cooling
- Cooling system
- Design criteria
- Land reclamation
- NTS 83G
- Pipeline
- Plant design
- Reservoir
- Revision
- Waste heat
- Water treating
- Legal References
- Hydro and Electric Energy Act S7
- Hydro and Electric Energy Act S14
- Notes
- Decision 79-16 on application No. 790279 to amend approval No. HE 7852 for changes in layout and design of Keephills thermal power plant relating to cooling pond, circulating water intake & discharge canals, raw water storage pond, make-up & blowdown pipelines, rail access & other associated facilities (TP.51-52, R.3-4, W5M); Board hearing 1979-07-13/19 and 1979-08-30; see earlier Decisions ERCB report 77-AA and Decision 78-12
- Interveners
- Quigg, A.
- Quigg, R.
- Trans World Oil and Gas Ltd.
- Porter Ranches Limited
- Ewashko, J.