Skip header and navigation
AER Historical Applications and Decisions AER HAD
  • New Search
  • Help
  • Selections 0
Print PDF
Toggle Detail View

Decision 81-07

https://had.aer.ca/link/decision2001
Applicant
Algas Engineering Services Limited
Alberta Energy Company Limited
Husky Oil Operations Limited
Application Number
800561
800562
800741
800742
800806
800807
800897
Title
Decision on application by Algas Engineering Services Ltd. and Alberta Energy Company Ltd., 1981 (permits to construct pipelines and related facilities - Lloydminster and Cold Lake, Edmonton and Cold Lake)
Date
1981
More detail
Title
Decision on application by Algas Engineering Services Ltd. and Alberta Energy Company Ltd., 1981 (permits to construct pipelines and related facilities - Lloydminster and Cold Lake, Edmonton and Cold Lake)
Date
1981
Applicant
Algas Engineering Services Limited
Alberta Energy Company Limited
Husky Oil Operations Limited
Application Number
800561
800562
800741
800742
800806
800807
800897
Hearing Panel
DeSorcy GJ
Bohme VE
Strom NA
Hearing Type
Board
Category
Pipelines
Descriptors
Bitumen
Cold Lake area
Condensate
Edmonton area
Lloydminster area
Oil pipeline
Pipeline construction permit
Pump station
Cost analysis
Economic analysis
Environmental impact
Land reclamation
NTS 73E
NTS 73L
NTS 83H
NTS 83I
Pipeline crossing
Pipeline design
Pipeline route
Right of way
Supply (economics)
Notes
Decision on application No. 800561 by Husky for crude oil/bitumen blend pipeline between Cold Lake and Lloydminster refinery and on application No. 800562 by Husky for condensate pipeline from Lloydminster to Cold Lake and on application No. 800741 by AEC to transport condensate from Edmonton to Cold Lake and on application No. 800742 to transport crude bitumen-condensate blend from Cold Lake to Edmonton and on application No. 800807 to construct pumping and measurement facilities at ESSO's Leming plant in LSD 13-5-65-3 W4M and on application No. 800806 by AEC for second pump station in east Edmonton to act as prime mover on condensate pipeline (TP.49-65, R.1-26, W4M); see related decisions 81-19 and 81-29 see also decision D83-14 for decision on an amendment to the route selected
Interveners
Amoco Canada Petroleum Company Limited
BP Exploration Canada Limited
Dome Petroleum Limited
Imperial Oil Limited
Murphy Oil Company Ltd.
Petro-Canada Exploration Inc.
Shell Canada Limited
City of Lloydminister
Edmonton Regional Planning Commission
Community Advisory Comittee of the Cold Lake Region
Lakeland Environmental and Agricultural Protective Society
Cold Lake-Bonnyville Local of the Central Trapper's Association
Mohr, H.J.
Landowners represented by Robertson, Baynton et al.
Schroter Family
Less detail
  • Share
    Facebook Twitter LinkedIn
  • Permalink
External Links
  • Copyright and Disclaimer
  • Privacy Statement
  • Social Media Terms of Use
Contact Us

Phone: 403-297-8311
informationrequest@aer.ca

Connect With Us
  • Twitter
  • LinkedIn
  • YouTube
Alberta Energy Regulator © 2023