Decision 81-17
https://had.aer.ca/link/decision1751
- Applicant
- Alberta Power Limited
- Application Number
- 800961
- Title
- Examiners report on application by Alberta Power Ltd., 1981 (144 KV transmission line AP 285L Sheerness - Bullpound - Wintering Hills phase 2 Michichi Creek)
- Date
- 1981
- Title
- Examiners report on application by Alberta Power Ltd., 1981 (144 KV transmission line AP 285L Sheerness - Bullpound - Wintering Hills phase 2 Michichi Creek)
- Date
- 1981
- Applicant
- Alberta Power Limited
- Application Number
- 800961
- Hearing Panel
- Mink FJ
- Antonio HA
- Wilson JF
- Hearing Type
- Examiners
- Utilities
- Category
- Transmission line
- Descriptors
- Drumheller area
- Electric substation
- Transmission line
- Agricultural land
- Irrigation
- Locating
- NTS 72M
- NTS 82P
- Route selection
- Legal References
- Hydro and Electric Energy Act S9
- Hydro and Electric Energy Act S11
- Hydro and Electric Energy Act S14
- Notes
- ERCB Examiners report no.E81-17 on application No. 800961 to construct and operate a 144 KV transmission connecting the Sheerness power plant to the Bullpound and Wintering Hills substations, and connecting Wintering Hills substation to existing 144 KV line AP 285L, and connecting north end of existing line AP 285L to proposed substation in Michichi Creek area (TP.25-29, R.13-20, W4M).
- Interveners
- Sundance Oil Canada Limited
- The Ranchers
- Russell, C.