Decision 83-08
https://had.aer.ca/link/decision1197
- Applicant
- Alberta Power Limited
- Application Number
- 820924
- Title
- Examiners report on application by Alberta Power Ltd., 1983 (144 KV transmission line AP 7L14 Vermilion-Hill)
- Date
- 1983
- Title
- Examiners report on application by Alberta Power Ltd., 1983 (144 KV transmission line AP 7L14 Vermilion-Hill)
- Date
- 1983
- Applicant
- Alberta Power Limited
- Application Number
- 820924
- Hearing Panel
- Paterson RG
- Hearing Type
- Examiners
- Utilities
- Category
- Transmission line
- Descriptors
- Lloydminster area
- Transmission line
- Locating
- NTS 73E
- Route selection
- Legal References
- Hydro and Electric Energy Act S12
- Hydro and Electric Energy Act S14
- Hydro and Electric Energy Act S16
- Hydro and Electric Energy Act S17
- Hydro and Electric Energy Act S20
- Notes
- ERCB Examiners report E83-8 on application No. 820924 for a permit to construct and licence to operate a 144-KV transmission AP7L14 between the Vermilion and Hill substations (TP.50, R.1-6, W4M).
- Interveners
- Gow, G.
- Pare, H.A.