Decision 82-08
https://had.aer.ca/link/decision1138
- Applicant
- TransAlta Utilities Corporation
- Application Number
- 811025
- Title
- Examiners report on application by TransAlta Utilities Corporation, 1982 (138-KV transmission line CP 172AL Taber-Conrad)
- Date
- 1982
- Title
- Examiners report on application by TransAlta Utilities Corporation, 1982 (138-KV transmission line CP 172AL Taber-Conrad)
- Date
- 1982
- Applicant
- TransAlta Utilities Corporation
- Application Number
- 811025
- Hearing Panel
- Bellows LA
- Yu JNG
- Mazurek LA
- Hearing Type
- Examiners
- Utilities
- Category
- Transmission line
- Descriptors
- Conrad area
- Electric substation
- Taber area
- Transmission line
- Electric power demand
- Environmental impact
- Locating
- NTS 82H
- Route selection
- Legal References
- Hydro and Electric Energy Act S12
- Hydro and Electric Energy Act S14
- Hydro and Electric Energy Act S16
- Hydro and Electric Energy Act S17
- Hydro and Electric Energy Act S18
- Notes
- ERCB Examiners report E82-8 on application No. 811025 to construct and operate a 138-KV transmission, CP 172AL, from existing transmission line CP 172L to proposed Conrad substation (TP.6-10, R.15-16, W4M).
- Interveners
- Shaw, B.R.
- Leahy, G.