Decision 82-28|82-28 Addendum
https://had.aer.ca/link/decision1123
- Applicant
- Dome Petroleum Limited
- Application Number
- 820736
- Title
- Examiners report on application by Dome Petroleum Limited, 1982 (permit to construct multiphase flow lines in the Alsike area) (and addendum)
- Date
- 1982
- Title
- Examiners report on application by Dome Petroleum Limited, 1982 (permit to construct multiphase flow lines in the Alsike area) (and addendum)
- Date
- 1982
- Applicant
- Dome Petroleum Limited
- Application Number
- 820736
- Hearing Panel
- Webber HJ
- Remmer WG
- Moloney JK
- Hearing Type
- Examiners
- Category
- Pipelines
- Descriptors
- Gathering line
- Pipeline construction permit
- Agricultural land
- Battery
- Construction cost
- Cost analysis
- Dissolved gas
- Environmental impact
- Gas conservation
- NTS 83G
- Pipeline route
- Route selection
- Legal References
- Pipeline Act
- Notes
- ERCB Examiners report E82-28 and addendum on application No. 820736 to construct 8.3 km of 88.9 MM outside diameter pipeline to transport sweet multiphase fluids from five wells to a proposed satellite battery in LSD 11-4-49-3 W5M and 7.4 km of 114.3 MM outside diameter pipeline to transport sweet multiphase fluids from proposed satellite battery to existing satellite battery in LSD 16-17-48-3 W5M.
- Interveners
- Capewell, F.
- Szepesy, J.