Decision E78-(p.022)
https://had.aer.ca/link/decision1108
- Applicant
- Imperial Oil Limited
- Fekete and Associates
- Dome Petroleum Limited
- Application Number
- 770384
- 770410
- Title
- Examiners report on application by Imperial Oil Limited, waterflooding and concurrent production of the Niton Basal Quartz B Pool and Examiners report on application by Fekete and Associates on behalf of Dome Petroleum Limited and its partners for pool delineation
- Date
- 1978
- Title
- Examiners report on application by Imperial Oil Limited, waterflooding and concurrent production of the Niton Basal Quartz B Pool and Examiners report on application by Fekete and Associates on behalf of Dome Petroleum Limited and its partners for pool delineation
- Date
- 1978
- Application Number
- 770384
- 770410
- Hearing Panel
- Strom NA
- Evans RG
- Stafford GH
- Hearing Type
- Examiners
- Category
- Concurrent production
- Descriptors
- Concurrent production
- Enhanced recovery scheme
- Niton field
- Reservoir boundary
- Waterflooding
- Basal Quartz Fm
- Gas recovery
- Geologic interpretation
- GOR penalty
- NTS 83G
- Oil recovery
- Oil water contact
- Penalty relief
- Pressure maintenance
- Reservoir characteristic
- Reservoir pressure
- Stratigraphic correlation
- Legal References
- Oil and Gas Conservation Act S5
- Oil and Gas Conservation Act S38
- Notes
- ERCB Examiners report on application No. 770384 for oil recovery enhancement by waterflood and concurrent production of oil and associated gas cap from the niton Basal Quartz B pool and on application No. 770410 by Fekete on behalf of Dome and its partners to amend Order No. G 2209 to delete parts of sections in B pools and add them to the D pool (all in TP.55, R.13, W5M).
- Interveners
- Altana Exploration Company
- Dome Petroleum Limited
- Mobil Oil Canada, Ltd.