Decision 82-01
https://had.aer.ca/link/decision1087
- Applicant
- TransAlta Utilities Corporation
- Application Number
- 810705
- Title
- Examiners report on application by TransAlta Utilities Corporation, 1982, (240 KV double circuit transmission line, Entwistle to Edson and Bickerdike substation)
- Date
- 1982
- Title
- Examiners report on application by TransAlta Utilities Corporation, 1982, (240 KV double circuit transmission line, Entwistle to Edson and Bickerdike substation)
- Date
- 1982
- Applicant
- TransAlta Utilities Corporation
- Application Number
- 810705
- Hearing Panel
- Homeniuk TF
- Antonio HA
- Moloney JK
- Hearing Type
- Examiners
- Utilities
- Category
- Transmission line
- Descriptors
- Edson area
- Electric substation
- Hinton area
- Transmission line
- Electric power demand
- Locating
- NTS 83F
- NTS 83G
- Route selection
- Legal References
- Hydro and Electric Energy Act S12
- Hydro and Electric Energy Act S14
- Hydro and Electric Energy Act S16
- Hydro and Electric Energy Act S17
- Hydro and Electric Energy Act S18
- Notes
- Examiners report E82-01 on application No. 810705 to construct & operate a 240 KV double circuit transmission line from section 20-52-7 W5M south of Entwhistle to a proposed substation near Edson.
- Interveners
- Dionne, C.L.
- Tufty, R.A.
- Quarrie, N.
- Schaning, H.B.
- Leteta, A.