Decision E63-(P.054)
https://had.aer.ca/link/decision1072
- Applicant
- Brinkerhoff Drilling Co. Ltd.
- Application Number
- 1354
- Title
- Examiners report on application by Brinkerhoff Drilling Co. Ltd., 1963 (an order of the Board (A) waiving the provisions of section 9 of the Drilling and Production Regulations and (B) directing that the area to be used as a factor in determining the allowable for the production of gas from the Basal Blairmore member through the well Brink Fargo Hespero 4-5-39-3 be the area of its spacing unit)
- Date
- 1963
- Title
- Examiners report on application by Brinkerhoff Drilling Co. Ltd., 1963 (an order of the Board (A) waiving the provisions of section 9 of the Drilling and Production Regulations and (B) directing that the area to be used as a factor in determining the allowable for the production of gas from the Basal Blairmore member through the well Brink Fargo Hespero 4-5-39-3 be the area of its spacing unit)
- Date
- 1963
- Applicant
- Brinkerhoff Drilling Co. Ltd.
- Application Number
- 1354
- Hearing Panel
- King RH
- Lashuk NJ
- Hearing Type
- Examiners
- Category
- Gas production
- Descriptors
- Allowable production
- Gas producing
- Basal Blairmore sandstone
- Spacing unit
- Sylvan Lake area
- NTS 83B
- Legal References
- Drilling and Production Regulation S9
- Notes
- Examiners report E63-(P.054) on application No. 1354 for an order of the Board (a) waiving the provisions of section 9 of the Drilling and Production Regulations and (b) directing that the area to be used as a factor in determining the allowable for the production of gas from the Basal Blairmore member through the well Brink Fargo Hespero 4-5-39-3 be the area of its spacing unit.
- Approval
- Approved