Application 1001801
https://had.aer.ca/link/application38702
- Applicant
- Crestar Energy Inc.
- Summary
- Requesting good production practice status with GOR penalty relief, concurrent production and approval to expand the pool boundary to include Lsd's 12-12, 16-16, 10-21 and 6-22-21-26W4 to the Herronton Tuner Valley K pool.
- Decision/Order/Approval
- Approved by letter dated 19970620
- Date Registered
- Jul. 30, 1996
- Applicant
- Crestar Energy Inc.
- Summary
- Requesting good production practice status with GOR penalty relief, concurrent production and approval to expand the pool boundary to include Lsd's 12-12, 16-16, 10-21 and 6-22-21-26W4 to the Herronton Tuner Valley K pool.
- Category
- Oil
- Area
- Herronton Turner Valley K
- Date Registered
- Jul. 30, 1996
- Decision/Order/Approval
- Approved by letter dated 19970620
- Special Report
- Simulation Study of Herronton Mississippian Turner Valley Pool in 21-26W4, by SCMK Development and Engineering Ltd., dated 19960212
- Petrophysical Evaluation of the Mississippian Turner Valley Zones in 21-26W4, by Atoll Engineering Services Ltd, dated 1995/11