Skip header and navigation
AER Historical Applications and Decisions AER HAD
  • New Search
  • Help
  • Selections 0
Print PDF
Toggle Detail View

Application 1006107

https://had.aer.ca/link/application38076
Applicant
Canadian 88 Energy Corp.
Delta Hudson Engineering
Summary
Requesting approval to modify the existing sulphur recovery gas processing facility located at 6-18-32-1W5. The modifications consist of a mole sieve propane treating unit to handle 165 metres cubed/day of propane to remove organic sulphur and water, and to modify the existing mole sieve propane treating unit to handle 135 metres cubed/day of butane to remove mercaptans.
Decision/Order/Approval
Approval 1996-128
Date Registered
Feb. 27, 1997
More detail
Applicant
Canadian 88 Energy Corp.
Delta Hudson Engineering
Summary
Requesting approval to modify the existing sulphur recovery gas processing facility located at 6-18-32-1W5. The modifications consist of a mole sieve propane treating unit to handle 165 metres cubed/day of propane to remove organic sulphur and water, and to modify the existing mole sieve propane treating unit to handle 135 metres cubed/day of butane to remove mercaptans.
Category
Gas
Descriptors
Gas processing
Amendment of gas plant facilities
Area
Garrington
Date Registered
Feb. 27, 1997
Decision/Order/Approval
Approval 1996-128
Less detail
  • Share
    Facebook Twitter LinkedIn
  • Permalink
External Links
  • Copyright and Disclaimer
  • Privacy Statement
  • Social Media Terms of Use
Contact Us

Phone: 403-297-8311
informationrequest@aer.ca

Connect With Us
  • Twitter
  • LinkedIn
  • YouTube
Alberta Energy Regulator © 2023